| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-AOC | ₹3.5 Cr | L1 | Accepted-AOC due to L1 |
| 2 | L2₹3.5 CrRejected-Finance | ₹3.5 Cr | L2 | Rejected-Finance due to L2 |
| Sl No | Description | Qty | Unit | GIKEN KAMBU L2 | M/S JILEN ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Sub Head:: SITE DEVELOPMENT: | |||||
| 2.00 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines,grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m). | 1,549 | Cum | 106.56 ₹1.7 L | 118.56 ₹1.8 L |
| 3.00 | Excavation in Ordinary Rockusing Hydraulic ExcavatorCK-90 and Tippers with disposal upto 1000 metres. (Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) | 2,323.56 | Cum | 133.91 ₹3.1 L | 155 ₹3.6 L |
| 4.00 | 5 FOR HILL ROADSLoading and Unloading of Stone Boulder / Stone aggregates / Sand / Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stone for hill roads. PlaExcavation in Ordinary Rockusing Hydraulic | 3,872.6 | Cum | 229.15 ₹8.9 L | 247.15 ₹9.6 L |
| 5.00 | SUB-HEAD:: BUILDING PORTION GROUND FLOOR
SUB HEAD: EARTHWORK IN EXCAVATION: Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. a)Ordinary Rock | 283.58 | Cum | 332.88 ₹94,398.11 | 332.88 ₹94,398.11 |
| 6.00 | Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete. | 170.15 | Cum | 176.72 ₹30,068.91 | 176.72 ₹30,068.91 |
| 7.00 | SUB HEAD: CEMENT CONCERETE: Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 25.04 | Cum | 5,599.82 ₹1.4 L | 5,599.82 ₹1.4 L |
| 8.00 | Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in:b) Walls including attached buttresses, pilasters and their caps and bases and string courses etc. up to floor two level.(Wall) | 31.83 | Cum | 6,265.76 ₹2.0 L | 7,265.76 ₹2.3 L |
| 9.00 | SUB HEAD :: RCC WORK:Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 50.64 | Cum | 8,344.51 ₹4.2 L | 8,344.51 ₹4.2 L |
| 10.00 | Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement.c) 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 14.58 | Cum | 9,911.78 ₹1.4 L | 9,911.78 ₹1.4 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹3.5 L
Closing Date
25 Feb 2026, 4:00 pmClosed
Executive Engineer
EE Chamber Central Division, APHWCL,PHQ
Construction Two Bay Fire Station Building at Kamba, West Siang District.
2026_APP_2956_1
PH/EC/EE(CD)/E-NIT/2025-26/01
Open Tender
Civil Works
Kamba
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
Yes
Payable To Executive Engineer,Central Division
₹3.5 L
Yes
12 Mar 2026
18 Feb 2026
27 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid