Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3.2 Cr
EMD Value
₹6.5 L
Closing Date
25 Nov 2026, 12:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Regional Director RBI Kanpur
Regional Director RBI Kanpur
Design Supply Installation Testing and Commissioning (DSITC) of 3 nos of 250 TR water cooled screw chillers at Main Office Building of RBI Kanpur
2026_RBI_295465_1
RBIKanpur_ChillerPlant_FY2627
Open Tender
Electrical Works
Works
Kanpur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6.5 L
23 Oct 2026
23 Oct 2026
26 Nov 2026
23 Oct 2026
25 Nov 2026
14 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WATER COOLED MULTI/ Single COMPRESSORS SCREW CHILLERS | |||||
| 1.1 | Supply, installation, testing and commissioning (SITC) of AHRI certified and ECBC compliant, ASME stamping water cooled packaged screw (with single/multiple compressors) chiller of minimum 250 TR, ecofriendly refrigerant, min BEE 4 star rated capacity with VFD, of specified design conditions and conforming as per technical specification mentioned in the tender | 3 | sets | - | - |
| 1.2 | Supply, installation, testing & commissioning of Chilled Water Line Flow Switch with required modification in the pipeline as per site requirement. | 4 | Nos | - | - |
| 2Remote monitoring system | |||||
| 2.1 | Supply, Installation, Testing and Commissioning of Client Workstation for remote viewing of all three chiller parameters with required operating system, mouse and keyboard complete as per detailed specifications and integration of 32`` colour graphics LED Monitor to view and monitor the various parameters of all the three chiller plants. It should be controlled through window licensed Software including supply of all required connecting cables, connectors, any other required hardware, software licenses etc. compatible with BMS platform to complete the job as per detailed technical specifications mentioned in the tender. Chiller Plant Monitoring Software - On Premise, should work without internet and data cannot be uploaded to Cloud, Not-recurring charges yearly, Customizable Dashboards/GUI, is hall included Decision table and Network diagram, shall be upgradable to Control and Optimize later if required by the Client, with open integration via Banat/IP and Modbus TCP/IP; the platform shall be scalable and upgradeable in future to Chiller Plant Control & Optimization (CPO), including sequencing and optimization, if required by the Client, without replacement of the complete monitoring platform. PC/Workstation with i5, 8GB RAM and 512GB SSD, MS Office Software. 32" monitor Field server/Gateway cat 6 cable | 1 | nos | - | - |
| 3 | CHILLED WATER PUMPSETS: SITC of End suction / Horizontal Split Casing type 30HP 2500 LPM and min head 30 meter chilled water Pump set with VFD control and IE4 type for air conditioning system. Complete with TEFC motor, base plate, mechanical seal, coupling with guard, gauges etc. for flow and operating head and insulation of pump set body with electrical/ control cable connection, hardware, paint as per approved drawing etc. shall be BMS Compatible as per technical specifications mentioned in the tender. The matching VFDs of IP20 rating with pulse width modulation (PWM)type, one dedicated microprocessor-based pump controller with parallel pumping software is to be duly installed. The Pump Controller shall have programs to safeguard the system against the following conditions Pump flow surges, System Hunting, End of curve protection. and capable of running each individual pumps | 3 | sets | - | - |
| 4 | CONDENSER WATER PUMPSETS: SITC of End suction / Horizontal Split Casing type condenser water pump set of size 40 HP, 3200 LPM and min head 30 mtr and IE4 , for air conditioning system. Complete with TEFC motor, base plate, mechanical seal, coupling with guard, gauges etc. for flow and operating head and insulation of pump set body with electrical/ control cable connection, hardware, paint as per approved drawing etc. and shall be BMS Compatible as per technical specifications mentioned in the tender | 3 | sets | - | - |
| 5INSULATED VALVES SITC of following valves, strainers, gauges in the water pipeline with the same specifications as the connected piping and adequately supported as per technical specifications mentioned in the tender and required modifications in the existing pipeline including welding, elbows, tees, flanges, or spool etc. as per site requirement | |||||
| 5.1 | BALANCING VALVE : SITC of insulated balancing valve with built in measuring facility with CI body flanged construction with EPDM coated disc with long pitch with protected out pipe insulation and PN16pressure rating for chilled and hot water circulation of size 200 mm dia. with built in measuring facility complete with insulated flanges, bolts, etc. as per technical specification mentioned in the tender | 4 | nos | - | - |
| 5.2 | Butterfly valve :SITC of buttefly valve with CI body SS disc nitrile sheet O ring and PN 16 pressure rating as specified of 200 mm dia. with built in measuring facility complete with insulated flanges, bolts, etc. as per technical specification mentioned in the tender and duly insulated | 8 | nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
TenderDocument.pdf
Tender Documents • 1.68 MB
BOQ_344460.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .