Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.0 LAccepted-AOC 134 1 SAKTHI THEATER STREET NEHRU NAGAR KARUMALAIKOODAL METTUR DAM 02 | METTUR DAM | TAMIL NADU | L1 | Accepted-AOC L1 Tenderer | |
| 2 | L2₹16.7 L+₹1.0 L (6.54%)Rejected-Finance 2ND FLOOR 1 A LADABHAI MANSION MAMA PARMANAND MARG OPERA HOUSE MUMBAI MUMBAI MAHARASHTRA 400004 | MUMBAI | MAHARASHTRA | 400004 | L2 | Rejected-Finance L2 bidder |
Tender Value
Refer Docs
EMD Value
₹16,300
Closing Date
12 Aug 2024, 2:00 pmClosed
CE/MTPS-II
MTPS-II, Mettur Dam
MTPS II Mech II CHP II Stacker Cum Reclaimer Machine II Overhauling of Dual Line Grease Lubrication System Centralized Lubrication Power pack I II III units
2024_EB_466570_1
OT06 / 24-25
Open Tender
Miscellaneous Works
Works
90 days
MTPS-II / Mettur Dam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹16,300
Yes
9 May 2025
26 Jul 2024
13 Aug 2024
26 Jul 2024
12 Aug 2024
26 Jul 2024
Amount
Charges for complete dismantling of the badly corroded/rusted Seamless Pipelines, distribution points, broken copper tubes, grease nipples and cleaning the entire area of the pipe routes of SCR-II Lubrication Power pack-I unit /Lubrication Power pack-II unit/ Lubrication Power pack-III Unit.
Charges for cold cutting of the seamless pipes to the required sizes, by marking, bending by cold bending process, end preparations, filing the ends of pipes, copper tubes, welding the pipe clamps in position and erecting the seamless pipes and the grease distribution points of SCR-II power pack of Lubrication Power pack-I unit /Lubrication Power pack-II unit/ Lubrication Power pack-III Unit including supply of materials and other required consumables, T&Ps and PPE’s
Charges for Dismantling the defective / worn-out centralized change over valve end of line assembly pressure switch relay based control panel with necessary main lines and replacing with New END OF LINE ASSLY WITH CRCS ENCLOSURE including supply of materials and other required consumables, T&Ps and PPE’s
Charges for complete overhauling of the Auto grease lubrication unit including grease pump, strainers, valves, replace the damaged grease distribution points and correct all the grease points inside the discharge chute for the slewing ring mechanism with flexible hoses in SCR-II Lubrication Power pack-I unit /Lubrication Power pack-II unit/ Lubrication Power pack-III Unit including supply of materials and other required consumables, T&Ps and PPE’s
Charges for aligning the pipes with the joints, supports fixing in SCR-II Lubrication Power pack-I unit /Lubrication Power pack-II unit/ Lubrication Power pack-III Unit including supply of materials and other required consumables, T&Ps and PPE’s
Charges for Supply of Seamless Carbon Tube as per DIN 2391 for 6 Nos. of Power Pack OD 22 mm (20mmx 2 mm Thk.) ST 35 for SCR- II lubrication Power Packs.
Charges for Supply of Seamless Carbon Tube as per DIN 2391 for 6 Nos. of Power Pack OD 10 mm (10 mm x 1.5 mm Thk.) ST35 for SCR-II lubrication Power Packs
Charges for Supply of Way Valve (Distributor Valve) - Model MET DEV VSG 2 KR - 6 Nos. MET DEV VSG 4 KR- 10 Nos. MET DEV VSG 6 KR - 2 Nos. MET DEV VSG 8 KR- 12 Nos. for SCR- II lubrication Power Packs.
Hydac (India) Pvt.Ltd (BID ID -1101867)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .