Tender Value
₹22.9 L
EMD Value
₹22,900
Closing Date
6 Aug 2026, 2:00 pm
SE/GCC-I/CNI
230 KV GIS SS COMPLEX, A-10, THIRU-VI-KA INDUSTRIAL ESTATE, GUINDY, CHENNAI-32.
as per NIT
2026_EB_688100_1
OT-009/26-27 of SE/GCC-I/CNI
Open Tender
Civil Works
Works
120 days
Thiruvannamalai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹22,900
Yes
23 Jul 2026
23 Jul 2026
7 Aug 2026
23 Jul 2026
6 Aug 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engaging JCB for levelling the ups and downs of the location for making of foundation including cost of all labour, transport, T&P, lead lift etc., complete as directed by the department engineer at site. | 4 | Hrs. | - | - |
| 2 | Labour charges for dismantling the Plain Cement Concrete met with below ground level during execution including labour, tools etc. complete. as directed by the department Engineer at site. | 10.8 | M3 | - | - |
| 3 | Labour charges for dismantling of Reinforced Cement Concrete and disposing the debris away from the SS permises including all materials, labour, lead and lift etc., complete as directed by the department engineer at site. | 1 | M3 | - | - |
| 4 | Labour charges for dismantling, clearing away and carefully stacking materials usefull for re-use of existing damaged Brick work / stone Masonry including the cost of all labour, transport, T&P, lead and lift etc., complete as directed by the department engineer at site. | 1 | M3 | - | - |
| 5 | Earth work excavation soil and depositing on bank with initial lead of 10m to 100m and lift of 3m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site. | 216.75 | M3 | - | - |
| 6 | Supply and Filling with the foundation and basement with sand in layers not more than 10 cm thick well rammed including watering and consolidation as per standard specification, including cost of all labour, material, lead and lift etc., complete. as directed by the department at site. | 11.13 | M3 | - | - |
| 7 | Transporting the Surplus excavated earth, debris etc away from the site to a lead of 5km including cost of all lead, lift, conveyance, loading, unloading etc.,complete as per standerd specification and as directed by the department at site. | 50 | M3 | - | - |
| 8 | Labour charges for Re filling of foundation with excavated earth other then sand in layers of 15cm thick, including charges for spreading watering, consolidation as per standard specification and as directed by the engineer at site including all labour, transport charges, lead and lift etc., complete. | 120 | M3 | - | - |
| 9 | Plain Cement Concrete 1:3:6 using 20 mm HBG stone including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site. | 8.82 | M3 | - | - |
| 10 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal for raft including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work | 18.06 | M3 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
OT009.pdf
Tender Documents • 0.91 MB
BOQ_827080.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].