Tender Value
₹21 L
EMD Value
₹21,000
Closing Date
1 Sept 2020, 2:00 pmClosed
SE/GCC/Madurai
SE/GCC/MADURAI
EWE SS Concreting intro 01 nos LSR 9m railway KM 67/700-800 MDU-Bodi railway Loc 31
2020_EB_177140_1
SE-GCC-MDU SPEC.NO.017/2020-21
Open Tender
Civil Works
Works
90 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
Yes
THE SUPERINTENDING ENGINEER/GCC/MADURAI
₹21,000
Yes
21 Sept 2020
25 Aug 2020
2 Sept 2020
25 Aug 2020
1 Sept 2020
25 Aug 2020
Amount
Clearing juliflora jungle without uprooting including all cost of labour lead lift etc complete.
Conducting check survey marking of the pits for tower foundation as per the approved profile including measurements cutting of light and heavy jungels as may be required including cost of all T & ps, transport, labour, lead lift etc complete.
Earthwork excavation in hard stiff clay black cotton hard red earth shales murram gravel stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete.
Earthwork excavation & deposting on bank with initial lead of 10 M & initial lift of 2 M on SDR, laterite, soft rock or kankar not requiring blasting.
Earthwork excavation in medium rock, dense medium rock requring blasting
Removing hard rock by wedging, chiselling and trimming to proper shape where blasting is prohibited
Fixing of stub and cleat,transporting of template and stubs from store to site and assembling at site and shifting the template from loc to loc and back to stores. LSR+9 Wet
PCC 1:4:8 using 40mm metal for foundation without formwork including cost of all materials lead lift etc complete.
RCC 1:1.5:3 using 20mm metal (machine crushed) for footings and chimney including cost of all materials lead lift etc complete including cost of Chimney box , footing box etc.
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. LSR+9 Wet
Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials lead lift etc complete.
Transport of and Sorting out of basic tower parts transporting the same to site, unloading at site, erection of towers, tightening punching of bolts and nuts including all lead lift labour etc complete including charges for rectification of tower parts if any including labour lead lift etc complete during LC period
PCC 1:2:4 using 20mm machine crushed metal for muffing and coping including all cost of shuttering charges lead lift labour materials etc complete
Painting with anticorrosive paint, two coats including cost of all materials lead lift etc complete
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials hire charges for diesel generator and welding transformer all labour transport charges etc complete.
Supply of GI Bolt & Nut as per TNEB standard specifications
Anticlimbing device for tower protection upto 8.00m with barbed fencing with TNEB standard specification
Plastering with CM 1:3, 12mm thick including cost of all materials lead lift etc complete.
Removal of surplus earth from the site and put into low lying area to a average distance of 300m by head load.
Supply of steel reinforcement including cost of binding wire,materials,labour,lead,lift etc., complete
Conducting detailed survey by conducting Theodolite alignment survey,chain survey , fly leaveling and Preparation and supply of crossing drawing ( 10 copies for each crossing) for Railway lines and supply xerox, Amonia print including cost of all materials lead, lift, etc., complete
Special type earthing for railway crossing including cost of 2 Nos 40 mm dia CI pipe ,barbed wire and labour,material,etc., complete.
Labour charges for Anticlimbing Device for tower protection
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
V ALAGUDURAI
S.PANDIYAN
petchimuthu
M.RAMALINGAM
HARISH CONSTRUCTION
MAHARAJA CONSTRUCTION
JERALIN JERISH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .