| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | ₹5.0 L | L1 | Accepted-AOC Due To L1 |
| 2 | L2₹6.0 LRejected-Finance R O VILL GARH P O BARRAM TEHSIL JAISINGHPUR DISTT KANGRA H P | KANGRA | HIMACHAL PRADESH | 175013 | ₹6.0 L | L2 | Rejected-Finance Due to L2 |
| 3 | L3₹8.6 LRejected-Finance N A | PALWAL | HARYANA | 121004 | ₹8.6 L | L3 | Rejected-Finance Due to L3 |
| 4 | L4₹8.8 LRejected-Finance VILLAGE AND PO SHIYAH TEHSIL BHUNTAR DISTT KULLU H P | ₹8.8 L | L4 | Rejected-Finance Due to L4 |
| 5 | L5₹9.1 LRejected-Finance | ₹9.1 L | L5 | Rejected-Finance Due to L5 |
| Sl No | Description | Qty | Unit | Ajay Kumar Bassi L3 | KAMAL JEET L1 | Ashish Kumar L4 | Sandeep Jaswal L5 | Ashwani Kumar L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden battons and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4.00mtrs. and removal of the same for in-situ-reinforced and plain concrete work in:- | ||||||||
| 2.00 | Vertical surface such as walls (any thickness) partitions and the like including attached pillasters,buttresses, plinth and string courses and the like within all leads and lifts. | 120.06 | Sqm | 420 ₹50,425.20 | 120 ₹14,407.20 | 450 ₹54,027 | 390 ₹46,823.40 | 260 ₹31,215.60 |
| 3.00 | Flat surfaces such as soffits of suspended floor, roofs, landings and the like floor etc. upto 20mm thickness within all leads and lifts. | 40.48 | Sqm | 560 ₹22,668.80 | 170 ₹6,881.60 | 560 ₹22,668.80 | 560 ₹22,668.80 | 380 ₹15,382.40 |
| 4.00 | Providing and laying cement concrete work 1:1.5:3 (One cement : 1.5 sand : Three graded stone aggregate 20mm nominal size and curing complete excluding cost of form work Foundation and plinth | 4.55 | Cum | 8,600 ₹39,130 | 5,600 ₹25,480 | 8,600 ₹39,130 | 8,600 ₹39,130 | 6,500 ₹29,575 |
| 5.00 | Vertical surface such as walls (any thickness) partitions and the like including attached pillasters,buttresses, plinth and string courses and the like within all leads and lifts. | 11.8 | Cum | 8,890 ₹1.0 L | 5,700 ₹67,260 | 9,000 ₹1.1 L | 9,000 ₹1.1 L | 6,800 ₹80,240 |
| 6.00 | In suspended floors,landing & shelves & their support balconies, Beams,girders,bressumber & cantilever upto floor two level. | 7.92 | Cum | 8,300 ₹65,736 | 5,400 ₹42,768 | 9,000 ₹71,280 | 9,000 ₹71,280 | 6,700 ₹53,064 |
| 7.00 | Providing tor steel reinforcement for RCC work including bending binding and placing in position with in all leads and lifts complete in all respect. | 2,184.82 | Kg | 103 ₹2.3 L | 78.5 ₹1.7 L | 103 ₹2.3 L | 103 ₹2.3 L | 85 ₹1.9 L |
| 8.00 | Manufactureing , febrication & fixing of main hole cover of 0.60X0.60 m. size made of M.S sheet 2.0 mm thick with M.S angle 35X35X5 mm thick with hinges one side and sliding door bolt for locking arangement i/c cutting, welding and priming & painting two coats of anamel paint complete in all respect to entire satisfaction of the Engineer-in-charge. | 35 | Each | 5,500 ₹1.9 L | 2,900 ₹1.0 L | 5,700 ₹2.0 L | 6,500 ₹2.3 L | 3,500 ₹1.2 L |
| 9.00 | Desilting Infilterations gallery with complete dewatering of existing stanting water and pumping out slury and debris, disposing of extracted material with in all leads and lifts as per directions of Engineer-in-Charge. | 104.13 | Cum | 1,510 ₹1.6 L | 666 ₹69,350.58 | 1,600 ₹1.7 L | 1,600 ₹1.7 L | 750 ₹78,097.50 |
Tender Value
₹8.6 L
EMD Value
₹17,206
Closing Date
10 Apr 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division Amb
Sub Head Construction of RCC jacketing to damaged infiltration gallery and desilting of wet malwa.
2026_HPIPH_132963_1
RRD of LWSS Jawal Badhmana Job-5
Open Tender
Civil Works
Amb
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
₹17,206
27 Apr 2026
31 Mar 2026
10 Apr 2026
31 Mar 2026
10 Apr 2026
31 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden battons and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4.00mtrs. and removal of the same for in-situ-reinforced and plain concrete work in:- | |||||
| 2Vertical surface such as walls (any thickness) partitions and the like including attached pillasters,buttresses, plinth and string courses and the like within all leads and lifts. | |||||
| 3Flat surfaces such as soffits of suspended floor, roofs, landings and the like floor etc. upto 20mm thickness within all leads and lifts. | |||||
| 4Providing and laying cement concrete work 1:1.5:3 (One cement : 1.5 sand : Three graded stone aggregate 20mm nominal size and curing complete excluding cost of form work Foundation and plinth | |||||
| 5Vertical surface such as walls (any thickness) partitions and the like including attached pillasters,buttresses, plinth and string courses and the like within all leads and lifts. | |||||
| 6In suspended floors,landing & shelves & their support balconies, Beams,girders,bressumber & cantilever upto floor two level. | |||||
| 7Providing tor steel reinforcement for RCC work including bending binding and placing in position with in all leads and lifts complete in all respect. | |||||
| 8Manufactureing , febrication & fixing of main hole cover of 0.60X0.60 m. size made of M.S sheet 2.0 mm thick with M.S angle 35X35X5 mm thick with hinges one side and sliding door bolt for locking arangement i/c cutting, welding and priming & painting two coats of anamel paint complete in all respect to entire satisfaction of the Engineer-in-charge. | |||||
| 9Desilting Infilterations gallery with complete dewatering of existing stanting water and pumping out slury and debris, disposing of extracted material with in all leads and lifts as per directions of Engineer-in-Charge. | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
form6and8_5.pdf
Tender Documents • 0.83 MB
condition_5.pdf
Tender Documents • 0.33 MB
BOQ_196651.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid