Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹8.9 L |
Tender Value
₹14.9 L
EMD Value
₹30,000
Closing Date
7 May 2026, 3:00 pmClosed
Amit Anand
Executive Enigineer
Irrigation Division, Shekhpura
SUSHIL PRAKASH
SE
Bed clearance and jungle clearance in Right Nata Canal from 4.40 KM to 15.70 KM under Irrigation Division, Nawada.
130032
01/2026-27/Nawada
Open Tender
CIVIL
Nawada
• Earnest Money
• Time of Completion
• Registration No.
• Character Certificate
• Affidavit in required format (Should be after the publication date of the NIT)
CIVIL
PERCENTAGE
L1
1
7 documents required · 7 mandatory
₹2,500
Processing Fee: 590
₹30,000
11 Jul 2026
29 Apr 2026
8 May 2026
29 Apr 2026
7 May 2026
29 Apr 2026
TECHNICAL SHEET
Name of Work Bed clearance and jungle clearance in Right Nata Canal from 4.40 KM to 15.70 KM under Irrigation Division, Nawada. Cost of Work as per BOQ Rs. 14,85,120.00 Date of Completion Two Months
Last date of uploading Tender 07.05.2026
Sl No. Items Requirement
1 Name of the contractor
2 Address of the contractor
3 Earnest Money As per NIT issued in the name of Executive Engineer, Irrigation Division, Nawada. (Pay either online or offline)
Bid Security Amount - Rs. 30,000.00 Bid Security Amount - Rs.
Bid validity periods in days- 120 days Bid validity periods in days
4 Registration No.
6 G.S.T. Registration
7 Character Certificate
8 Affidavit in required format (Should be after the publication date of the NIT)
9 Any other Document as Per NIT.
ch offset distt bm rl
EARTHWORK CALCULATION
NAME OF WORK :- Estimate for bed clearence and jungle clearnance in Right Nala Canal from 4.40KM to 15.70KM under Irrigation Division Nawada.
SL NO CH(IN KM) LENGTH( IN MTR) CUTTING AREA( IN SQM) CUTTING MEAN AREA (IN SQM) CUTTING QTY (IN CUM) FILL AREA(SQM) FILL MEAN AREA(SQM) LENGTH( IN MTR) FILL QTY(CUM)
QTY OF JUNGLE CLEARNACE
NAME OF WORK :- Estimate for bed clearence and jungle clearnance in Right Nala Canal from 4.40KM to 15.70KM under Irrigation Division Nawada.
SL NO CHAIN IN ( KM ) LENGTH IN ( M ) SLOPE+BANK MEAN NET WIDH(MTR) QUANTITY IN SQM
Less Gap @40% 14884.10
EARTHWORK CALCULATION
N/W-Dsilting of Juri-Sathe Distributory from KM- 00 to KM-1.51under Irrigation division,Nawada.
SL NO CH(IN KM) LENGTH( IN MTR) C/S AREA( IN SQM) MEAN C/A (IN SQM) QTY (IN CUM)
ANALYSIS OF RATE
1 5.1.43 Jungle clearance in borrow area, building premises; flanks, slope of existing road and canal etc,embankment by removing the jungle , bushes from top including weeding out shrubs including roots and leveling complete job as per specifications and direction of E/I.
Taking Out put =92.94 Sqm
Unskilled mazdoor for carrying 0.75 nos 428.00 321.00 {SI-1}
Add Overhead charge & C.P@15% 48.15
Rate per sqm Say Rs 4.00 Per M2
2 5.1.47 Earth work by excavator and spreader or tractor- leveler in lower level canal or flood embankment or dhar ( Like Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not needed ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with all lifts all complete jobas per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth )
(A) Cost of cutting, loading , unloading & placing by excavator 1 M3 capacity
Use rate of Excavator(Rupees per hour) 2288.00 PM3005
Output of Excavator =60 Cum per hour
(B) Cost of spreading by D-80 Dozer
Use rate of D-80 Dozer(Rupees per hour) 4334.00 PM1002
Output of D-80 Dozer =300 Cum per Hour
( C) For dressing & finishing one labour for 100 M3
Unskilled labour 0.01 no 428.00 4.28 {SI-1}
Add Overhead charge & C.P@15% 8.53
Rate per cum Say Rs 65.40 Per M3
Add Royality @ Rs 33.00 33.00 Per M3
Rate per cum Say Rs 98.40 Per M3
ABSTRACT OF COST
NAME OF WORK :- Estimate for bed clearence and jungle clearnance in Right Nala Canal from 4.40KM to 15.70KM under Irrigation Division Nawada.
SL NO SOR NO ITEM OF WORK QUANTITY UNIT RATE AMOUNT(Rs)
1 5.1.43 Jungle clearance in borrow area, building premises; flanks, slope of existing road and canal etc,embankment by removing the jungle , bushes from top including weeding out shrubs including roots and leveling complete job as per specifications and direction of E/I. 22326.15 Sqm 4.00 89304.60
2 5.1.47 Earth work by excavator and spreader or tractor- leveler in lower level canal or flood embankment or dhar ( Like Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not needed ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with all lifts all complete jobas per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ) 12035.00 cum 98.40 1184244.00
ADD LABOUR CESS @ 1 % 12735.49
ADD SEIGNORAGE FEE @ 10% OF EW Qty(12035x33x10%) 39715.50
SUB TOTAL 1325999.59
TOTAL 1485119.54
ADD CONTINGENCY @ 1 % 14851.20
GRAND TOTAL 1499970.73
Bill of Quantity
NAME OF WORK :- Estimate for bed clearence and jungle clearnance in Right Nala Canal from 4.40KM to 15.70KM under Irrigation Division Nawada.
Estimated Cost:- Rs 1485120.00
Cost of BOQ:- Rs 2500.00
Earnest money required:- Rs 29700.00
Date of complition:-
SL NO SOR NO ITEM OF WORK QUANTITY UNIT RATE AMOUNT(Rs)
1 5.1.43 Jungle clearance in borrow area, building premises; flanks, slope of existing road and canal etc,embankment by removing the jungle , bushes from top including weeding out shrubs including roots and leveling complete job as per specifications and direction of E/I. 22326.15 Sqm 4.00 89304.60
2 5.1.47 Earth work by excavator and spreader or tractor- leveler in lower level canal or flood embankment or dhar ( Like Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not needed ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with all lifts all complete jobas per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ) 12035.00 cum 98.40 1184244.00
Total 1273548.60
ADD LABOUR CESS @ 1 % 12735.49
ADD SEIGNORAGE FEE @ 10% OF EW Qty(12035x33x10%) 39715.50
SUB TOTAL 1325999.59
TOTAL 1485119.54
DETAILS OF ESTIMATE
NAME OF WORK :- Estimate for bed clearence and jungle clearnance in Right Nala Canal from 4.40KM to 15.70KM under Irrigation Division Nawada.
SL NO SOR NO ITEM OF WORK
1 5.1.43 Jungle clearance in borrow area, building premises; flanks, slope of existing road and canal etc,embankment by removing the jungle , bushes from top including weeding out shrubs including roots and leveling complete job as per specifications and direction of E/I.
QTY as per jungle clearnace qty sheet=22326.15 sqm
2 5.1.47 Earth work by excavator and spreader or tractor- leveler in lower level canal or flood embankment or dhar ( Like Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not needed ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with all lifts all complete jobas per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth )
QTY as per cross section=12035.00 cum
ch offset distt bm rl
EARTHWORK CALCULATION
NAME OF WORK :- Estimate for bed clearence and jungle clearnance in Right Nala Canal from 4.40KM to 15.70KM under Irrigation Division Nawada.
SL NO CH(IN KM) LENGTH( IN MTR) CUTTING AREA( IN SQM) CUTTING MEAN AREA (IN SQM) CUTTING QTY (IN CUM) FILL AREA(SQM) FILL MEAN AREA(SQM) LENGTH( IN MTR) FILL QTY(CUM)
QTY OF JUNGLE CLEARNACE
NAME OF WORK :- Estimate for bed clearence and jungle clearnance in Right Nala Canal from 4.40KM to 15.70KM under Irrigation Division Nawada.
SL NO CHAIN IN ( KM ) LENGTH IN ( M ) SLOPE+BANK MEAN NET WIDH(MTR) QUANTITY IN SQM
Less Gap @40% 14884.10
EARTHWORK CALCULATION
N/W-Dsilting of Juri-Sathe Distributory from KM- 00 to KM-1.51under Irrigation division,Nawada.
SL NO CH(IN KM) LENGTH( IN MTR) C/S AREA( IN SQM) MEAN C/A (IN SQM) QTY (IN CUM)
ANALYSIS OF RATE
1 5.1.43 Jungle clearance in borrow area, building premises; flanks, slope of existing road and canal etc,embankment by removing the jungle , bushes from top including weeding out shrubs including roots and leveling complete job as per specifications and direction of E/I.
Taking Out put =92.94 Sqm
Unskilled mazdoor for carrying 0.75 nos 428.00 321.00 {SI-1}
Add Overhead charge & C.P@15% 48.15
Rate per sqm Say Rs 4.00 Per M2
2 5.1.47 Earth work by excavator and spreader or tractor- leveler in lower level canal or flood embankment or dhar ( Like Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not needed ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with all lifts all complete jobas per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth )
(A) Cost of cutting, loading , unloading & placing by excavator 1 M3 capacity
Use rate of Excavator(Rupees per hour) 2288.00 PM3005
Output of Excavator =60 Cum per hour
(B) Cost of spreading by D-80 Dozer
Use rate of D-80 Dozer(Rupees per hour) 4334.00 PM1002
Output of D-80 Dozer =300 Cum per Hour
( C) For dressing & finishing one labour for 100 M3
Unskilled labour 0.01 no 428.00 4.28 {SI-1}
Add Overhead charge & C.P@15% 8.53
Rate per cum Say Rs 65.40 Per M3
Add Royality @ Rs 33.00 33.00 Per M3
Rate per cum Say Rs 98.40 Per M3
ABSTRACT OF COST
NAME OF WORK :- Estimate for bed clearence and jungle clearnance in Right Nala Canal from 4.40KM to 15.70KM under Irrigation Division Nawada.
SL NO SOR NO ITEM OF WORK QUANTITY UNIT RATE AMOUNT(Rs)
1 5.1.43 Jungle clearance in borrow area, building premises; flanks, slope of existing road and canal etc,embankment by removing the jungle , bushes from top including weeding out shrubs including roots and leveling complete job as per specifications and direction of E/I. 22326.15 Sqm 4.00 89304.60
2 5.1.47 Earth work by excavator and spreader or tractor- leveler in lower level canal or flood embankment or dhar ( Like Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not needed ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with all lifts all complete jobas per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ) 12035.00 cum 98.40 1184244.00
ADD LABOUR CESS @ 1 % 12735.49
ADD SEIGNORAGE FEE @ 10% OF EW Qty(12035x33x10%) 39715.50
SUB TOTAL 1325999.59
TOTAL 1485119.54
ADD CONTINGENCY @ 1 % 14851.20
GRAND TOTAL 1499970.73
Bill of Quantity
NAME OF WORK :- Estimate for bed clearence and jungle clearnance in Right Nala Canal from 4.40KM to 15.70KM under Irrigation Division Nawada.
Estimated Cost:- Rs 1485120.00
Cost of BOQ:- Rs 2500.00
Earnest money required:- Rs 29700.00
Date of complition:-
SL NO SOR NO ITEM OF WORK QUANTITY UNIT RATE AMOUNT(Rs)
1 5.1.43 Jungle clearance in borrow area, building premises; flanks, slope of existing road and canal etc,embankment by removing the jungle , bushes from top including weeding out shrubs including roots and leveling complete job as per specifications and direction of E/I. 22326.15 Sqm 4.00 89304.60
2 5.1.47 Earth work by excavator and spreader or tractor- leveler in lower level canal or flood embankment or dhar ( Like Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not needed ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with all lifts all complete jobas per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ) 12035.00 cum 98.40 1184244.00
Total 1273548.60
ADD LABOUR CESS @ 1 % 12735.49
ADD SEIGNORAGE FEE @ 10% OF EW Qty(12035x33x10%) 39715.50
SUB TOTAL 1325999.59
TOTAL 1485119.54
DETAILS OF ESTIMATE
NAME OF WORK :- Estimate for bed clearence and jungle clearnance in Right Nala Canal from 4.40KM to 15.70KM under Irrigation Division Nawada.
SL NO SOR NO ITEM OF WORK
1 5.1.43 Jungle clearance in borrow area, building premises; flanks, slope of existing road and canal etc,embankment by removing the jungle , bushes from top including weeding out shrubs including roots and leveling complete job as per specifications and direction of E/I.
QTY as per jungle clearnace qty sheet=22326.15 sqm
2 5.1.47 Earth work by excavator and spreader or tractor- leveler in lower level canal or flood embankment or dhar ( Like Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not needed ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with all lifts all complete jobas per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth )
QTY as per cross section=12035.00 cum
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT-01_2026-27_Nawada.pdf
NIT • 1.97 MB
letter_00124_m.pdf
NIT • 0.25 MB
NIT-01_2026-27_Nawada.pdf
NIT • 1.97 MB
TENDER DOCUMENT NIT-01-2026-27 Nawada.docx
NIT • 0.97 MB
_NIT-01_2026-27_TECHNICAL SHEET Nawada.xls
NIT • 0.03 MB
BOQ_NIT-01_2026-27_Nawada.xlsx
NIT • 0.07 MB
BOQ_NIT-01_2026-27_Nawada.xlsx
NIT • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .