XEN elect Divn No II
XEN elect Division No II HPPWD Shimla-2
Providing control panel and modular panel
2022_PWD_61256_1
ED.II.GA.Tender/22-23-1347-48 dated 27.05.2022
Open Tender
Electrical Works
Item Rate
30 days
IGMC Shimla
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
EE Elect Divn No II
₹52,000
8 Jul 2022
3 Jun 2022
10 Jun 2022
3 Jun 2022
9 Jun 2022
3 Jun 2022
Amount
Nitrous control panel
Supply, Installation, Testing and Commissioning of Oxygen Digital Fully Automatic Changeover Control Panel of 2100 lpm.
Supply, Installation, Testing and Commissioning of Oxygen Digital Fully Automatic Changeover Control Panel of 2100lpm. It should fully complies and meets with the requirements of the EN7396 standards only/. It shall be duly CDSCO registered, approved . Automatic Changeover Manifolds are intended to provide a continuous supply of medical gases for respiratory, clinical and surgical use in healthcare facilities. The system shall be duplex such that the supply is maintained in single fault condition. The Automatic Changeover Manifolds shall be supplied pre-piped, pre-wired and fully tested.
It should have Digital 7 inch LCD display. Central regulators panel with cylinder headers each side. It should have headers which shall be complete with gas specific cylinder tailpipes. Pre-wired for alarm connection to BMS outputs. All components degreased for oxygen use maintenance indicator. It should have Pressure transducer both banks of cylinders. The system should have a universal input and work in a wide power range: AC 230 Volts 50/60 Hz. The manifold control system shall be powered by an extra low voltage on board supply. A separate power supply board should be foreseen.
The controller shall include alarm connections with a wire monitoring technology and sets of BMS connections for both normally open and normally closed operation. • Line pressure shall be continuously monitored by an electronic pressure sensors;. The manifold control shall be capable of being fully isolated via a full flow ball valve in order to change any regulator without interruption of supply. In the event of a low line pressure condition, both solenoid valves shall open to enable both banks to deliver gas and restore normal pipeline pressure. The system should incorporate display to indicate pressure level in each bank of cylinders and a line pressure.. • : Power On (Green), High Line Pressure (Red), Low Line Pressure (Red), Reserve Low (Amber), Left Bank Running (Green), Left Bank Low (Amber), Left Bank Empty (Amber), Right Bank Running (Green), Right Bank Low (Amber), Right Bank Empty (Amber).
The pressure regulators shall be designed and certified for use of oxygen at 230 bar and 60°C. . All components in the gas stream and contact with the oxygen pressures above 30 bar shall be made out of halogen-free materials.
Nitrous Oxide modular Manifold 4+4 header
2 cylinder module manifold header.
Each header is interconnected by extension pipe.
Configurable in multiple of two to increase capacity as and when required.
Each cylinder is connected through high pressure (HP) Non return valve to header.
Each module is supplied with one end blocker with copper washer.
Gas specific connections to manifold header.
Connection option of HP Flexible hose ( IS /ISO 21969 : 2009 ) or annealed copper tail pipe.
Suitable for all variants of medical gases.
Header mounted on AISI 304 stainless steel to avoid corrosion
HORIZONTAL/ VERTICAL BED HEAD PANEL (CE MARKED)
Per Ft Rate
Bed Head Panel should conform to NFPA99/HTM-02-01/ISO-7396-1/DIN/EN.
• Efficient, safe &. Robust design in extruded aluminum section
• Smooth curved surfaces, and choice of base colour and fascia plates.
• Unit should have integrated rail system to mount accessories.
• The headwall system should be constructed of aluminum extrusions joined together to
form a carcass to suit the particular application. Unit shall be factory assembled for
electrical and mechanical components.
• Segregation of services i.e. electrical wiring supply and Medical gases shall be maintained throughout.
• Front fascia plate should be removable individually to access for respective service.
• Bed space management system with optional equipment rail.
• With all Equipment Rail mount Accessories.
• Should have built in light feature
• Medical gas pipe line outlets should be factory fitted by & tested by the manufacturer. Outlets configuration as per hospital requirement.
• Following accessories should be provided locally with HBHP;
i) 5/15 Amp Modular Electrical Sockets with switches = 6 sets
ii) IV Pole = 2nos
iii) Vacuum slide = 1no.
iv) Sliding blocks = 2nos.
v) Nurse call system module (cut out provision only) = 1No.
vi) ) Infusion Pump Mounts = 1 No
vii) Monitor Tray with Slider = 1 No.
viii) Utility Basket = 1 No.
Bed Head Panel should CE marked.
ULTIMED SOLUTION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .