| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC ESD NO II UHL STAGE III BVPCL CHULLAH | LANGNA | MANDYA | KARNATAKA | 571401 | ₹8.2 L Quoted ₹9.0 L | L1 | Accepted-AOC The rates quoted by the contractor are lowest, hence accepted. |
| 2 | L2₹9.9 LRejected-Finance | ₹9.9 L | L2 | Rejected-Finance The rates quoted by the contractor are on higher side, hence rejected. |
| 3 | L3₹10.6 LRejected-Finance | ₹10.6 L | L3 | Rejected-Finance The rates quoted by the contractor are on higher side, hence rejected. |
| 4 | Rejected-Technical HIMACHAL PRADESH HP | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | Jai Chand L2 | ANIL KUMAR L1 | bharat singh L3 |
|---|---|---|---|---|---|---|
| 1.00 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 176 | P.sqm | 700 ₹1.2 L | 605 ₹1.1 L | 650 ₹1.1 L |
| 1.10 | Suspended floor, roofs, landings, balconies and access platform including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 70.4 | P.sqm | 600 ₹42,240 | 450 ₹31,680 | 2,000 ₹1.4 L |
| 2.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size).including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 10.56 | P.Cum | 8,100 ₹85,536 | 7,600 ₹80,256 | 8,000 ₹84,480 |
| 3.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 1,161.6 | P.Kg | 125 ₹1.5 L | 112 ₹1.3 L | 120 ₹1.4 L |
| 4.00 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 64.78 | P.Cum | 5,800 ₹3.8 L | 5,600 ₹3.6 L | 5,800 ₹3.8 L |
| 5.00 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 1,670.16 | P.Kg | 130 ₹2.2 L | 110 ₹1.8 L | 125 ₹2.1 L |
Updated dates
Tender Value
₹8.6 L
EMD Value
₹17,100
Closing Date
16 Feb 2026, 5:00 pmClosed
Executive Engineer R B MC Shimla
Executive Engineer R B MC Shimla
Pedestrian path on Nallah Sec No 3 to Sec No 4 SH CO Abutment RCC slab stairs and railing in 22 00 length Ward No 32
2026_MC_126797_5
135dated19012026
Open Tender
Civil Works
90 days
Shimla
Please refer to tender documents.
2 documents required · 2 mandatory
₹413
Executive Engineer R B MC Shimla
₹17,100
31 Mar 2026
28 Jan 2026
17 Feb 2026
28 Jan 2026
16 Feb 2026
28 Jan 2026
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Suspended floor, roofs, landings, balconies and access platform including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size).including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.14 MB
BOQ_187159.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid