Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
25 Feb 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PR & CC
UNINSTALLATION AND TRANSPORTATION OF VRU FROM VISAKH, MODIFICATION OF VRU AS
20000915-HD-10157
20000915-HD-10157
Open Tender
Two Bid
Jabalpur, Madhya Pradesh
₹0
Exempted
25 Feb 2021
3 Feb 2021
25 Feb 2021
25 Feb 2021
4 Feb 2021 - 18 Feb 2021
11 Feb 2021
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | UNINSTALL AND TRANSPT OF | UNINSTALL AND TRANSPT OF — UNINSTALL AND TRANSPORTATION OF VRU: THE SCOPE OF JOB INCLUDES DISMANTLING OF THE VRU AT VISAKH ALONG WITH THE PANEL AND SCADA SYSTEM, TRANSPORTATION AND UNLOADING TO JABALPUR DEPOT, BRIEF SCOPE OF WORK INCLUDES: 1.WATER FLUSHING AND DEGASSING OF VRU UNIT, PUMPS, PIPELINES ETC. 2. UNINSTALLING THE VRU AT VISAKH TERMINAL. 3. DISMANTLING OF THE PIPE CONNECTIONS, FOUNDATION CONNECTIONS, AND ELECTRICAL TERMINATIONS AT VRU ENDS INCLUDING THE MS PUMPS OTHER EQUIPMENT. 4.DISMANTLING OF THE MCC/PLC PANEL. 5. DISMANTLING THE COMPLETE SCADA SYSTEM ALONG INCLUDING CPU, MONITOR, ACCESSORIES ETC. 6. TRANSPORTATION OF VRU UNIT FROM VISAKH TERMINAL TO JABALPUR DEPOT. LOADING OF COMPLETE DISMANTLED VRU UNIT ALONG WITH PANEL, SCADA SYSTEM AT VISAKH AND UNLOADING OF COMPLETE VRU UNIT AT JABALPUR DEPOT IS IN THE SCOPE OF VENDOR. | - | Lump Sum |
| 2 | MODIFICATION OF EXISTING | MODIFICATION OF EXISTING — MODIFICATION OF EXISTING VRU AS PER TENDER. | - | Lump Sum |
| 3 | INSTALLATION OF VRU | INSTALLATION OF VRU — UNLOADING, STORAGE AT SITE, SITE SECURITY OF MATERIALS, SITE HANDLING, INSTALLATION/ERECTION, TESTING, PAINTING,OF MECHANICAL, ELECTRICAL AND INSTRUMENTATION EQUIPMENT OF VAPOR RECOVERY SYSTEM. CIVIL WORK IS EXCLUDED FROM THE SUPPLIER SCOPE. HOWEVER, DESIGN, PREPARATION OF CIVIL DRAWINGS AND STAGE VERIFICATION OF DIMENSIONS OF CIVIL STRUCTURES ARE INCLUDED IN THE BIDDER SCOPE. SUPPLY OF 415 VOLT ELECTRICAL POWER, INSTRUMENT AIR OF 5-6 KG/CM2G PRESSURE, HEADER PIPE FROM TLF GANTRY ARE NOT INCLUDED IN THE BIDDER SCOPE. | - | Lump Sum |
| 4 | COMMISIOINING & SAT OF | COMMISIOINING & SAT OF — PRE-COMMISSIONING, SUCCESSFUL COMMISSIONING OF VAPOR RECOVERY SYSTEM AT SITE AND SUCCESSFUL COMPLETION OF THE SITE ACCEPTANCE TEST (SAT).SUCESSFUL COMISSIOINING OR SAT IS DEFINNED AS COMPLIANCE OF ALL PUNCH POINTS BY THE VENDOR AND ACCEPTED BY HPCL EIC | - | Lump Sum |
| 5 | AMC OF VAPOR RECOVERY | AMC OF VAPOR RECOVERY — AMC 1ST YEAR VAPOR RECOVERY UNIT: (INCLUSIVE OF ALL SPARES, ETC. AS REQUIRED), QUARTERLY VISIT AND ALL BREAKDOWN VISIT RATE QUOTED SHALL BE FOR ONE YEAR. | - | Each |
| 6 | AMC 2ND YEAR VAPOR | AMC 2ND YEAR VAPOR — AMC 2ND YEAR VAPOR RECOVERY UNIT: (INCLUSIVE OF ALL SPARES, ETC. AS REQUIRED), QUARTERLY VISIT AND ALL BREAKDOWN VISIT RATE QUOTED SHALL BE FOR ONE YEAR. | - | Each |
| 7 | AMC 3RD YEAR VAPOR | AMC 3RD YEAR VAPOR — AMC 3RD YEAR VAPOR RECOVERY UNIT: (INCLUSIVE OF ALL SPARES, ETC. AS REQUIRED), QUARTERLY VISIT AND ALL BREAKDOWN VISIT RATE QUOTED SHALL BE FOR ONE YEAR. | - | Each |
| 8 | AMC 4TH YEAR VAPOR | AMC 4TH YEAR VAPOR — AMC 4TH YEAR VAPOR RECOVERY UNIT: (INCLUSIVE OF ALL SPARES, ETC. AS REQUIRED), QUARTERLY VISIT AND ALL BREAKDOWN VISIT RATE QUOTED SHALL BE FOR ONE YEAR. | - | Each |
| 9 | AMC 5TH YEAR VAPOR | AMC 5TH YEAR VAPOR — AMC 5TH YEAR VAPOR RECOVERY UNIT: (INCLUSIVE OF ALL SPARES, ETC. AS REQUIRED), QUARTERLY VISIT AND ALL BREAKDOWN VISIT RATE QUOTED SHALL BE FOR ONE YEAR. | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20000915-HD-10157.pdf
TENDER_DOCUMENT • 23.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .