Loading…
Loading…
Tender Value
₹4.8 Cr
EMD Value
₹9.7 L
Closing Date
12 Aug 2026, 4:00 pm
Executive Engineer RnB Division Kulgam
Executive Engineer RnB Division Kulgam
Construction of Examination Cum Administrative Block at GDC College (Phase -1)
2026_PWDJK_317582_1
47/2026-27/RnB/Kul/4396-4406 Dtd 23-07-2026
Open Tender
Civil Works
Percentage
720 days
Kulgam
Please refer Tender documents.
10 documents required · 10 mandatory
₹5,500
Account No. 0470010200000099
₹9.7 L
Superintending Engineer RnB Circle Kulgam
24 Jul 2026
24 Jul 2026
13 Aug 2026
24 Jul 2026
12 Aug 2026
24 Jul 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Main Building | |||||
| 1.01 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth. | 150 | no. | 332.31 | ₹49,846.5 |
| 1.02 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 977.67 | CUM | 164.13 | ₹1,60,464.98 |
| 1.03 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 30.51 | CUM | 5,778.51 | ₹1,76,302.34 |
| 1.04 | Supply and filling GSB under floor including watering , ramming and consolidating with hand rammer with aggregates size not exceeding 90mm including cost and carriage of all materials involved upto site of work all complete | 93.22 | CUM | 762.71 | ₹71,099.83 |
| 1.05 | Providing and laying of stone soling laid dry hard packed tightly including all carriages complete | 77.19 | CUM | 762.71 | ₹58,873.58 |
| 1.06 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone NALLAH incld: all carriage | 11.26 | CUM | 2,448.13 | ₹27,565.94 |
| 1.07 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 50.65 | CUM | 4,561.36 | ₹2,31,032.88 |
| 1.08 | Providing and laying in position Reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement :2 coarse sand: 4 graded stone aggregate 20 mm nominal size) | 23.09 | CUM | 6,228.35 | ₹1,43,812.6 |
| 1.09 | Providing and laying in position Reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1.5:3 (1 cement :1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) | 11.84 | CUM | 6,827.97 | ₹80,843.16 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
Tendernotice_2.pdf
PDF • 1.12 MB
BOQ_1041370.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].