| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹31.4 LAccepted-AOC PLAT NO 943 54TH STREET T V S COLONY ANNANAGAR WEST EXTENSION CHENNAI PIN 600 101 | CHENNAI | CHENNAI | TAMIL NADU | 600101 | ₹31.4 L Quoted ₹32.0 L | 1 | Accepted-AOC Bidder 1 has quoted less than Estimate Value |
| 2 | 2₹33.3 L+₹1.3 L (3.94%)Rejected-Finance | ₹33.3 L+₹1.3 L (3.94%) | 2 | Rejected-Finance Bidder L2 Quoted more than Bidder L1 value |
| Sl No | Description | Qty | Unit | ECO PROTECTION ENGINEERS PVT LTD L1 | EVERLASTING CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with initial |lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers - Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil. | 66 | M3 | 300 ₹19,800 Lowest | 330 ₹21,780 |
| 2.00 | Earth work excavation and depositing on bank with initial |lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers - In Soft Disintegrated Rock, Laterite, soft rock or kankar, not requiring blasting. | 94 | M3 | 350 ₹32,900 Lowest | 400 ₹37,600 |
| 3.00 | Earth work excavation and depositing on bank with initial |lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers - In Soft Disintegrated Rock, Laterite, soft rock or kankar, not requiring blasting. | 100 | M3 | 660 ₹66,000 Lowest | 690 ₹69,000 |
| 4.00Earth work excavation for Pipe Laying work by removing hard rock using controlled blasting method by drilling blast holes using compressor and jack hammer including stacking, dewatering wherever necessary, cost of gelatin, electric detonator, 1licensed shot fireman, labour for filling earth in gunny bags, labour for excavation of earth, conveyance of earth including cost of gunny bags, M.S Plates, barricading, putting up road diversion boards and providing red light signal during night, removal of debris etc., where open blasting is prohibited and as directed by Departmental Officers. | |||||
| 4.10 | 0m - 2m Depth | 100 | M3 | 1,700 ₹1,70,000 Lowest | 1,900 ₹1,90,000 |
| 4.20 | 2m - 3m Depth | 30 | M3 | 1,700 ₹51,000 Lowest | 2,000 ₹60,000 |
| 5.00 | Supply and delivery of HDPE pipes for sewerage PE 100
PN 6 conforming to IS 14333/1996 (amended in 2009) | 200 | Rm | 7,900 ₹15,80,000 Lowest | 8,000 ₹16,00,000 |
| 6.00 | Unloading, stacking at stock yard, loading and Conveyance fron stock yard to site (maximum of 8Km radius) of HDPE pipes (450 mm/ PN.6/HDPE Pipe 'ISI' (PE 100 Grade) | 5.92 | Ton | 1,200 ₹7,104 Lowest | 1,250 ₹7,400 |
| 7.00Lowering of HDPE Pipes and specials in the trenches and laying to proper grade and alignment and as directed by the Departmental Officers. | |||||
| 7.10 | 0m - 2m Depth | 80 | Rm | 90 ₹7,200 Lowest | 100 ₹8,000 |
Tender Value
₹32.5 L
EMD Value
₹65,000
Closing Date
17 Jun 2025, 3:00 pmClosed
Commissioner
Commissioner Tiruppur City Municipal Corporation
Relaying the Existing Sewerage Collection Network across Nallaru River at Pitchampalayam in ward No. 16 and 8.
2025_MAWS_568782_6
6 / 25-26 / N / Z2 / EE, TCMC
Open Tender
Civil Works - Others
Works
90 days
Tiruppur City Municipal Corporation
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹65,000
28 Aug 2026
14 Jun 2025
17 Jun 2025
14 Jun 2025
17 Jun 2025
14 Jun 2025
Amount
Earth work excavation and depositing on bank with initial |lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers - Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil.
Earth work excavation and depositing on bank with initial |lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers - In Soft Disintegrated Rock, Laterite, soft rock or kankar, not requiring blasting.
Earth work excavation and depositing on bank with initial |lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers - In Soft Disintegrated Rock, Laterite, soft rock or kankar, not requiring blasting.
Earth work excavation for Pipe Laying work by removing hard rock using controlled blasting method by drilling blast holes using compressor and jack hammer including stacking, dewatering wherever necessary, cost of gelatin, electric detonator, 1licensed shot fireman, labour for filling earth in gunny bags, labour for excavation of earth, conveyance of earth including cost of gunny bags, M.S Plates, barricading, putting up road diversion boards and providing red light signal during night, removal of debris etc., where open blasting is prohibited and as directed by Departmental Officers.
0m - 2m Depth
2m - 3m Depth
Supply and delivery of HDPE pipes for sewerage PE 100 PN 6 conforming to IS 14333/1996 (amended in 2009)
Unloading, stacking at stock yard, loading and Conveyance fron stock yard to site (maximum of 8Km radius) of HDPE pipes (450 mm/ PN.6/HDPE Pipe 'ISI' (PE 100 Grade)
Lowering of HDPE Pipes and specials in the trenches and laying to proper grade and alignment and as directed by the Departmental Officers.
0m - 2m Depth
2m - 4m Depth
Jointing 450mm Dia HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by Departmental Officers
0m - 2m Depth
2m - 4m Depth
Cutting HDPE Pipes true to axis and filing smoothly and finishing the ends complete
Refilling with excavated soil (other than sand) complying with the standard specification for filling in foundation and basement
Disposal of surplus earth inchuding loading and conveyance within a distance of 5 km (basic cost of earth is zero) including loading charges and Conveyance Charges of 5 kms distance.deduting 20% voids in surplus earth.
Construction of RC.C. Machine hole for various diameter & depths as per the design and drawings and directed by the department officers Earthwork excavation in all classification of soils to the required depth as per the site requirement to facilitate construction of circular RCC Machinehole of suitable dia and depth as per design requirement. The foundation shall be filled with levelling course using PCC 1:4;8 concrete for a depth of 0.15 m using sulphate resistant cement. The base slab, sidewall Jand roof slab shall be constructed using M-30 RCC mix with 20 mm HBS and RTS reinforcement. Necessary centering using steel sheets be deployed and wherever necessary shoring and strutting to be done when the depth of excavation exceeds 2.0m with silver Oak planks and country wood scantlings. The external gap around the manhole be filled with excavated earth and consolidated with water and ramming with wooden bars. Benching at the bottom be provided with PCC 1:2;4 using 20mm HBS and sulphate resistant cement, PVC encapsulated CI steps be provided at a spacing of 30 cm for access to the bottom of the Machinehole. The top of the Machinehole be covered with removable FRC heavy duty cover of 60 cm dia. Proper curing to be followed so as to attain the full strength of concrete. The excess materials and all centering materials at site to be removed after the lconstruction and the inside of the Machinehole be free from any debris and kept neat.
1.5m - 2.5m height
2.5m - 3.5m height
P.C.C 1:4:8 one cement, four sand and eight coarse aggregate) using S.R. cement and 40 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the Departmental Offices
Reinforced cement concrete M30 using S.R. cement and 20mm size hard blue granite stone (machine crushed)excluding cost of reinforcement, fabrication and placing the grills in position and excluding cost of shoring and strutting but including curing, finishing and mixing concrete using mechanical mixer machine and compaction by machanical vibrator etc., complete and as directed by Departmental Offices
Supply and erection of steel Centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25 X 25 X 3mm for boarding laid over Silver Oak joists of size 10cm X 6.5cm spaced at 90cm c/c and supported by Casuarina Props 10cm - 13cm spaced at 75cm clc etc., complete and as directed by Departmental Offices.Retrieved Materials should be taken back by the contractor.)
Dewatering using 5HP Diesel Engine Pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete.
EVERLASTING CONSTRUCTIONS (BID ID -1369846)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .