| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1 Rank₹1.5 LAccepted-AOC | 1 Rank | Accepted-AOC First Lowest | |
| 2 | 2 Rank₹1.5 L+₹1,080 (0.74%)Rejected-AOC | 2 Rank | Rejected-AOC S | |
| 3 | 3 Rank₹1.5 L+₹4,360 (2.97%)Rejected-AOC | 3 Rank | Rejected-AOC T |
Tender Value
₹1.5 L
EMD Value
₹1,500
Closing Date
13 May 2020, 5:00 pmClosed
Superintending Engineer,
Electricity Transmission Circle-I, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj
Replacement of old control panels and CT s at 220 KV Substation Phulpur under Electy. Trans. Division - I, Prayagraj
2020_UPTCL_457028_2
222-ETC-I(A)/ 2019-20
Open Tender
Electrical Works
Item Rate
60 days
Phulpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹236
S. E. E.T.C. PRAYAGRAJ
₹1,500
13 Nov 2020
25 Apr 2020
14 May 2020
25 Apr 2020
13 May 2020
25 Apr 2020
Amount
The following work is to be carred out for replacement of old control panes and CT's at 220 KV Substation, Phulpur under Electy. Trans. Division-I, Prayagraj.
Proper and safe dismantling of following old control panels at 220 KV Substation Phulpur Prayagraj. Job includes checking of cable, disconnection of cable, removing of earthing strips, opening of bolt and safe shifting of panels from site to store of substation.
Transformer control panel of 160 MVA T/F-I (EE make).
Transformer control panel of 160 MVA T/F-II (EE make).
132 KV Transformer Bus coupler (EE make).
220 KV Transformer Bus coupler (EE make).
Erection and commissioning of following new control panels at 220 KV Substation Phulpur, Prayagraj. Job includes shifting of panels from store to control room of sub station, its proper fixing on plinths, proper tightening of bolts, checking. Identifying and termination of control cable on panel as per schedule and proper eathing using proper size of MS strip.
Transformer control panel of 160 MVA T/F-I (Siemens make).
Transformer control panel of 160 MVA T/F-II (ABB make).
132 KV Transformer Bus coupler (Power Tech Carbon make).
220 KV Transformer Bus coupler (Power Tech Carbon make).
Replacement of 0.5 and 1.0 acc cls CTs of following 132 KV feeders at 220 KV Substation Phulpur. Job inculdes dismantling of old CT by opening of its all clamps/connectors, safely unloading of these and safely transportation from work place to store. Shifting of new CTs having 0.2 Acc from store to working place. erection and proper connection.
132 KV IFFCO-I Feeder.
132 KV IFFCO-II Feeder.
HARE KRISHNA ENERGY PROJECTS
DEEPAK ENGINEERING
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .