Tender Value
₹22.1 L
EMD Value
₹43,000
Closing Date
15 Oct 2026, 4:00 pm
Executive Eng. II
Construction office,P.U. Campus
Urgent Repair and Waterproofing of Roof of Center for Police Administration(UIEASS), P.U. Campus Sector-14 Chandigarh.
2026_PU_95712_1
6910/EE/Mtc.
Open Tender
Civil Works
Percentage
150 days
P.U. Campus Sector-14 Chandigarh.
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹43,000
24 Sept 2026
24 Sept 2026
16 Oct 2026
24 Sept 2026
15 Oct 2026
24 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Work | |||||
| 1.01 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 5 km for all lifts, complete as per directions of Engineer-in-charge. (Ref:- 1.1.18) | 101.43 | Cum | 178 | ₹18,054.54 |
| 2Providing and fixing of expansion joint system of approved make and manufactures for various roof locations as per approved drawings and direction of Engineer-In Charge. The joints shall be of extruded aluminum base members with, self aligning and self centering arragement support plates asper ASTM B221-02. The system shall be such that it provides watertight roof to roof/roof to corner joint cover expansion control system that is capable of accommodating multidirectional seismic movement without stress to its components. System shall consist of metal profile that incorporates a universal aluminum base member designed to accommodate various project conditions and roof treatments. The cover plate shall be designed of width and thickness required to satisfy movement and loading requirements and secured to base members by utilizing manufacturer’s pre engineered self-centering arrangement that freely rotates / moves in all directions. The Self centering arrangement shall exhibit circular sphere ends that lock and slide inside the corresponding aluminum extrusion cavity to allow freedom of movement and flexure in all directions including vertical displacement. The Joint System shall resists damage or deterioration from the impact of falling ice, exposure to UV, airborne contaminants and occasional foot traffic from maintenance personnel. Provision of Moisture Barrier Membrane in the Joint to ASTM 6063). | |||||
| 2.01 | Roof Joint of 100 mm gap (Ref:- 5.46.1) | 18 | Mtr | 5,489 | ₹98,774.56 |
| 3Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10mm and down gauge) including finishing with cement mortar 1:3 (1 cement : 3 fine sand) and mixing of integral water proofing compund as per standard design. | |||||
| 3.01 | In 75x75mm deep chase (Ref:- 12.21.1) | 184.22 | Rmt | 246 | ₹45,318.12 |
| 4 | Making khurras 45x45 cm with average minimum thickness of 5cm cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate of 20 mm nominal size) over P.V.C. sheet 1mx1mx400micron, finished with 12mm cement plaster 1:3 (1 cement : 3 coarse sand) and a coat of neat cement rounding the edge sand making and finishing the outlet complete. (Ref:- 12.22) | 15 | Nos | 278 | ₹4,170 |
| 5 | Regrading terracing of mud phuska covered with tiles or brick, in cement by dismantling tiles or bricks, removing mud plaster preparing the surface of mud phaska to proper slope relaying mud plaster gobri leaping and tiles or bricks, grouted in cement mortar 1:3 (1 cement : 3 fine sand ) including replacing unserviceable tiles or bricks with new ones and disposal of unserviceable material to the dumping ground (the cost of the new tiles or brick excluded) within 50 metres lead. (Ref:- 14.13) | 1,331.91 | Sqm | 504 | ₹6,71,282.64 |
| 6 | Flush pointing with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 2% of integral water proofing compound by weight of cement for flat tile bricks on top of mud phaska : (Ref:- 14.81.1) | 1,331.91 | Sqm | 105 | ₹1,39,850.55 |
| 7 | Removing mortar/Mud from bricks/tiles and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured) (Ref:- 15.8.3) | 22,939 | Nos | 5 | ₹1,14,695 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.99 MB
BOQ_117586.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .