Loading…
Loading…
Tender Value
₹1.4 L
EMD Value
₹2,900
Closing Date
8 Aug 2026, 6:00 pm
FAYAZ AHMED SHEIKH
EXECUTIVE ENGINEER OFFICE REW RAMBAN
as per nit
2026_RDPR_317760_14
NIT NO 18 OF REW RAMBAN 2026 27 BLOCK BATOTE UNDER HEAD PRI
Open Tender
Civil Works
Percentage
30 days
RAMBAN
as per nit
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹2,900
25 Jul 2026
25 Jul 2026
10 Aug 2026
25 Jul 2026
8 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kind of soil, Disposal of 1 mtr from cutting edge. | 28.13 | CUM | 592.9 | ₹16,678.28 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size | 7.7 | CUM | 5,733.6 | ₹44,148.72 |
| 3 | Dry boulder stone pitching on horizontal surface | 11.25 | CUM | 751 | ₹8,448.75 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) | 5.63 | CUM | 7,340.8 | ₹41,328.7 |
| 5 | Centring and shuttering including struting nd proping etc. | 27.5 | sqm | 286.1 | ₹7,867.75 |
| 6 | Carriage of cement from source to site by mechanical transport and by head load | 3.62 | MT | 230.8 | ₹835.5 |
| 7 | Carriage of sand from source to site by mechanical transport and by head load | 6.52 | CUM | 1,655.7 | ₹10,795.16 |
| 8 | Carriage of stone aggregate from source to site by mechanical transport and by head load | 12.35 | CUM | 432.9 | ₹5,346.32 |
| 9 | Carriage of stone | 11.55 | CUM | 635.7 | ₹7,342.34 |
| 10 | Add cost of CIB | 1 | no | 3,500 | ₹3,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.10 MB
BOQ_1043105.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].