Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-AOC | L1 | Accepted-AOC Thiru. T. Sivaji has been quoted lowest rate of 0.23 percentage below from the estimate rate and his rate has been approved. | |
| 2 | L2₹14.3 L+₹51,000 (3.70%)Rejected-Finance | L2 | Rejected-Finance M/s. Neom Builders has been quoted lowest rate of 3.46 percentage above from the estimate rate. |
| Sl No | Description | Qty | Unit | NEOM BUILDERS | T SIVAJI |
|---|---|---|---|---|---|
| 1.00 | Supplying and delivery of 110mm dia HDPE Pipe ( PN 6) and the rate including all cost and conveyance of all materials to site and Labour charges etc complete complying with standard specification.(WD-M0266 of TWAD SOR) | 3,400 | rm | 13,26,000 ₹15,64,680 | 12,88,600 ₹15,20,548 Lowest |
| 2.00 | Laying of 110mm dia HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the Departmental Officers and the rate including cost of all labour charges etc complete complying with standard specification. | 3,400 | rm | 1,02,000 ₹1,20,360 | 88,400 ₹1,04,312 Lowest |
Tender Value
Refer Docs
EMD Value
₹17,150
Closing Date
10 Sept 2025, 3:00 pmClosed
Executive Officer
Sholur Town Panchayat Office, The Nilgiris - 643005.
15th Finance -Tied Grant - 2nd Installment - 2025-2026 - Providing HDPE Pipeline from Padhankodumandu to Nagarthanai, Nagarthanai to Thattaneri and Dhoobakandi Pipeline.
2025_DTP_601443_1
33/2025-4
Open Tender
Civil Works
Works
180 days
Sholur Town Panchayat
15th Finance -Tied Grant - 2nd Installment - 2025-2026 - Providing HDPE Pipeline from Padhankodumandu to Nagarthanai, Nagarthanai to Thattaneri and Dhoobakandi Pipeline.
2 documents required · 2 mandatory
₹0
₹17,150
Yes
12 Sept 2025
8 Sept 2025
10 Sept 2025
8 Sept 2025
10 Sept 2025
8 Sept 2025
8 Sept 2025 - 10 Sept 2025
Supplying and delivery of 110mm dia HDPE Pipe ( PN 6) and the rate including all cost and conveyance of all materials to site and Labour charges etc complete complying with standard specification.(WD-M0266 of TWAD SOR)
Laying of 110mm dia HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the Departmental Officers and the rate including cost of all labour charges etc complete complying with standard specification.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .