Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.1 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹16.4 L+₹35,189 (2.19%)Rejected-AOC | L2 | Rejected-AOC Reject | |
| 3 | L3₹17.2 L+₹1.1 L (6.86%)Rejected-Finance | L3 | Rejected-Finance Reject | |
| 4 | Rejected-Technical | - | Rejected-Technical As per evaluation Sheet attached | |
| 5 | Rejected-Technical | - | Rejected-Technical As per evaluation Sheet attached |
Tender Value
Refer Docs
EMD Value
₹30,500
Closing Date
5 Dec 2020, 5:00 pmClosed
EE BBNDA BADDI
BBNDA BADDI
C/o Retaining wall on Damaged path leading to village Bated from Baddi Barotiwala road and Drainage of water from the land of Pardeep Sharma, village Bated, G.P. Barotiwala C/o Damaged B/wall of Truck Parking-II on Suncity road.
2020_BBNDA_42786_1
BBNDA-06(PROJECT)NIT/6920-30 DATED 24.11.2020
Open Tender
Civil Works
Item Rate
90 days
BADDI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EE BBNDA BADDI
₹30,500
23 Dec 2020
28 Nov 2020
8 Dec 2020
28 Nov 2020
5 Dec 2020
28 Nov 2020
28 Nov 2020 - 4 Dec 2020
Amount
Excavation in drains and channels etc., in earth work including dressing of side and bed and disposing of excavated earth upto a lead of 20 metres and lift upto 1.50 metres disposed earth to be levelled and neatly dressed: (Pick Jumper work)
Cutting in earth work and disposal of excavated earth upto a lead of 20 meters
Providing and laying cement concrete 1:4:8 (1 cement :4sand :8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centering and shuttering in foundation and plinth
Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1108. 300mm dia
Providing and laying plain / reinforced concrete in open foundations complete as per drawing and technical specification clause 802 ;803; 1202 and 1203 P.C.C. grade-M-10 (i) Nominal mix 1:3:6 including the cost of centering and shuttering in open foundation.
Back filling behind abutment , wing wall and return wall complete as per drawings and Technical specification Clause 1204.3 .8
Providing weep holes in brick masonary/stone masonary, plain/ reinforced concrete abutment , wing wall, return wall, with 100mm dia PVC pipe extending through the full width of the structures with slope of 1(V) 20 (H) towards drawings face complete as per drawing and technical specifications clauses 614,709,1204.3.7
Brick work using 2 nd class common burnt clay building bricks in superstructure in cement mortor 1:5 (1 cement : 5 sand) complete in all respect and as per the direction of Engineer-in-Charge.
15mm. Cement plaster in single on fair side of brick / concrete / stone walls for interior plastering up to all heights including arises internal rounded angles chamfers and / or rounded angles not exceeding 80mm, in girth and finished even and smooth in cement morter 1:4 ( 1 cement 4 sand )
Applying Birla JK white wall care putty over plaster surface after thoroughly brushing the surface free from mortar drops, dust, loose materials and other foreign matters sand papered smooth to give final matter finish to the surface complete including carriage of material in all leads & lifts. (i) In Wall /ceiling surface.
SATNAM CONSTRUCTION AND FABRICATION
Amardeep Singh
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .