Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5.9 L
EMD Value
₹5,860
Closing Date
18 May 2023, 3:00 pmClosed
BDO,Aranthangi
Pt.Union Office,Aranthangi
Construction of Cremation Shed at Kovilpatti Melakadu in Kurumbur Panchayat
2023_RDTN_314147_1
Arg/MLACDS/Kurumbur Cremation shed
Open Tender
Civil Works
Item Rate
180 days
Aranthangi
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,860
19 May 2023
12 May 2023
18 May 2023
12 May 2023
18 May 2023
12 May 2023
Amount
Construction of Cremation Shed at Kovilpatti Melakadu in Kurumbur Panchayat
Earth work excavation in all classes of soil such as hard stiff clay hard red earth, earth murrams gravel stoney erath, earth mixed with fair size boulders as per SS 20B for foundation.etc., complete
Filling with good river sand including cost and conveyance of all materials to work side and all labour charges etc complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work side and all labour charges etc complete
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance to work site including all labour charges etc complete
R.C.C. 1:11/2:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work side and all labour charges etc complete
Brick work in cm1:5 mix using country bricks of size 8 3/4" x 4 1/4" x 2 3/4" including cost and conveyance of all materials to site and all labour charges etc. complete
Cost and supply of steel with fabrication including cost of steel and binding wire complete with standard specification etc.,complete
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
Shed and Compound wall
Cement road
Special ceiling plastering with cement mortor 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with cement mortor 1:5 mix to 12mm thick including cost and conveyance of all materials to work side and all labour charges etc complete
White washing two coats using shell lime including cost and conveyance of all materials to work side and all labour charges etc complete
Emulsion painting two coats over priming coat including cost and conveyance of all materials to work side and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M. MOORTHY
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .