Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.1 LAdmitted-Finance NO 2 16 KANGAYAMPALAYAM SULFUR PO COIMBATORE 641 401 | COIMBATORE | COIMBATORE | TAMIL NADU | 641401 | L1 | Admitted-Finance | |
| 2 | L2₹1.5 Cr+₹1.1 Cr (322.2%)Admitted-Finance THE JEHOVAH SHALOM 21 THIRUMALAISAMY STREET LAKSHMI NAGAR EXTN KAVUNDAMPALAYAM COIMBATORE 641030 | COIMBATORE | COIMBATORE | TAMIL NADU | 641030 | L2 | Admitted-Finance | |
| 3 | L3₹1.5 Cr+₹1.2 Cr (328.1%)Admitted-Finance 184 C 13 THURAIYUR SAMINATHAN NAGAR PERAMBALUR SALAI TIRUCHIRAPPALLI TAMIL NADU 621010 UDYAM TN 27 0052941 | TIRUCHIRAPPALLI | TAMIL NADU | 621010 | L3 | Admitted-Finance | |
| 4 | L4₹1.6 Cr+₹1.2 Cr (347.3%)Admitted-Finance 31 CHAIRMAN KARUPPANA THEVAR STEET SULUR COIMBATORE 641 402 | COIMBATORE | TAMIL NADU | 641402 | L4 | Admitted-Finance | |
| 5 | L5₹1.6 Cr+₹1.2 Cr (347.4%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KUMAR AGENCIES L2 | Neptune Engineers and Builders L7 | D.R ASSOCIATES L5 | A.GOVINDARAJ L6 | KSR AND COMPANY L1 | NLK Construction L3 | K S MUTHU CONSTRUCTTIONS L8 | KAARTHIC BUILDERS L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Lumpsum price worked out by the tenderer for BUILDINGS / STURCTURES as listed in Schedule 'A' Part-I | 1 | EACH | 1,14,50,000 ₹1,14,50,000 | 1,35,00,000 ₹1,35,00,000 | 1,24,65,000 ₹1,24,65,000 | 1,23,45,000 ₹1,23,45,000 | 11,498 ₹11,498 Lowest | 1,18,00,000 ₹1,18,00,000 | 1,38,76,800 ₹1,38,76,800 | 1,19,88,900 ₹1,19,88,900 |
| 2.00 | Lumpsum price worked out by the tenderer for SITE CLEARANCE, DEVELOPMENT AND EXCAVATION AND EARTH WORK as listed in Schedule 'A' Part-II | 1 | Lumpsum | 3,63,600 ₹3,63,600 Lowest | 3,75,000 ₹3,75,000 | 3,67,450 ₹3,67,450 | 3,69,000 ₹3,69,000 | 4,11,500 ₹4,11,500 | 4,25,000 ₹4,25,000 | 3,98,600 ₹3,98,600 | 3,98,900 ₹3,98,900 |
| 3.00 | Lumpsum price worked out by the tenderer for ROAD, PATH AND CULVERT as listed in Schedule 'A' Part-III | 1 | Lumpsum | 11,75,000 ₹11,75,000 | 12,10,000 ₹12,10,000 | 9,98,600 ₹9,98,600 Lowest | 12,14,500 ₹12,14,500 | 11,65,010 ₹11,65,010 | 10,00,000 ₹10,00,000 | 10,98,540 ₹10,98,540 | 12,99,000 ₹12,99,000 |
| 4.00 | Lumpsum price worked out by the tenderer for AREA DRAINAGE as listed in Schedule 'A' Part-IV | 1 | Lumpsum | 7,25,500 ₹7,25,500 | 6,75,000 ₹6,75,000 Lowest | 8,65,700 ₹8,65,700 | 7,89,000 ₹7,89,000 | 7,86,540 ₹7,86,540 | 6,90,500 ₹6,90,500 | 7,35,600 ₹7,35,600 | 8,19,000 ₹8,19,000 |
| 5.00 | Lumpsum price worked out by the tenderer for SEWAGE DISPOSAL as listed in Schedule 'A' Part-V | 1 | Lumpsum | 1,10,000 ₹1,10,000 | 1,15,000 ₹1,15,000 | 1,05,600 ₹1,05,600 | 1,25,980 ₹1,25,980 | 1,24,060 ₹1,24,060 | 1,05,000 ₹1,05,000 Lowest | 1,09,850 ₹1,09,850 | 1,09,000 ₹1,09,000 |
| 6.00 | Lumpsum price worked out by the tenderer for EXTERNAL ELECTRFIFICATIONS as listed in Schedule 'A' Part-VI | 1 | Lumpsum | 70,800 ₹70,800 | 71,000 ₹71,000 | 69,000 ₹69,000 Lowest | 71,500 ₹71,500 | 69,800 ₹69,800 | 69,000 ₹69,000 Lowest | 76,540 ₹76,540 | 71,000 ₹71,000 |
| 7.00 | Lumpsum price worked out by the tenderer for EXTERNAL WATER SUPPLY as listed in Schedule 'A' Part-VII | 1 | Lumpsum | 2,25,000 ₹2,25,000 | 2,80,000 ₹2,80,000 | 1,76,900 ₹1,76,900 Lowest | 3,40,000 ₹3,40,000 | 2,10,750 ₹2,10,750 | 1,90,850 ₹1,90,850 | 3,15,000 ₹3,15,000 | 2,39,900 ₹2,39,900 |
| 8.00 | Lumpsum price worked out by the tenderer for INTERNAL ELECTRIC SUPPLY as listed in Schedule 'A' Part-VIII | 1 | Lumpsum | 5,44,780 ₹5,44,780 | 5,50,000 ₹5,50,000 | 5,15,460 ₹5,15,460 Lowest | 7,00,000 ₹7,00,000 | 5,67,490 ₹5,67,490 | 5,95,600 ₹5,95,600 | 6,15,490 ₹6,15,490 | 6,19,990 ₹6,19,990 |
| 9.00 | Lumpsum price worked out by the tenderer for INTERNAL WATER SUPPLY as listed in Schedule 'A' Part-IX | 1 | Lumpsum | 77,900 ₹77,900 | 75,000 ₹75,000 Lowest | 76,525 ₹76,525 | 83,500 ₹83,500 | 81,347 ₹81,347 | 76,000 ₹76,000 | 89,000 ₹89,000 | 82,000 ₹82,000 |
| 10.00NOTE: 1. Schedule ‘A’ Part - I here-in-before is not prepriced by MES and left blank under Col.5 signifies this fact only. Bidder shall insert their rates in Green colour filled under Col-6. 2. Schedule ‘A’ Part - II to IX here-in-before are prepriced by MES under Ser No.1.00 to 7.00 Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only. 3. Schedule ‘A’ Part - X (MISCELLANEOUS ITEMS) hereinafter is not prepriced by MES and prepriced by MES and rate left blank under Col.5 signifies this fact only. Bidder shall insert their rates in Green colour filled under Col-6. | |||||||||||
Tender Value
₹1.1 Cr
EMD Value
₹1.8 L
Closing Date
6 Aug 2026, 6:00 pmClosed
CWE WELLINGTON
Headquarters Commander Works Engineers Wellington Barracks Post The Nilgiris PIN 643 231
CONSTRUCTION OF 04 X OR MD ACCN AT REDFIELDS COIMBATORE AS EQUIVALENT VALUE INFRASTRUCTURE THROUGH DEPOSIT WORK BY MES AGAINST TRANSFER OF DEFENCE LAND MEASURING 3.558 ACRES TO INDIAN OIL CORPORATION LTD IOCL IRUGUR, COIMBATORE, TAMIL NADU FOR DEVELO
2026_MES_775909_1
83087/E8
Open Tender
Civil Works
Lump-sum
360 days
coimbatore
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
GE WELLINGTON
₹1.8 L
Yes
20 Aug 2026
2 Jul 2026
8 Aug 2026
2 Jul 2026
6 Aug 2026
30 Jul 2026
3 Jul 2026 - 8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Lumpsum price worked out by the tenderer for BUILDINGS / STURCTURES as listed in Schedule 'A' Part-I | 1 | EACH | - | - |
| - | Lumpsum price worked out by the tenderer for SITE CLEARANCE, DEVELOPMENT AND EXCAVATION AND EARTH WORK as listed in Schedule 'A' Part-II | 1 | Lumpsum | 3,36,521.26 | ₹3,36,521.26 |
| 3 | Lumpsum price worked out by the tenderer for ROAD, PATH AND CULVERT as listed in Schedule 'A' Part-III | 1 | Lumpsum | 7,97,844.83 | ₹7,97,844.83 |
| 4 | Lumpsum price worked out by the tenderer for AREA DRAINAGE as listed in Schedule 'A' Part-IV | 1 | Lumpsum | 6,81,911.55 | ₹6,81,911.55 |
| 5 | Lumpsum price worked out by the tenderer for SEWAGE DISPOSAL as listed in Schedule 'A' Part-V | 1 | Lumpsum | 1,02,985.81 | ₹1,02,985.81 |
| 6 | Lumpsum price worked out by the tenderer for EXTERNAL ELECTRFIFICATIONS as listed in Schedule 'A' Part-VI | 1 | Lumpsum | 48,582.32 | ₹48,582.32 |
| 7 | Lumpsum price worked out by the tenderer for EXTERNAL WATER SUPPLY as listed in Schedule 'A' Part-VII | 1 | Lumpsum | 1,20,432.08 | ₹1,20,432.08 |
| 9 | SCHEDULE ‘A’ PART - VIII (MISCELLANEOUS ITEMS) | - | - | - | - |
| 10 | SEWAGE DISPOSAL
S & F 160 mm bore, PVC (SWR), Soil, waste and rainwater drainange pipes in any length with or without ears, with cement joints, laid in trenches or in floors, etc complete all as specified and directed. | - | RUNNING METRE | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.34 MB
dwg.pdf
Tender Documents • 0.55 MB
BOQ_868858.xls
BOQ • 0.33 MB
sch.pdf
Tender Documents • 0.24 MB
tmrgd_83087.pdf
Tender Documents • 2.37 MB
corr_m83087.pdf
PDF • 0.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .