Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical RAILWAY ROAD 9 10 KC MARKET 132001 2021R66 | KARNAL | HARYANA | 132001 | - | Rejected-Technical Not Eligible |
Tender Value
₹15.6 L
EMD Value
₹31,180
Closing Date
19 Aug 2024, 5:00 pmClosed
PRAMESH Kumar
ED - Hisar
Installation of 20 KW on grid/Hybrid Solar power plant with Battery bank in Govt. Industrial Training Institute Barwala, Distt. Hisar (RECALL)
2024_HRY_399668_1
202479458373 488B 4B48 AA81 B12D4CC9EA69666BAR
Open Tender
Electrical Works
Works
150 days
Barwala
2 documents required · 2 mandatory
₹1,000
₹31,180
Yes
9 Dec 2024
13 Aug 2024
20 Aug 2024
13 Aug 2024
19 Aug 2024
13 Aug 2024
Amount
Design, Supply, Errection, Testing, Installation and Commissioning of Rooftop Grid connected SPV Hybrid solar Power Plants (With Net Metering) including Comperhensive Maintenance for a period of 5 Years from date of Commissioning of the system including supply of Bi-Directional Meter including battery (240 V Nominal/ 150 AH (equivalent to 3000 AH) (Hybrid Inverter with Dry cell Battery) bank 20 KWP Solar Panels/Pv Modules:-Poly Crystalline PV solar Make:-Rhine Solar/Contendre Greenergy/BHEL (Make should be as per MNRE and IEC approved guidelines) PV Module/ Solar Panels used in SolarPower Plant/system must be warranted for 25 years. The output peak watt capacity which should not be less then 90% at the end of 10 year and 80% at the end of 25 years. Solar Panel/PV Module must conform to the following standard:- 1. Solar Panel Mounting structure - Solar Panels shall be installed on a structure which will also serve as afree space as per site requirement. 2. Connectors and Dis-connectors -equivalent nos. of IP 65 MC 4 connectors as per site requirement 3. Hybrid Solar inverter of suitable capacity Make Livguard/Enertech/Statcan/UTL/Consul Neowatt/Luminous/Microtek (with battery bank). The hybrid inverter should have all the technical requirements for connecting to the grid and provision of international islanding with facility for connecting to a battery bank. The hybrid inverter shall include appropriate self-protective and self-diagnostic feature to protect itself and the PV array from damage in the event of inverter component failure or from parameters beyond the inverters safe operating range due to internal or external causes. The technical specification of hybrid inverters are summarized below:- Nominal voltage 415 V AC L-L(240 V AC L-N)/Pure Sign Wave Voltage Regulation/Out Put Phase/Frequency plus -2%/3 Phase 4 wire/50HZ Over load at nominal output voltage 10/1 min respectively 125%/150% Operating temperature 0-50 Degree Celsius MPPT Voltage Range/Voc(VDC) 165-265/315 Maximum input current(A) 70 Switching Element and type of Charger IGBT Device MPPT With PWM Switching Grid input supply phase/Nominal voltage and Active filtering when load on main(load harmonic corrections)with 100% load 3 Phase 4 wire/415 V AC( plus 10%, -15%),50HZ Battery Voltage 240V Battery Type Dry cell type Hybrid inverter must conform to the following standard : IS 16221(Part 2), 2015/IEC62109-2:2011 and IS 16169:204/IEC 62116:2008, Battery Bank. (20 Nos.) The battery bank can be dry cell of MNRE requirement is required for Hybrid Power Plant , Battery(Dry cell) Make UTL/Luminous/Exide/Okaya/Amron/Livguard shall have a warranty of minimum 5 years. Battery bank including with rack must conform to the following standard : IS 13369:1992, IS 1651:2013, IS 15549:2005, Energy meter and netmeter : Netmeter should be as per latest regulatory of Haryana Regulatory commission and should be tested alongwith the Netmeter (Import-Export) with required CT and PT . Wires: DC and AC wires for DC side, Ac side and earthing. Make: Polycab/Grandley/KEI/RR Kabel(Length or Dia. as per requirement ) Safety and Protection and Guarantee/warranty as per MNRE/HAREDA terms and condition : Earthing as per MNRE guidelines, Lightening arrestor of equivalent capacity, MCBs, fuses and isolators as per site requirement, Balance of system: All related supplies (electrical and Hardware) incidential for setting up the plant will be taken as per site requirement , Installation and commissioning : complete civil and electrical installation of all the system components complete in all respect upto the entire satisfaction of Engineer- in- Charge of the work. Included freight (Excluding GST ) Rates as per Watt
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .