| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.2 CrAccepted-AOC JHAJJAR | ₹3.2 Cr | 1 | Accepted-AOC Accepted |
| 2 | 2₹3.3 Cr+₹10.2 L (3.18%)Rejected-AOC | ₹3.3 Cr+₹10.2 L (3.18%) | 2 | Rejected-AOC 2nd |
| 3 | 3₹3.4 Cr+₹14.8 L (4.61%)Rejected-AOC 201 2ND FLOOR IRIS TECH PARK SECTOR 48 SOHNA ROAD GURGAON 122018 HARYANA | GURUGRAM | HARYANA | 122018 | ₹3.4 Cr+₹14.8 L (4.61%) | 3 | Rejected-AOC 3rd |
| 4 | 4₹3.5 Cr+₹29.5 L (9.22%)Rejected-AOC 1077 SECTOR 16 AND 17 125001 | HISAR | HISAR | HARYANA | 125001 | ₹3.5 Cr+₹29.5 L (9.22%) | 4 | Rejected-AOC 4th |
Tender Value
₹3.6 Cr
EMD Value
₹7.3 L
Closing Date
19 May 2021, 5:00 pmClosed
Executive Engineer
Provincial Division, PWD B and R Charkhi Dadri
Periodical renewal coat with 30mm thick BC on (1) Behal Sorra in village Behal Sorra Kadim and Sorra Jadid in Loharu (2) Gignow to Sehar via Brahlu road in Loharu (Road ID MRL-03) under PMGSY-II scheme in Provl. Divn. Charkhi Dadri in Bhiwani Distt.
2021_HRY_170321_1
PWD/364.46 Lacs/Behal Sorra road and Gignow to Seh
Open Tender
Civil Works - Roads
Works
180 days
Charkhi Dadri
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹7.3 L
1 Jun 2021
29 Apr 2021
20 May 2021
29 Apr 2021
19 May 2021
29 Apr 2021
Amount
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg per sqm on the prepared bitumen/granular surface cleaned with mechanical broom including cost of bitumen as per clause No. 503. Specification.
Providing & Laying 30 mm thick compacted Bituminous Concrete (BC) in one layer with 100-120 TPH batch type hot mix plant and with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with appropriate rollers to achieve the desired compaction as per clause No. 507 MoRT&H specification (5th Revision) 2013 for road and bridge works (5th Revision)2013 using minimum 5.4% to bitumen grade VG-30 as binder content by weight of total mix & plastic waste 7% complete in all respects including cost of bitumen instruction issued from time to time by MoRT&H regarding machinery & bitumen will be followed strictly. The use of self propelled mechanical paver fitted with electronic sensor device conforming to MoRT&H specification in mandatory. If bitumen required more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Note: - Where there is only BC on existing black top (without doing DBM), cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MoRT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work
Providing & Marking center line / side line 2.5mm thick (minimum) with hot applied thermo-plastic road marking paint 10cms wide/ 15cm wide complete in all respect such as furnishing all labour, materials, tolls equipments including all incidental costs necessary for carrying out in work at site confirming to the technical specification as clause No. 803 of MORT&H specification for road and bridge works (5th revision) of 2013/ Latest edition. Each container of the thermoplastic material shall have the name trademark or other means of identification of manufacturer, batch number, date of manufacture color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian Paint-Apcomark/Berger-Sigmarc/Prismo. The glass beads shall be of Potters/Sovitec/Fleolite. The thermoplastic material shall be sampled and tested in accordance with appropriate ASTM/BS method. The contractor shall furnish to the Engineer-in-Charge a copy of certified test reports from the manufacturer of the thermoplastic material meet all requirement of the specifications. The reflectorzing glass beads shall meet the requirement of clause 803.4.2 and test methods mentioned in clause 803.4.2.4 shall be meticulously followed. The minimum thickness specified is exclusive of surface of glass beads .the method of thickness measurement shall be in accordance with appendix B and C of BS:3262 (part-3). Note:- Before start of work the contractor shall give brand , batch no. , manufacturing date of the material to be used and get approved the same from Engineer-In-Charge before use.
Preparation of berms including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift and including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305 and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section -9. Note:- No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
Routine Maintenance cost after completion for 1st Year (Maintenance rates not be quoted by the contractor and rate will be paid fixed by the deptt. )
Routine Maintenance cost after completion for 2nd Year (Maintenance rates not be quoted by the contractor and rate will be paid fixed by the deptt. )
Routine Maintenance cost after completion for 3rd Year (Maintenance rates not be quoted by the contractors and rate will be paid fixed by the deptt. )
Routine Maintenance cost after completion for 4th Year (Maintenance rates not be quoted by the contractor and rate will be paid fixed by the deptt. )
Routine Maintenance cost after completion for 5th Year (Maintenance rates not be quoted by the contractor and rate will be paid fixed by the deptt. ) Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price.
M/s K.K. Construction Company
KALUWALA CONSTRUCTION PRIVATE LIMITED
M/s Hisar Construction Company
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .