Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹62,182.77Admitted-Finance | -31.20% | ₹62,182.77 | L1 | Admitted-Finance |
| 2 | L2₹75,224.88+₹13,042.11 (21.0%)Admitted-Finance | -16.77% | ₹75,224.88+₹13,042.11 (21.0%) | L2 | Admitted-Finance |
Tender Value
₹90,000
EMD Value
₹1,800
Closing Date
1 Sept 2026, 6:00 pmClosed
Executive Enginner REW jammu
Executive Enginner REW jammu
Installation of Iron Gratings 2 no.of Solar Lights and Constt.of RCC Drain Slab near the house of Bachan Lal, Ashok Kumar w.no.5 Manda,Pyt Daskal Block Akhnoor Under scheme DDC District Capex Budget for the year 2026-27 (Block level)
2026_RDPR_322114_2
e-NIT No. 484 REWJ of 2026-27 dated 24-08-2026
Open Tender
Civil Works
Percentage
Executive Enginner REW jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹1,800
7 Sept 2026
25 Aug 2026
2 Sept 2026
25 Aug 2026
1 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | P/Laying of cement conct. 1:3:6( 1 cement :3 coarse sand :6 graded stone aggregates 20mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 2 | cum | 5,733.6 | ₹11,467.2 |
| 2 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 5.1.2 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 3.2 | cum | 7,788.4 | ₹24,922.88 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 160 | kg | 123.2 | ₹19,712 |
| 4 | Structural steel work in built up sections, trusses and framed work,
including cutting, hoisting, fixing in position and applying a priming coat ofapproved steel primer all complete.Welded | 90 | Kg | 181.6 | ₹16,344 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 11 | sqm | 286.35 | ₹3,149.85 |
| 6 | Sofit of Slab | 14 | sqm | 718.2 | ₹10,054.8 |
| 7 | Carriage of Sand avg. 6 km lead by MT | 3 | cum | 216.4 | ₹649.2 |
| 8 | Carriage of Aggregates avg. 6 km lead by MT | 5 | cum | 216.4 | ₹1,082 |
| 9 | Providing and fixingof Display board including painting,writing all complete @ | 1 | no. | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_1077758.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .