Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 CrAccepted-AOC | ₹4.8 Cr | L1 | Accepted-AOC bond singed |
| 2 | L2₹4.9 Cr+₹1.8 L (0.37%)Rejected-Finance NEERU WALA BAGH FIROZABAD UTTAR PRADESH | ₹4.9 Cr+₹1.8 L (0.37%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹4.9 Cr+₹7.5 L (1.55%)Rejected-Finance | ₹4.9 Cr+₹7.5 L (1.55%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹5.0 Cr+₹17.7 L (3.65%)Rejected-Finance BELDEI GARAPUR SAHSON PHULPUR PRAYAGRAJ | PHULPUR | PRAYAGRAJ | UTTAR PRADESH | ₹5.0 Cr+₹17.7 L (3.65%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹5.7 Cr+₹84.3 L (17.4%)Rejected-Finance | ₹5.7 Cr+₹84.3 L (17.4%) | L5 | Rejected-Finance Rejected |
Tender Value
₹5.1 Cr
EMD Value
₹10.2 L
Closing Date
13 Mar 2020, 12:00 pmClosed
Superintending Engineer
Pratapgarh Circle, PWD, Pratapgarh
Under Rajya Yojna (Samaya) Widening and Strengthening of Katra Gulab Singh Laxmiganj Saray Anadev Bazar (ch. 0.000 to 5.515) in District Pratapgarh
2020_CEALD_435794_1
535/93C/etendering/P.F.C/2020 Dt 30.1.2020(1)
Open Tender
Civil Works
Item Rate
270 days
PBH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
Exn. Engg.Construction Division 2, PWD, PRATAPGARH
₹10.2 L
Pratapgarh Circle, PWD, Pratapgarh
28 May 2020
17 Feb 2020
13 Mar 2020
17 Feb 2020
13 Mar 2020
17 Feb 2020
20 Feb 2020
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per Morth 301.including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. as per morth 305.including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Construction of granular sub-base coarse by providing coarse graded Material, grading one spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory power roller to achieve the desired density, complete as per clause 401.including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, with 1% OPC cement & 3.5% emulsion laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per morth 406.including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for .B.C. as per morth 503.including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects.including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Earth work in excavation for foundation of structures as per drawings and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. as per morth SI NO. 12.1(304).including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.as per morth 12.4 (2100).including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing and laying 40 mm gauge brick ballast below pipe and in sides. including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Supply of 350 mm dia NP3 pipe.including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Supply of 600 mm dia NP3 pipe.including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Supply of 1000 mm dia NP3 pipe.including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
laying & fixing of 1000 mm dia NP-3 pipe with collers.including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
laying & fixing of 350 mm dia NP-3 pipe with collers.including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
laying & fixing of 600 mm dia NP-3 pipe with collers.including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Class 150 brick work in foundation and plinth with cement mortar 1:3 (1Cement :3 Coarse sand) as per morth. 12.5(1300).including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Struck Cement Pointing on Brick work with cement mortar 1:3 (1 Cement : 3 Fine sand). As per morth S No. 13.2(1300 & 2200).including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
12mm cement plaster in 1;3 cement & coarse sand mortar. As per morth 13.3(1300 & 2200).including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Plain/Reinforced cement concrete in open foundation completed as per drawing and techincal specifications.(P.C.C.-M-15) in U-Type drain.including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Plain/Reinforced cement concrete in open foundation completed as per drawing and techincal specifications.(R.C.C.-M-20) in U-Type drain. including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications.clauses 1000 & 1202. including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
M/s Harsh Construction
M/S SHANKAR CONSTRUCTION
M/s JAYSINGH
J.P.ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .