Loading…
Loading…
Tender Value
₹9.4 L
EMD Value
₹18,900
Closing Date
22 Sept 2026, 1:00 pm7d left
Executive Engineer PWD RNB DH PORA
Executive Engineer PWD RNB DH PORA
Construction of two seated Sanitary/Toilet complex at HSS Nehama
2026_PWDJK_324055_2
56 Of RnB/D.H. Pora/2026-273723-31 Dtd 09/09/2026
Open Tender
Chemicals/Minerals
Percentage
270 days
Executive Engineer PWD RNB DH PORA
Please refer Tender documents.
5 documents required · 5 mandatory
₹600
Acc no 0470010200000099
₹18,900
9 Sept 2026
9 Sept 2026
24 Sept 2026
10 Sept 2026
22 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation All kinds of soil by manual means in trenches for foundations (not exceeding 1.5 m in width) not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 41.11 | cum | 420.2 | ₹17,273.8 |
| 2 | Providing and laying stone soling duly hand packed in maintaning level and section including ramming and carriage of the same up to site of work complete. | 7.18 | Cum | 677.97 | ₹4,867.8 |
| 3 | Providing and laying in position cement concrete 1:4:8 (1
Cement:4 Corase sand: 8 graded stone aggregate 40 mm
nominal size ) including curing but excluding the
cost of centring and shuttering. All work upto plinth level | 2.03 | Cum | 4,527.46 | ₹9,190.74 |
| 4 | Providing and laying in position reinforced cement concrete 1:1.5:3 (1 Cement:1.5 Corase sand: 3 grade stone aggregate 20 mm nominal size) including curing but excluding the
cost of centring, shuttering,finishing and reinforcement. All work upto plinth level | 4.32 | Cum | 6,828.05 | ₹29,497.18 |
| 5 | Providing and laying in position cement concrete 1:2:4 (1
Cement:2 Corase sand: 4 grade stone aggregate 20 mm
nominal size ) including curing but excluding the
cost of centring and shuttering. All work upto plinth level | 12.88 | Cum | 5,778.51 | ₹74,427.18 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering,
finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.21 | cum | 8,610.17 | ₹19,028.47 |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and
struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.33 | cum | 8,237.16 | ₹2,718.26 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more. | 823.83 | kg | 108.01 | ₹88,979.8 |
| 9Centering and shuttering including strutting, propping etc. and removal of form work for | |||||
| 9.01 | Foundations, footings, bases for columns | 18.55 | sqm | 251.03 | ₹4,656.68 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_1092457.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .