| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-Finance | ₹1.5 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.6 Cr+₹6.7 L (4.30%)Rejected-Finance 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | ₹1.6 Cr+₹6.7 L (4.30%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.6 Cr+₹9.4 L (6.06%)Rejected-Finance FLAT NO 02 KAPIL VIHAR NEAR BANAVEDI DHANA ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.6 Cr+₹9.4 L (6.06%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.7 Cr+₹14.8 L (9.56%)Rejected-Finance | ₹1.7 Cr+₹14.8 L (9.56%) | L4 | Rejected-Finance L4 |
| 5 | L5₹1.9 Cr+₹37.3 L (24.2%)Rejected-Finance | ₹1.9 Cr+₹37.3 L (24.2%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | DINESH CIVIL CONSTRUCTION CO. L4 | MA AND SONS L3 | M/s Ajay Kumar Contractor L2 | M/S SHAMBHVI MAHAKAL CONSTRUCTION L5 | M/S ARYA CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | E/W in foundation in dry soil including lift upto 1.5 M and lead upto 30 M including back filling, watering and ramming of excavated earth or as directed by Engineer in charge. | 1,890 | CUM | 100 ₹1,89,000 | 60 ₹1,13,400 | 54 ₹1,02,060 | 50 ₹94,500 | 46.23 ₹87,374.7 Lowest |
| 2.00 | Laying 50 mm thick C.C. of M10 (1:3:6) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate in base including cost of all materials, labour charges, curing work, T&P etc. | 600 | CUM | 4,900 ₹29,40,000 | 3,200 ₹19,20,000 Lowest | 3,800 ₹22,80,000 | 5,800 ₹34,80,000 | 4,809.99 ₹28,85,994 |
| 3.00 | Centring &shuttering for C.C.Work I/C All Cost Of Labour T&P etc Comp. | 3,360 | SQM | 200 ₹6,72,000 Lowest | 400 ₹13,44,000 | 200 ₹6,72,000 Lowest | 500 ₹16,80,000 | 396.75 ₹13,33,080 |
| 4.00 | Centering and Shuttering in of R.C.C. work including all labour , T&P, etc. | 235 | SQM | 600 ₹1,41,000 | 550 ₹1,29,250 | 200 ₹47,000 Lowest | 700 ₹1,64,500 | 555.45 ₹1,30,530.75 |
| 5.00 | Laying 75 mm thick C.C. lining of M20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc. | 1,330 | CUM | 6,990 ₹92,96,700 | 7,200 ₹95,76,000 | 7,200 ₹95,76,000 | 7,500 ₹99,75,000 | 5,951.94 ₹79,16,080.2 Lowest |
| 6.00 | Laying Cement concrite in M-15 1:2:4 in cement coarse sand and stone grit mix. including all costs of T&P material required for proper complition of work. | 45 | CUM | 6,000 ₹2,70,000 | 6,500 ₹2,92,500 | 5,400 ₹2,43,000 Lowest | 7,000 ₹3,15,000 | 5,581.41 ₹2,51,163.45 |
| 7.00 | Class - 150 ( Non modular ) brick work in 1:3 cement and coarse sand of FM not less than 1.25 mortar in foundation including supply of all material, labour and T&P etc. required for proper completion of the work. | 235 | CUM | 5,500 ₹12,92,500 | 5,500 ₹12,92,500 | 6,000 ₹14,10,000 | 5,500 ₹12,92,500 | 4,337.34 ₹10,19,274.9 Lowest |
| 8.00 | Supplying and laying TMT Steel bar reinforcement as per approved drawing, including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work. | 7.5 | MT | 70,000 ₹5,25,000 | 70,000 ₹5,25,000 | 81,000 ₹6,07,500 | 75,000 ₹5,62,500 | 54,866.04 ₹4,11,495.3 Lowest |
| 9.00 | Struck Pointing With Cement Mortar Consisting of 1:2 (Cement:Fine Sand of 1.25 Finenes Modulus On Brick Work Including Supply Of all Materials Labour And Completion Of Work. | 150 | SQM | 140 ₹21,000 | 120 ₹18,000 | 200 ₹30,000 | 110 ₹16,500 | 99.36 ₹14,904 Lowest |
| 10.00 | Supply & fixing of 75 mm dia PVC pipe for weep wholes i/c all material T&P,labour required for completion of work. | 7.2 | RM | 100 ₹720 Lowest | 150 ₹1,080 | 500 ₹3,600 | 250 ₹1,800 | 193.2 ₹1,391.04 |
Tender Value
₹2.3 Cr
EMD Value
₹4.5 L
Closing Date
5 Aug 2026, 5:00 pmClosed
Suprintending Engineer
Office of the SE MGCCC Moradabad
Construction of CC lining, V.R.B and syphon on the Head Regulator system in District Aligarh
2026_UPIDC_1166878_6
05/SE/2026-27
Open Tender
Civil Works
Item Wise
Aligarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹4.5 L
Moradabad
16 Sept 2026
17 Jul 2026
6 Aug 2026
17 Jul 2026
5 Aug 2026
17 Jul 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in foundation in dry soil including lift upto 1.5 M and lead upto 30 M including back filling, watering and ramming of excavated earth or as directed by Engineer in charge. | - | CUM | 67 | - |
| 2 | Laying 50 mm thick C.C. of M10 (1:3:6) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate in base including cost of all materials, labour charges, curing work, T&P etc. | - | CUM | 6,971.9 | - |
| 3 | Centring &shuttering for C.C.Work I/C All Cost Of Labour T&P etc Comp. | - | SQM | 575 | - |
| 4 | Centering and Shuttering in of R.C.C. work including all labour , T&P, etc. | - | SQM | 805 | - |
| 5 | Laying 75 mm thick C.C. lining of M20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc. | - | CUM | 8,626.2 | - |
| 6 | Laying Cement concrite in M-15 1:2:4 in cement coarse sand and stone grit mix. including all costs of T&P material required for proper complition of work. | - | CUM | 8,089 | - |
| 7 | Class - 150 ( Non modular ) brick work in 1:3 cement and coarse sand of FM not less than 1.25 mortar in foundation including supply of all material, labour and T&P etc. required for proper completion of the work. | - | CUM | 6,286.1 | - |
| 8 | Supplying and laying TMT Steel bar reinforcement as per approved drawing, including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work. | - | MT | 79,516 | - |
| 9 | Struck Pointing With Cement Mortar Consisting of 1:2 (Cement:Fine Sand of 1.25 Finenes Modulus On Brick Work Including Supply Of all Materials Labour And Completion Of Work. | - | SQM | 144.65 | - |
| 10 | Supply & fixing of 75 mm dia PVC pipe for weep wholes i/c all material T&P,labour required for completion of work. | - | RM | 280 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.13 MB
Tenderbooklot06div12.pdf
Tender Documents • 3.63 MB
BOQ_2195237.xls
BOQ • 0.26 MB
Corrigendumtendernotice05.pdf
PDF • 0.08 MB
Corrigendumlot01to06.pdf
PDF • 0.04 MB
CorrigenDiv12.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .