Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.7 LAdmitted-Finance | -21.99% | ₹7.7 L | L1 | Admitted-Finance |
| 2 | L2₹7.8 LAdmitted-Finance | -21.57% | ₹7.8 L | L2 | Admitted-Finance |
| 3 | L3₹8.1 LAdmitted-Finance | -17.86% | ₹8.1 L | L3 | Admitted-Finance |
| 4 | L4₹8.3 LAdmitted-Finance | -16.78% | ₹8.3 L | L4 | Admitted-Finance |
| 5 | L5₹8.4 LAdmitted-Finance | -15.15% | ₹8.4 L | L5 | Admitted-Finance |
Tender Value
₹9.9 L
EMD Value
₹19,780
Closing Date
4 Aug 2026, 6:00 pmClosed
Secretary UIT Chittorgarh
Office of the Secretary UIT Chittorgarh
40 - Fencing in UIT Land Zone 3 in UIT Area Chittorgarh
2026_UITCG_578269_40
NIT 16/2026-27 Secretary UIT Chittorgarh
Open Tender
Civil Works
Percentage
180 days
Chittorgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Through SSO ID
₹19,780
Yes
7 Aug 2026
28 Jul 2026
5 Aug 2026
28 Jul 2026
4 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods watering, rolling each layer with 1/2 tonne roller, or stone or steel rammers and rolling every 3rd and top- most layer with power roller of minimum 8-10 tonne capacity and dressing up in embankment for roads, flood banks marginal banks and guide banks or filling up ground depressions, lead up to 50 Mtr. and lift up to 1.5 Mtr.:All kinds of soil | - | P Cum. | 272 | - |
| - | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | - | P Cum. | 3,302 | - |
| - | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M20 grade Nominal Mix 1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). | - | P Cum. | 4,915 | - |
| - | Providing and fixing steel gate, grating , and grills made of angles, tees, square bars, flats,or black pipe with holdfast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide | - | pkg | 96 | - |
| - | Providingandfixing1.2mhighGIbarbedwirefencingwith1.8mRCCposts150mmx150mmplacedevery3mcentre-to-centrefoundedinM15gradecementconcrete,0.6mbelowgroundlevel,every15thpost,lastbutoneendpostandcornerpostshallbestruttedonbothsidesandendpostononesideonlyandprovidedwith9horizontallinesand2diagonalsinterwovenwithhorizontalwires,fixedwithGIstaples,turnbucklesetc.complete as per MoRTH Specification Clause 808 | - | sqm | 412 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
Tendernotice_2.pdf
PDF • 0.36 MB
Tendernotice_3.pdf
PDF • 0.56 MB
Tendernotice_4.pdf
PDF • 0.08 MB
BOQ_1027710.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].