Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹6.0 L+₹46,403.07 (8.45%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹6.4 L+₹94,794.85 (17.3%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹8.8 L+₹3.3 L (60.0%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹9.2 L+₹3.7 L (67.2%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹9.5 L
EMD Value
₹18,940
Closing Date
21 Aug 2026, 4:00 pmClosed
Executive Engineer PWD(RandB) Division Satwari
Office of the Executive Engineer PWD(RandB) Division Satwari
Repair/renovation of Ayushaman Arogya Mandir Karloop
2026_PWDJK_319802_2
Short e-NIT No. 57 of 2026-27 Dated 06-08-2026
Open Tender
Civil Works
Percentage
30 days
Marh
As per eNIT
2 documents required · 2 mandatory
₹600
Executive Engineer PWD(RandB) Division Satwari
₹18,940
Satwari
2 Sept 2026
6 Aug 2026
22 Aug 2026
6 Aug 2026
21 Aug 2026
6 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 10.19 | Cum | 479.3 | ₹4,884.07 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 5.42 | Cum | 4,826.5 | ₹26,159.63 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but exuding the cost of centring and shuttering. All work upto plinth level with: M10 | 4.06 | Cum | 5,733.6 | ₹23,278.42 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1.5:3 | 0.74 | Cum | 9,821.85 | ₹7,268.17 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete | 66.96 | Kg | 123.2 | ₹8,249.47 |
| 6 | Supplying and stacking of good earth at site including royalty (earth
measured in stacks will be reduced by 20% for payment) | 16.8 | cum | 281.3 | ₹4,725.84 |
| 7 | Uprooting rank vegetation and weeds by digging the area to a depth of
60 cm removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water,
uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and
lifts | 150 | sqm | 61.82 | ₹9,273 |
| 8 | Regrading terracing of mud phaska covered with tiles or bricks, in cement by dismantling tiles or bricks, removing mud plaster, preparing the surface of mud phaska to proper slope, relaying mud plaster gobri leaping and tiles or bricks, grouted in cement mortar 1:3 (1 cement: 3 fine sand), including replacing unserviceable tiles or bricks with new ones and disposal of unserviceable material to the dumping ground (the cost of the new tiles or brick excluded) within 50 meters lead. | 50.6 | Sqm | 545.75 | ₹27,614.95 |
| 9 | Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement: 3 fine sand) as per standard design. In 75x75 mm deep chase. | 37.8 | Mtr | 241.45 | ₹9,126.81 |
| 10 | Demolishing brick work manually/by mechanical means including
stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:
- In cement mortar | 1.04 | Cum | 1,458.45 | ₹1,516.79 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_1060387.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .