Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹4.1 L+₹1,131.55 (0.27%)Rejected-Finance SHRI CHANDRAPAL SINGH VILLAGE BADRADURPUR POST KHEDA BUJURG DISTRICT ALIGARH | ALIGARH | UTTAR PRADESH | 202001 | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | CHANDRA PAL SINGH L2 | JAGDESH PRASAD L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc. | 107.98 | CUM | 63 ₹6,802.99 | 62.73 ₹6,773.84 Lowest |
| 2.00 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 12.14 | CUM | 5,100 ₹61,914 | 5,015.11 ₹60,883.44 Lowest |
| 3.00 | Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | 3.2 | CUM | 5,100 ₹16,304.7 | 5,067.21 ₹16,199.87 Lowest |
| 4.00 | Providing and Laying M-15 C.C. (1:2:4) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 35.37 | CUM | 5,400 ₹1,90,998 Lowest | 5,445.5 ₹1,92,607.34 |
| 5.00 | Providing and Laying M-20 C.C.1:1.5:3 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 3.82 | CUM | 6,100 ₹23,302 | 6,045.73 ₹23,094.69 Lowest |
| 6.00 | Providing and Laying M-25 C.C.1:1:2 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 0.2 | CUM | 7,000 ₹1,400 | 6,890.1 ₹1,378.02 Lowest |
| 7.00 | Providing and fixing Centering & shuttering for C.C. works (form work of concrete) including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work. | 133.22 | SQM | 455 ₹60,616.01 | 451.62 ₹60,165.72 Lowest |
| 8.00 | Providing and fixing of 100 mm dia P.V.C. pipe in proper position for drainage spout including cost of all material, cutting, jointing , labour, T&P, all lifts and leads etc complete as per direction of Engineer-in-charge. | 6 | RM | 133 ₹798 | 130.28 ₹781.68 Lowest |
| 9.00 | providing and Laying 12 mm Thick Plaster in 1:4 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work | 3.6 | SQM | 133 ₹479.47 | 130.28 ₹469.66 Lowest |
| 10.00 | Providing dry brick Pitching including cost of all material ,labour ,T&P ,all lifts and leads etc complete. | 15.33 | SQM | 455 ₹6,975.15 | 443.9 ₹6,804.99 Lowest |
Tender Value
₹4.3 L
EMD Value
₹10,000
Closing Date
16 Jul 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE M.G.C.C.Div-8 Bulandshahr
M.G.C.C.Div-8 Bulandshahr
Const. of Fall at Km. 0.600 of Milak Minor.
2025_UPIDC_1013297_72
03/EE/2024-25
Open Tender
Civil Works - Highways
Item Rate
120 days
SAMBHAL
2 documents required · 2 mandatory
₹856
₹10,000
Yes
5 Dec 2025
10 Jul 2025
17 Jul 2025
10 Jul 2025
16 Jul 2025
10 Jul 2025
10 Jul 2025 - 16 Jul 2025
Amount
Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc.
Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete.
Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work.
Providing and Laying M-15 C.C. (1:2:4) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete.
Providing and Laying M-20 C.C.1:1.5:3 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete.
Providing and Laying M-25 C.C.1:1:2 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete.
Providing and fixing Centering & shuttering for C.C. works (form work of concrete) including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work.
Providing and fixing of 100 mm dia P.V.C. pipe in proper position for drainage spout including cost of all material, cutting, jointing , labour, T&P, all lifts and leads etc complete as per direction of Engineer-in-charge.
providing and Laying 12 mm Thick Plaster in 1:4 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work
Providing dry brick Pitching including cost of all material ,labour ,T&P ,all lifts and leads etc complete.
Earth work in Filling in embankment in ordinary soil including ramming and dressing the surface to be required levels and slopes and also including all lift and Lead upto 1 km distance including cost of all Labour T&P etc complete as directed by Engineer-in- charge.
CHANDRA PAL SINGH (BID ID -5340882)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .