Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.2 L+₹22.01 (0.01%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.2 L
EMD Value
₹4,400
Closing Date
7 Sept 2026, 6:00 pmClosed
XEN REW UDHAMPUR
XEN REW UDHAMPUR
BOQ
2026_RDPR_322813_9
2nd Call e-NIT No. 150 REW UDHAMPUR of 2026-27 Dated 31-08-2026
Open Tender
Civil Works
Percentage
30 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XEN REW UDHAMPUR
₹4,400
8 Sept 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 8.61 | cum | 479.3 | ₹4,126.77 |
| 2 | Providing and laying 1:5:10 in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 2.15 | cum | 4,826.5 | ₹10,376.98 |
| 3 | Providing and laying 1:3:6 in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) & 30% BOULDERS | 15.4 | cum | 5,733.6 | ₹88,297.44 |
| 4 | Providing and laying Random Rubble stone masonary laid dry.without bond stone. | 12.79 | cum | 2,793 | ₹35,722.47 |
| 5 | Providing , laying and Spreading RBM/NBM | 21 | cum | 650 | ₹13,650 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: | 62.4 | sqm | 286.35 | ₹17,868.24 |
| 7 | Backfilling of Earth Behind P/Work Earth 70 % | 72 | cum | 218 | ₹15,696 |
| 8 | Backfilling of Earth Behind P/Work Bouldors 30% | 18 | cum | 937 | ₹16,866 |
| 9 | Sand to site of work 70KM MT | 8.25 | cum | 961.94 | ₹7,936.01 |
| 10 | Stone Aggregates to site of work 10KM MT | 15.8 | cum | 279.04 | ₹4,408.83 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_1084370.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .