Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.9 LAccepted-AOC KHAGA FATEHPUR UTTAR PRADESH | ₹28.9 L | L1 | Accepted-AOC BOND |
| 2 | L2₹29.0 LRejected-Finance | ₹29.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹30.2 LRejected-Finance GAUTAM NAGAR FATEHPUR | ₹30.2 L | L3 | Rejected-Finance L3 |
| 4 | L4₹30.6 LRejected-Finance | ₹30.6 L | L4 | Rejected-Finance L4 |
| 5 | L5₹31.0 LRejected-Finance FATEHPUR | ₹31.0 L | L5 | Rejected-Finance L5 |
Tender Value
₹48.4 L
EMD Value
₹4.4 L
Closing Date
30 Mar 2026, 12:00 pmClosed
Superintending Engineer
Pratapgarh Circle, PWD, Pratapgarh
New Construction of Sarauli to Pahora Link Road (With Five year Maintenance as per attached SOP) (6)
2026_CEALD_1129305_6
959/95C-ETENDERING/PFC/2026 DT. 23.02.2026
Open Tender
Civil Works
180 days
Fatehpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹4.4 L
Pratapgarh Circle, PWD, Pratapgarh
25 May 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
26 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Construction of subgrade with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lift upto 1.50 m & lead upto 30 m as per Technical Specification Clause 303.1. (Including labour cess but Excluding GST) | - | Cum | - | - | |
Providing, laying, spreading Material on prepared sub grade by adding cement @ 2% by weight of the spread Material manually by mixing in place with rotavator compacting with vi roller at OMC to achieve the desired unconfined compressive strength and form a layer of subbase. (Including labour cess, Royalty but Excluding GST) | - | Cum | - | - | |
Providing, laying and spreading Material on prepared sub base adding cement @ 4% by weight of the spread Material manually by mixing in place with rotavator compacting with road roller at OMC to achieve the desired unconfined compressive strength and form a layer of base. (Including labour cess, Royalty but Excluding GST) | - | Cum | - | - | |
Providing and applying tack coat with Bitumen VG10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared surface cleaned with Hydraulic broom as per Technical Specification Clause 503. (Including labour cess but Excluding GST) | - | Sqm | - | - | |
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using bitumenVG10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat Type C as per Technical Specification Clause 508. (Including labour cess, Royalty but Excluding GST) | - | Sqm | - | - | |
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 (Including labour cess, Royalty but Excluding GST) | - | Sqm | - | - | |
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lift upto 1.50 m & lead upto 30 m as per Technical Specification Clause 303.1.(Including labour cess, but Excluding GST) | - | Cum | - | - | |
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material by Mechanical Means (Including labour cess, but Excluding GST) | - | Cum | - | - | |
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Including labour cess, Royalty but Excluding GST) | - | Cum | - | - | |
Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 (Including labour cess, Royalty but Excluding GST) | - | Cum | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_2107206.xls
BOQ • 0.28 MB
T2_6.pdf
Tender Documents • 2.09 MB
Download all tender documents and submit your bid