| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.3 LAccepted-AOC NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹54.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹56.6 LRejected-AOC | ₹56.6 L | L2 | Rejected-AOC Not Considered |
| 3 | L3₹67.1 LRejected-AOC | ₹67.1 L | L3 | Rejected-AOC Not Considered |
| Sl No | Description | Qty | Unit | M.Manimaan L3 | PD PROMOTORS PVT LTD L2 | K DHINAKARAN L1 |
|---|---|---|---|---|---|---|
| 1.00 | Fabrication, Galvanising and supply of GI tower parts including cost of all materials, labour, lead, lift etc., complete.as directed by the engineer at site | 22.5 | MT | 1,35,000 ₹30,37,500 | 1,05,000 ₹23,62,500 | 1,00,000 ₹22,50,000 Lowest |
| 2.00 | Supply of Hot dip Galvanised GI bolts & Nuts of various size including cost of all materials, labour, lead, lift etc., complete.as directed by the engineer at site | 1 | MT | 1,60,000 ₹1,60,000 | 1,20,000 ₹1,20,000 | 1,05,000 ₹1,05,000 Lowest |
| 3.00 | Tower accessories - Danger plate | 1 | Nos | 500 ₹500 Lowest | 2,000 ₹2,000 | 1,000 ₹1,000 |
| 4.00 | Tower accessories - Number plate | 1 | Nos | 500 ₹500 Lowest | 2,000 ₹2,000 | 1,000 ₹1,000 |
| 5.00 | Tower accessories - Phase plate (Set of three) | 1 | Nos | 1,500 ₹1,500 | 3,000 ₹3,000 | 1,000 ₹1,000 Lowest |
| 6.00 | Tower accessories - Name plate (Set of two) | 1 | Nos | 1,000 ₹1,000 Lowest | 2,000 ₹2,000 | 1,000 ₹1,000 Lowest |
| 7.00 | Tower accessories - Circuit plate (Set of Two) | 1 | sets | 1,000 ₹1,000 Lowest | 2,000 ₹2,000 | 1,000 ₹1,000 Lowest |
| 8.00 | Tower accessories - Anticlimbing device (Set of Four) | 1 | set | 2,500 ₹2,500 | 15,000 ₹15,000 | 1,000 ₹1,000 Lowest |
| 9.00 | Labour charges for clearing of juliflora jungle with uprooting for facilitating survey including cost of all labour, T&P, lead, lift etc., complete. | 1,000 | m2 | 8 ₹8,000 | 5 ₹5,000 | 1 ₹1,000 Lowest |
| 10.00 | Soil investigation by auger up to the depth of 10m or upto refusal strate where N-value obtained is 50/100 whichever met earlier, conducting penetration test at the change of layer and at specified interval of 1m to 1.5m, carrying out lab test as per IS standards, providing report with recommendation for foundation including mobilisation,demobilisation, shifting from location to location, water charges for drilling, etc., complete. | 1 | Loc. | 50,000 ₹50,000 | 60,000 ₹60,000 | 20,000 ₹20,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹57,100
Closing Date
3 Sept 2025, 2:00 pmClosed
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
As per NIT
2025_EB_597046_1
OT-52/2025-26 of SE/GCC-II
Open Tender
Civil Works
Works
120 days
Kanathur
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹57,100
Yes
17 Jun 2026
25 Aug 2025
4 Sept 2025
25 Aug 2025
3 Sept 2025
25 Aug 2025
Amount
Fabrication, Galvanising and supply of GI tower parts including cost of all materials, labour, lead, lift etc., complete.as directed by the engineer at site
Supply of Hot dip Galvanised GI bolts & Nuts of various size including cost of all materials, labour, lead, lift etc., complete.as directed by the engineer at site
Tower accessories - Danger plate
Tower accessories - Number plate
Tower accessories - Phase plate (Set of three)
Tower accessories - Name plate (Set of two)
Tower accessories - Circuit plate (Set of Two)
Tower accessories - Anticlimbing device (Set of Four)
Labour charges for clearing of juliflora jungle with uprooting for facilitating survey including cost of all labour, T&P, lead, lift etc., complete.
Soil investigation by auger up to the depth of 10m or upto refusal strate where N-value obtained is 50/100 whichever met earlier, conducting penetration test at the change of layer and at specified interval of 1m to 1.5m, carrying out lab test as per IS standards, providing report with recommendation for foundation including mobilisation,demobilisation, shifting from location to location, water charges for drilling, etc., complete.
Conducting check survey, carrying theodolite instrument, measuring span length and pit marking including cost of all men and materials as directed by the Department Engineer at site.
Levelling the site and removing scrub jungle and earth by engaging JCB with lead and lift etc., complete as directed by the Engineer at site.
Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including cost of all materials, T&P, lead, lift, labour etc., complete.
Installation of stub, cleat and template in position and alignment including cost of all materials, template assembly, shifting the assembly from one location and reassembling in other location, prop setting arrangements, transport, labour, lead, lift etc., complete as directed by the Department Engineer at site.(KCO tower)
Supplying and filling with M - sand for foundation including cost of sand, all labour, lead, lift, consolidation, T&P etc., complete.
Providing Plain cement concrete 1:3:6 using 20mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc., complete.
Providing RCC M30 (minimum cement content 320 kg/cum) using 20mm HBG metal without formwork including cost and conveyance of all materials, labour, lead, lift, curing etc., complete but excluding cost of steel reinforcement as directed.
Providing RCC M30 (minimum cement content 320 kg/cum) using 20mm HBG metal with steel shuttering and steel form work as per drawing including cost and conveyance of all materials, labour, lead, lift, curing etc., complete but excluding cost of steel reinforcement as directed.
Supplying, fabricating and placing in position of MS/RTS reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete, as directed.
Bailing out of water by pump set during excavation and concreting using diesel pump 3/5HP with motor including hire charges, cost of diesel, engine oil, labour, transport, lead, lift, etc., complete.
Providing shoring and shuttering using necessary country wood planks and scantlings of required size, including cost of all materials, transport, labour, lead, lift etc., complete as directed. (any other improved method is also acceptable to TANTRANSCO, but at no extra cost to TANTRANSCO).
GST for bidders outside TamilNadu (IGST)
PD PROMOTORS PVT LTD (BID ID -1447719)
M.Manimaan (BID ID -1447108)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].