Loading…
Loading…
Tender Value
₹22.9 L
EMD Value
₹45,840
Closing Date
7 Sept 2026, 2:30 pm
Director PNRD BTC Kokrajhar
Director PNRD BTC Kokrajhar
DPRD/BTC/GAD/Baksa-17/2026/18
2026_BoTC_53482_1
DPRD/BTC/GAD/Baksa-17/2026/18
Open Tender
Civil Works
Item Rate
180 days
Baksa
Refer to Bid Document
4 documents required · 4 mandatory
₹458
₹45,840
Yes
17 Aug 2026
17 Aug 2026
8 Sept 2026
17 Aug 2026
7 Sept 2026
17 Aug 2026
17 Aug 2026 - 7 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Statue Pedestal : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2.8.1 All kinds of soil. | 12.49 | Cu.m | - | - |
| 2 | Brick work with common burnt clay F.P.S. ( non-modular) bricks of class designation 7.5 in foundation and plinth in:
6.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand) | 49.36 | Sqm | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.74 | Cum | - | - |
| 4 | 5.22A Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22A.6 Thermo-Mechanically Treated bars of Grade Fe-500D or more. | 597.88 | Kg | - | - |
| 5 | FORM WORK :
Centering and shuttering including strutting, propping etc. and removal of form for
5.9.1 : Foundations, footings, bases of columns, etc. for mass concrete | 15.36 | Sqm | - | - |
| 6 | 5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers | 14.4 | Sqm | - | - |
| 7 | 5.9.6 Columns, Pillars, Piers, Abutments, Posts and struts. | 32.8 | Sqm | - | - |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
5.1.3 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.46 | Cum | - | - |
| 9 | Brick work with common burnt clay F.P.S. ( modular) bricks of class designation 7.5 in foundation and plinth in:
6.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand) | 13.72 | Cum | - | - |
| 10 | 2.27 Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 45 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
SBD_47.pdf
Tender Documents • 1.54 MB
BOQ_84169.xls
BOQ • 0.25 MB
FOB_47.pdf
Additional Documents • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].