Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹6,840
Closing Date
16 Sept 2026, 3:00 pm
Block Development Officer(V.P), Pudupalayam
Block Development Office, Pudupalayam
Construction of Mini CSC Common Toilet (Type-3)_ Elementary School (Girls)in Melpadur Panchayat
2026_RDTN_698455_1
B5_424_2026
Open Tender
Civil Works - Buildings
Works
Block Develpment Office, Pudupalayam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,840
Yes
27 Aug 2026
27 Aug 2026
16 Sept 2026
27 Aug 2026
16 Sept 2026
27 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Name of Work: Construction of Mini CSC Girls Type-3 at Melpadur panchayat pudupalayam Block | |||||
| 1.01 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation | 13.64 | Cum | - | - |
| 1.02 | Refilling and supply of gravel from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 5.11 | Cum | - | - |
| 1.03 | Plain Cement Concrete 1:4:8 (one cement, four sand and eight hard granite broken stone of 40mm size ISS gauge) for foundation and footing including mixing, placing, ramming ,finishing curing etc. complete in accordance with standard specification and as directed by the TWAD Board Officers. | 3.26 | Cum | - | - |
| 1.04 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 3.24 | Cum | - | - |
| 1.05 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 7.08 | Cum | - | - |
| 1.06 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 2.45 | Cum | - | - |
| 1.07 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 5.06 | Cum | - | - |
| 1.08 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | 12.46 | Cum | - | - |
| 1.09 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | 15.64 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Tenderdocument.pdf
Tender Documents • 0.67 MB
BOQ_839561.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].