Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.7 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹24.0 L+₹25,075.83 (1.06%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹22.8 L
EMD Value
₹23,000
Closing Date
22 Jul 2020, 3:00 pmClosed
Project Director
DRDA Krishnagiri
Krishnagiri DT -SFC MI Tanks and Ponds 2019-20- Mathur Block -3 Works- Package No TN-04-KRI-85
2020_RDTN_171032_1
Roc_No_5732_2020_R4_15_06_20
Open Tender
Civil Works - Water Works
Item Rate
180 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹23,000
DRDA Krishnagiri
27 Jul 2020
11 Jul 2020
22 Jul 2020
11 Jul 2020
22 Jul 2020
11 Jul 2020
13 Jul 2020
Amount
1.Rejuvenation of Minor IrrigationTank of Koneri Eri H/o Naralapalli - Rs. 7.21 Lakhs
Clearing and grubbing Tank bund including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank for formation of bund with a lead of 0-100m deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete including filling in layers of 15cm thick and watering consolidation using power rollers (8 - 10 tonnes) to achieve proper compaction test more than 95% complying with standard specification as directed by the departmental officers
Formation of fore shore bund by dumping the excess earth excavated soil after bund strengthening etc , complete
Trenching work for the purpose of percolation of surface and subsurface water in to the tank along the bundside in the water spread area at the toe of 10m distance away from the bund in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers for formation of bund in layers of suitable thickness , depending upon type of compaction equipment deployed and not exceeding 23cm thicknees ,benching of slopes prior to placement of earth fill including benching, formation of bunds, breaking clods, sectioning etc., complete
Supply Channel inlet and outlet
Clearing and grubbing Tank bund including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank for formation of bund with a lead of 0-100m deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete including filling in layers of 15cm thick and watering consolidation using power rollers (8 - 10 tonnes) to achieve proper compaction test more than 95% complying with standard specification as directed by the departmental officers (Supply Channels inlet and outlet channels)
Repairs to Weir at Koneri eri
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Plastering with CM 1:3, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Providing rough stone dry packing at Koneri eri
Earth work open excavation in all soils and sub soils to full depth as may be directed except hard rock requiring, blasting, but inclusive of shoring strutting and bailing out water were ever Necessary Etc Complete compling with standard specifications and as directed by the departmental officers
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,aying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Rough stone dry packing for appron and revetment using new rough stones including stacking the same for premeasurement etc., complete complying with standard specifications and as directed by the departmental officers
Provision for Name board arrangements
Provision for Boundry Stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
2.Renovation of Thambinaickan Eri H/o Kannandahalli - Rs. 7.70 Lakhs
Clearing the Juliflora with uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank for formation of bund with a lead of 0-100m deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete including filling in layers of 15cm thick and watering consolidation using power rollers (8 - 10 tonnes) to achieve proper compaction test more than 95% complying with standard specification as directed by the departmental officers
Formation of fore shore bund by dumping the excess earth excavated soil after bund strengthening etc , complete
Supply Channel inlet and outlet
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank for formation of bund with a lead of 0-100m deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete including filling in layers of 15cm thick and watering consolidation using power rollers (8 - 10 tonnes) to achieve proper compaction test more than 95% complying with standard specification as directed by the departmental officers (Supply Channels inlet and outlet channels)
Repairs to Weir at Kattupatti eri
Earth work open excavation in all soils and sub soils to full depth as may be directed except hard rock requiring, blasting, but inclusive of shoring strutting and bailing out water were ever Necessary Etc Complete compling with standard specifications and as directed by the departmental officers
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,aying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Below ground level
above ground level
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for 10 cum.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Providing rough stone dry packing at muthagounden Eri
Earth work open excavation in all soils and sub soils to full depth as may be directed except hard rock requiring, blasting, but inclusive of shoring strutting and bailing out water were ever Necessary Etc Complete compling with standard specifications and as directed by the departmental officers
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,aying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for 10 cum.
Rough stone dry packing for appron and revetment using new rough stones including stacking the same for premeasurement etc., complete complying with standard specifications and as directed by the departmental officers
Provision for Name board arrangements
Provision for Boundry Stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
3.Renovation of Basavayan Eri H/o Kannandahalli - Rs. 7.93 Lakhs
Clearing the Juliflora with uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank for formation of bund with a lead of 0-100m deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete including filling in layers of 15cm thick and watering consolidation using power rollers (8 - 10 tonnes) to achieve proper compaction test more than 95% complying with standard specification as directed by the departmental officers
Formation of fore shore bund by dumping the excess earth excavated soil after bund strengthening etc , complete
Supply Channel inlet and outlet
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank for formation of bund with a lead of 0-100m deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete including filling in layers of 15cm thick and watering consolidation using power rollers (8 - 10 tonnes) to achieve proper compaction test more than 95% complying with standard specification as directed by the departmental officers (Supply Channels inlet and outlet channels)
Repairs to Weir at Kattupatti eri
Earth work open excavation in all soils and sub soils to full depth as may be directed except hard rock requiring, blasting, but inclusive of shoring strutting and bailing out water were ever Necessary Etc Complete compling with standard specifications and as directed by the departmental officers
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,aying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Below ground level
above ground level
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for 10 cum.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Provision for Name board arrangements
Provision for Boundry Stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sakthi
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .