| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.4 LAccepted-AOC NO 99 A VILAPAKKAM ROAD ARUMBAKKAM VILLAGE MANNAVEDU POST TIRUVALLUR DISTRICT 602 021 | ARUMBAKKAM | TIRUVALLUR | TAMIL NADU | 602021 | ₹98.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹99.5 LRejected-AOC | ₹99.5 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/S. ABL CONSTRUCTIONS L1 | M/S KPJ CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.001.1.Formation of new bund with toe wall at south side of Kakkalur lake in Kakkalur Panchayat at Tiruvallur Block. | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.. | 50,400 | Cum | 6.35 ₹3.2 L | 6.5 ₹3.3 L |
| 3.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation W-0085 | 80,000 | Cum | 63.32 ₹50.7 L | 64 ₹51.2 L |
| 4.001.2.construction of toe wall | |||||
| 5.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 346.5 | Cum | 263.75 ₹91,389.38 | 270 ₹93,555 |
| 6.00 | C.C 1:4:8 Mix Using 40mm ISS HBG Metal including cost and conveyance and all materials and all labour charges etc,.Completed. | 63 | Cum | 5,912.5 ₹3.7 L | 5,980 ₹3.8 L |
| 7.00 | Cement Concrete 1:3:6 (One cement, Three sand, Six Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. | 318.94 | Cum | 6,182.5 ₹19.7 L | 6,200 ₹19.8 L |
| 8.00 | Supply and Errecting for Centering and shuttering for core wall sides including cost and conveyance and materials of labour charges etc,.complete. | 945 | Sqm | 547.4 ₹5.2 L | 570 ₹5.4 L |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 15,00,958.16 ₹15.0 L | 15,18,115.14 ₹15.2 L |
Tender Value
₹1 Cr
EMD Value
₹1 L
Closing Date
9 Mar 2026, 3:00 pmClosed
Project Director
DRDA, Tiruvallur
Formation of new bund with toe wall at south side of Kakalur Lake in Kakkalur panchayat at Tiruvallur Block Under Special Fund pack 02
2026_RDTN_670309_1
1621/2025/A2 Dt. 03.03.2026
Open Tender
Civil Works
90 days
Tiruvallur
as per eligible criteria
5 documents required · 5 mandatory
₹0
₹1 L
Yes
7 May 2026
4 Mar 2026
9 Mar 2026
4 Mar 2026
9 Mar 2026
4 Mar 2026
1.1.Formation of new bund with toe wall at south side of Kakkalur lake in Kakkalur Panchayat at Tiruvallur Block.
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp..
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation W-0085
1.2.construction of toe wall
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
C.C 1:4:8 Mix Using 40mm ISS HBG Metal including cost and conveyance and all materials and all labour charges etc,.Completed.
Cement Concrete 1:3:6 (One cement, Three sand, Six Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete.
Supply and Errecting for Centering and shuttering for core wall sides including cost and conveyance and materials of labour charges etc,.complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_805541.xls
BOQ • 0.28 MB
Pricbid02.pdf
Additional Documents • 0.39 MB
Techbid02.pdf
Tender Documents • 0.56 MB
Download all tender documents and submit your bid