| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.3 LAdmitted-Fee/PreQual/Technical/Finance | -21.00% | ₹11.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹11.9 L+₹63,519.57 (5.63%)Admitted-Fee/PreQual/Technical/Finance | -16.55% | ₹11.9 L+₹63,519.57 (5.63%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹12.2 L+₹87,642.73 (7.77%)Admitted-Fee/PreQual/Technical/Finance | -14.86% | ₹12.2 L+₹87,642.73 (7.77%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹12.6 L+₹1.4 L (12.0%)Admitted-Fee/PreQual/Technical/Finance | -11.51% | ₹12.6 L+₹1.4 L (12.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹12.7 L+₹1.4 L (12.8%)Admitted-Fee/PreQual/Technical/Finance | -10.85% | ₹12.7 L+₹1.4 L (12.8%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.3 L
EMD Value
₹28,548
Closing Date
15 Aug 2026, 6:00 pmClosed
OFFICE OF THE E.E. P.W.D. CITY DN. UDAIPUR
OFFICE OF THE E.E. P.W.D. CITY DN. UDAIPUR
CONSTRUCTION OF TRIBAL SHOW ROOM AT TRI ASHOK NAGAR UDAIPUR
2026_CEPWD_581507_8
NIT No 05/2026-27 EE PWD CITY DN UDAIPUR
Open Tender
Civil Works
Percentage
90 days
Udaipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
500 EE PWD CITY DN UDAIPUR 500 MDRISL JAIPUR
₹28,548
Yes
17 Aug 2026
6 Aug 2026
17 Aug 2026
6 Aug 2026
15 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge: In cement mortar | 15 | P.Cum | 641 | ₹9,615 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | 200 | P.Cum | 175 | ₹35,000 |
| 3 | Diluting and injection Chloropyrifos Emulsifiable concentrate 20% with 1% concentration for PRE-CONSTRUCTIONAL Anti termite treatment as per IS 6313 part III as amended from time to time and creating a continuous chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of wall and floor along the external perimeter of building expansion joints, over the top surface of consolidated earth of which aproch is to be laid surrounding of pipes and conduits etc. complete as per specification (Plinth floor area only shall be measured for payment and excluding the cost of chemical emulsion) . | 85 | P.Sqm | 47 | ₹3,995 |
| 4 | Random rubble dry stone Kharanja under floor. | 15 | P.Cum | 932 | ₹13,980 |
| 5 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. :-M15 grade Nominal Mix
1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). | 8 | P.Cum | 4,624 | ₹36,992 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. | 120 | P.Cum | 64 | ₹7,680 |
| 7 | Supplying and Filling in plinth with river sand under floors including watering ramming consolidating and dressing complete including cost of sand | 25 | P.Cum | 1,024 | ₹25,600 |
| 8 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 90 | P.Sqm | 157 | ₹14,130 |
| 9 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Columns, pillars, posts and struts etc. | 145 | P.Sqm | 375 | ₹54,375 |
| 10 | Providing and laying in position Ready mix concrete manufactured in fully automatic Batching Plant and transported to site in transit mixer for having continous agitated mixer, manufactured as per approved mix design of specified grade of RCC work including pumping of R.M.C. from transit mixer to site of laying , exculding the cost of centering, shuttering and reinforcement with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. All works upto floor V floor M20 grade Design Mix by using cement as per codal provision.:- Add extra for providing richer mixes respectively at all floor levels :- Providing M-25 grade concrete by using cement as per codal provision instead of M-20 grade design mix. | 43 | P.Cum | 6,158 | ₹2,64,794 |
stage.html
html • 0.03 MB
finance_1036016.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.08 MB
BOQ_1036016.xls
BOQ • 0.32 MB
NIT05CORRINGENDUM.pdf
PDF • 1.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .