Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
23 Mar 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/MEDC/Mettur
O/o SE/MEDC/Mettur
works for effecting agriculture services in various schemes in Chithoor section in Edappady division
2022_EB_225961_1
/EE/O and M/EDY/E 007/21-22/
Open Tender
Electrical Works
Works
365 days
Mettur Dam-1
EMD and documents as per BQR
2 documents required · 2 mandatory
₹0
₹5,000
24 Mar 2022
16 Mar 2022
24 Mar 2022
16 Mar 2022
23 Mar 2022
16 Mar 2022
16 Mar 2022 - 23 Mar 2022
120 days
Amount
Work contract schedule
Excavation of pole pit upto 27" (8.0 m ) Pole by using JCB or manual
Excavation of pole pit upto 30" RCC Pole / (9.0 m ) Pole by using JCB or manual
Excavation of stay pit 4.5' to 5' depth by using JCB or manual
Erection of PSC/RCC Pole upto 8.0m (27") by using crane or manual
Erection of PSC/RCC Pole upto 9.14m (30") by using crane or manual
Erection of Stay set complete
Fixing of HT V cross arms (all typs) / Channel cross arms / guarding Cross arm
Fixing of LT 3Ph cross arm
Fixing of LT 1Ph cross arm
Fixing of HT/LT TI Fittings
Fixing of HT Pin insulators 22KV
Fixing of HT Strain Disc 22KV
Fixing of LT Pin insulators
Fixing of LT Shackle
Fixing of Aluminium Knob
Paving and stringing of 7/4.09 mm ACSR
Paving and stringing of 7/3.35 mm ACSR, 7/3.30mm AAAC
Paving and stringing of 7/2.59 mm ACSR, 7/2.59mm ACSR
ERECTION of Double Pole TRANSFORMER STRUCTURE COMPLETE inclusive of following works - Excavation of pole pits sizing 2' X 2' X 6', erection of poles, erection of base plate, erection of structure materials , erection of AB switch and HG Fuse, Structure Earthing complete , Pole concreting (2'x2'6') for both base and sleeve including supply of jelly, sand and cement by the contractor , plinth erection with plastering ratio 1:2 including supply of cement and sand , Fixing of Open Type fuse units, HT/LT LAS fixing and LAS earthing through PVC Pipe 0.5" , Provision of bus-bar arrangement, Erection of Stay Set complete, Jumpering, erection of support angles and insulators if any , Alteration of materials in lathe works if any, provision of danger board, 3 Nos Earth pits including erection of cement collar , painting of metal parts, including loading, unloading, transportation of all required materials from stores to site , Road site to pit spot as per the directions by the TANGEDCO Site Engineer (This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P suchas crowbars, siling, DShackle etc., that must be brought by the contractor)
ERECTION of HVDS TRANSFORMER STRUCTURE COMPLETE inclusive of following works - Excavation of pole pits sizing 2' X 2' X 6', erection of poles, erection of base plate, erection of structure materials , erection of AB switch and HG Fuse, Structure Earthing complete , Pole concreting (2'x2'6') for both base and sleeve including supply of jelly, sand and cement by the contractor , plinth erection with plastering ratio 1:2 including supply of cement and sand , Fixing of Open Type fuse units, HT/LT LAS fixing and LAS earthing through PVC Pipe 0.5" , Provision of bus-bar arrangement, Erection of Stay Set complete, Jumpering, erection of support angles and insulators if any , Alteration of materials in lathe works if any, provision of danger board, 3 Nos Earth pits including erection of cement collar , painting of metal parts, including loading, unloading, transportation of all required materials from stores to site , Road site to pit spot as per the directions by the TANGEDCO Site Engineer (This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P suchas crowbars, siling, DShackle etc., that must be brought by the contractor)
Transport of Materials. Below 8 Kms.
Transportation of Poles from road side to pole Pit up to1.0 KM 7.5/8.0m (RCC &PSC Poles)
Transportation of Poles from road side to pole Pit up to1.0 KM 9.14m & 9.00 Mtr (RCC&PSC Poles)
Loading of poles upto 27'-0"
Loading of poles upto 30'
Unloading of poles upto 27'
Unloading of poles upto 30'/RSJ pole
Loading or unloading of line Material
Loading & unloading of Transformer upto 200 KVA for each
Erection of New Transformer upto 200 KVA
Dismandling of RCC/PSG pole 8.0mtr/7.5mtr
Dismandling of LT 3 phase X arm
Dismandling of LT single phase X arm
Dismandling of LT shackle
Dismandling of LT pin insulator
Dismandling of Aluminium knob
Dismandling of ACSR 7/3.35mm conductor
Dismandling of ACSR 7/2.59mm/ 7/2.11mm conductor
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @ 3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .