| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC | ₹6.6 L | L1 | Accepted-AOC BELOW |
| 2 | L2₹6.7 L+₹12,994 (1.98%)Rejected-AOC | ₹6.7 L+₹12,994 (1.98%) | L2 | Rejected-AOC ABOVE |
| Sl No | Description | Qty | Unit | B.SURESH BABU CONSTRUCTIONS L1 | SAKRAPANI RANGASWAMY RAVIKUMAR L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. For Drain | 14.04 | M3 | 165 ₹2,316.6 Lowest | 185 ₹2,597.4 |
| 2.00 | Cement Concrete M7.5 (1:4:8) (Design mix) using 40 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications | 6 | M3 | 5,110 ₹30,660 Lowest | 5,350 ₹32,100 |
| 3.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500,
Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel
reinforcement and G.I. binding wire, wastage etc. complete complying with standard
specification and as directed by the departmental officers.(Contractor has to make his
own arrangements for the supply of steel reinforcement and binding wire) | 2,500 | KG | 92.5 ₹2,31,250 Lowest | 95 ₹2,37,500 |
| 4.00 | Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for Culvert DECK SLAB | 38.64 | M3 | 10,120 ₹3,91,036.8 Lowest | 10,250 ₹3,96,060 |
Tender Value
₹7.9 L
EMD Value
₹7,900
Closing Date
5 Mar 2026, 3:00 pmClosed
COMMISSIONER
KARAMADAI
Ward Sabha Construction of Culvert at Ward No 08 Vadamangalakarai Pattatharasi Amman Temple in Karamadai Municipality
2026_MAWS_670620_1
4891/2025/E1
Open Tender
Construction Works
Works
KARAMADAI MUNICIPALITY
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹7,900
1 Sept 2026
5 Mar 2026
5 Mar 2026
5 Mar 2026
5 Mar 2026
5 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation for foundation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. For Drain | 14.04 | M3 | 1.25 | ₹17.55 |
| 2 | Cement Concrete M7.5 (1:4:8) (Design mix) using 40 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications | 6 | M3 | 2.25 | ₹13.5 |
| 3 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500,
Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel
reinforcement and G.I. binding wire, wastage etc. complete complying with standard
specification and as directed by the departmental officers.(Contractor has to make his
own arrangements for the supply of steel reinforcement and binding wire) | 2,500 | KG | 4.25 | ₹10,625 |
| 4 | Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for Culvert DECK SLAB | 38.64 | M3 | 5.25 | ₹202.86 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_805921.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .