Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance STATIONPALLY DANKUNI HOOGHLY PIN 712331 | DANKUNI | HOOGHLY | WEST BENGAL | 712331 | L1 | Admitted-Finance | ||
| 2 | L2₹3.1 L+₹12,408 (4.17%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.1 L+₹17,192 (5.78%)Admitted-Finance MAKARDAH ROAD DASNAGAR OPP UNITED CLUB HOWRAH 711105 | HOWRAH | HOWRAH | WEST BENGAL | 711105 | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
30 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE-X
28, P.A SHAH ROAD, KOL-33
CONSTRUCTION OF SEMI UNDER GROUND WATER TANK FOR CHHAT DEVOTEE BESIDE JHALDERMATH BUSTEE IN WARD NO-81, BR-X.
2026_KMC_1045075_1
X/081/005/2026-2027
Open Tender
CIVIL WORKS
Percentage
15 days
WARD-081
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,000
4 Nov 2026
8 Oct 2026
2 Nov 2026
8 Oct 2026
30 Oct 2026
8 Oct 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 0.89 | %M3 | 11,927 | ₹10,615.03 |
| 2 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. (B) Do - by fine sand | 0.14 | %M3 | 1,04,841 | ₹14,677.74 |
| 3 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018) | 94.32 | SQM | 361 | ₹34,049.52 |
| 4 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36...Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%. | 5.76 | SQM | 335 | ₹1,929.6 |
| 5 | ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018) | 9.07 | M3 | 5,672 | ₹51,427 |
| 6 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth. ( 3rd Corrigenda & addenda dated 04.06.2018) | 5.6 | M3 | 5,682 | ₹31,819.2 |
| 7 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (b) In superstructure, ground floor. ( 3rd Corrigenda & addenda dated 04.06.2018) | 6.2 | M3 | 5,905 | ₹36,611 |
| 8 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster(3rd Corrigenda & addenda dated 04.06.2018) | 149.86 | SQM | 194 | ₹29,072.84 |
| 9 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. | 149.86 | SQM | 34 | ₹5,095.24 |
| 10 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC. 1. Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) In ground floor including roof. | 11.88 | M3 | 447 | ₹5,310.36 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_2562403.xls
BOQ • 0.27 MB
civil_new.pdf
Additional Documents • 4.88 MB
TF.pdf
Tender Documents • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .