Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹3.0 L+₹555 (0.19%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹3.0 L+₹780 (0.26%)Admitted-Finance ARGORA GHATAL PASCHIM MEDINIPUR PIN 721212 | GHATAL | PASCHIM MEDINIPUR | WEST BENGAL | 721212 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KHAN ENTERPRISE L3 | SK SULTAN L2 | ESHITA CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00 | Brick Aggregate (single size):50 mm nominal size | 24.52 | cum | 1,500 ₹36,787.5 Lowest | 1,500 ₹36,787.5 Lowest | 1,500 ₹36,787.5 Lowest |
| 2.00 | Moorum | 5.85 | cum | 117 ₹684.45 Lowest | 117 ₹684.45 Lowest | 117 ₹684.45 Lowest |
| 3.00 | Carriage of Carriage of Moorum | 5.85 | cum | 623.3 ₹3,646.31 Lowest | 623.3 ₹3,646.31 Lowest | 623.3 ₹3,646.31 Lowest |
| 4.00 | Loading unloading & stacking lime, moorum, building rubish and similar miscellaneous material | 5.85 | cum | 62 ₹362.7 Lowest | 62 ₹362.7 Lowest | 62 ₹362.7 Lowest |
| 5.00 | Polythene sheet (150 gm per sqm) | 45 | kg | 110 ₹4,950 | 110 ₹4,950 | 106 ₹4,770 Lowest |
| 6.00 | Stone Aggregate(single size): 10 mm nominal size | 12.6 | cum | 1,633 ₹20,575.8 Lowest | 1,633 ₹20,575.8 Lowest | 1,633 ₹20,575.8 Lowest |
| 7.00 | Stone Aggregate(single size):20 mm nominal size | 25.65 | cum | 1,800 ₹46,170 Lowest | 1,800 ₹46,170 Lowest | 1,800 ₹46,170 Lowest |
| 8.00 | Portland Cement | 18.36 | tonne | 5,717 ₹1,04,964.12 Lowest | 5,717 ₹1,04,964.12 Lowest | 5,717 ₹1,04,964.12 Lowest |
| 9.00 | Carriage of Stone aggregate below 40 mm nominal size | 38.25 | cum | 623.3 ₹23,841.23 Lowest | 623.3 ₹23,841.23 Lowest | 623.3 ₹23,841.23 Lowest |
| 10.00 | Loading unloading & stacking Sand/ stone aggregate (less than 40mm nominal size) | 38.25 | cum | 77 ₹2,945.25 Lowest | 77 ₹2,945.25 Lowest | 77 ₹2,945.25 Lowest |
Tender Value
₹3.0 L
EMD Value
₹5,970
Closing Date
23 Sept 2026, 3:00 pmClosed
Pradhan
Tanua GP
Construction of Cement Concrete Roads for Community from PMGSY To Nirmalendu sahoo house Kuraria2
2026_ZPHD_5023369_1
NIT 2/3
Open Tender
CIVIL WORKS
Percentage
Kuraria-2
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
pradhan
₹5,970
Yes
2 Oct 2026
10 Sept 2026
25 Sept 2026
10 Sept 2026
23 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Brick Aggregate (single size):50 mm nominal size | 24.53 | cum | 1,500 | ₹36,787.5 |
| 2 | Moorum | 5.85 | cum | 117 | ₹684.45 |
| 3 | Carriage of Carriage of Moorum | 5.85 | cum | 623.3 | ₹3,646.3 |
| 4 | Loading unloading & stacking lime, moorum, building rubish and similar miscellaneous material | 5.85 | cum | 62 | ₹362.7 |
| 5 | Polythene sheet (150 gm per sqm) | 45 | kg | 110 | ₹4,950 |
| 6 | Stone Aggregate(single size): 10 mm nominal size | 12.6 | cum | 1,633 | ₹20,575.8 |
| 7 | Stone Aggregate(single size):20 mm nominal size | 25.65 | cum | 1,800 | ₹46,170 |
| 8 | Portland Cement | 18.36 | tonne | 5,717 | ₹1,04,964.12 |
| 9 | Carriage of Stone aggregate below 40 mm nominal size | 38.25 | cum | 623.3 | ₹23,841.23 |
| 10 | Loading unloading & stacking Sand/ stone aggregate (less than 40mm nominal size) | 38.25 | cum | 77 | ₹2,945.25 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
NIT.pdf
Tender Documents • 1.44 MB
BOQ_5106950.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .