| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹10.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹11.3 L+₹70,146.97 (6.61%)Admitted-Fee/PreQual/Technical/Finance 93 SOUTH ZONE COIMBATORE CORPORATION | TIRUPPUR | TAMIL NADU | 638459 | ₹11.3 L+₹70,146.97 (6.61%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹11.4 L+₹83,083.49 (7.83%)Admitted-Fee/PreQual/Technical/Finance | ₹11.4 L+₹83,083.49 (7.83%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | VADIVENDRA ASSOCIATES L3 | Skandha Constructions L1 | R KANNAN L2 |
|---|---|---|---|---|---|---|
| 1.00 | Hire charges for deploying earth moving machinery (JCB/Poclain) for earthwork including diesel, oil and labour charges etc., complete | 3 | Hours | 818 ₹2,454 | 762.84 ₹2,288.52 Lowest | 800 ₹2,400 |
| 2.00 | Providing and laying well gravel including cost and conveyance of all materials from approved quarries as noted in lead chart to the road site including loading, unloading and stacking the well gravel at road site to departmental gauge for pre-measurement including labour charges for laying spreading leveling to camper etc., complete as per specifications., | 7 | Cum | 330 ₹2,310 | 308 ₹2,156 | 300 ₹2,100 Lowest |
| 3.00 | Providing cast in situ cement concrete 1: 11/2 : 3 (one cement, one and half M.Sand and three coarse aggregate) using 20mm size HBBG metal for 23cm dia pile including cost of materials labour, hire charges for machinery for earth work for forming 23cm dia bore hole to the required depth before concreting excluding cost of steel reinforcement (Data for 4.50 RM) | 29 | Rmt | 2,283 ₹66,207 | 2,105.3 ₹61,053.7 Lowest | 2,200 ₹63,800 |
| 4.00 | Earth work excavation to all soils with initial lead and lift etc. complete | 4 | Cum | 122 ₹488 | 113.99 ₹455.96 | 100 ₹400 Lowest |
| 5.00 | Cement concrete 1:4:8 mix using 40mm size HBG metal from approved quarry etc. complete | 6 | Cum | 5,086 ₹30,516 | 4,690.04 ₹28,140.24 Lowest | 5,100 ₹30,600 |
| 6.00 | Centering with steel plates for sides & soffits etc. complete For Plinth Beam | 46 | Sqm | 988 ₹45,448 | 911.83 ₹41,944.18 | 900 ₹41,400 Lowest |
| 7.00 | Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as reinforced cement concrete slabs, walls etc., complete | 54 | Sqm | 445 ₹24,030 | 410.32 ₹22,157.28 Lowest | 450 ₹24,300 |
| 8.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one & half M.sand and three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 10 | Cum | 8,529 ₹85,290 | 7,863.98 ₹78,639.8 Lowest | 8,500 ₹85,000 |
| 9.00 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour charges for cutting, bending & tying etc., complying with standard specifications - 1 Quintal | 10 | Qtl | 8,482 ₹84,820 | 7,820.82 ₹78,208.2 Lowest | 8,500 ₹85,000 |
| 10.00 | Plain cement concrete 1:2:4 mix (One cement two M.Sand and four aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - 1 m3 (detailed data for 10 m3 ) | 2.03 | Cum | 6,266 ₹12,719.98 | 5,842.19 ₹11,859.65 Lowest | 6,200 ₹12,586 |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
1 Sept 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Additional class room and compound wall for Samy nagar ICDS center at Ward No 96, South Zone
2026_MAWS_694673_19
e53/2026-south single
Open Tender
Civil Works
Works
120 days
The Commissioner, Coimbatore Corporation
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹15,000
2 Sept 2026
17 Aug 2026
2 Sept 2026
17 Aug 2026
1 Sept 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hire charges for deploying earth moving machinery (JCB/Poclain) for earthwork including diesel, oil and labour charges etc., complete | 3 | Hours | - | - |
| 2 | Providing and laying well gravel including cost and conveyance of all materials from approved quarries as noted in lead chart to the road site including loading, unloading and stacking the well gravel at road site to departmental gauge for pre-measurement including labour charges for laying spreading leveling to camper etc., complete as per specifications., | 7 | Cum | - | - |
| 3 | Providing cast in situ cement concrete 1: 11/2 : 3 (one cement, one and half M.Sand and three coarse aggregate) using 20mm size HBBG metal for 23cm dia pile including cost of materials labour, hire charges for machinery for earth work for forming 23cm dia bore hole to the required depth before concreting excluding cost of steel reinforcement (Data for 4.50 RM) | 29 | Rmt | - | - |
| 4 | Earth work excavation to all soils with initial lead and lift etc. complete | 4 | Cum | - | - |
| 5 | Cement concrete 1:4:8 mix using 40mm size HBG metal from approved quarry etc. complete | 6 | Cum | - | - |
| 6 | Centering with steel plates for sides & soffits etc. complete For Plinth Beam | 46 | Sqm | - | - |
| 7 | Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as reinforced cement concrete slabs, walls etc., complete | 54 | Sqm | - | - |
| 8 | Reinforced Cement concrete 1:1.5 :3 (one cement, one & half M.sand and three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 10 | Cum | - | - |
| 9 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour charges for cutting, bending & tying etc., complying with standard specifications - 1 Quintal | 10 | Qtl | - | - |
| 10 | Plain cement concrete 1:2:4 mix (One cement two M.Sand and four aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - 1 m3 (detailed data for 10 m3 ) | 2.03 | Cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
ITB.pdf
Additional Documents • 0.19 MB
SingleDocument.pdf
Tender Documents • 0.59 MB
BOQ_835221.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .