| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAdmitted-Finance | ₹2.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 Cr+₹7.1 L (2.95%)Admitted-Finance | ₹2.5 Cr+₹7.1 L (2.95%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | Ms R.K. Mahajan L1 | SANJEEV SHARMA L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetera in all type of classification of soil, comprising of ordinary soil, ordinary rock, hard rock chiseling / wedging out rocks (where blasting is prohibited) as per drawings and MORD technical specification clause 305 and 1603 and as per the directions of the Engineer-in-Charge including setting out, shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto all lead and upto all lift including dressing of sides and bottom and back filling in trenches with excavated suitable / approved materials to the original surface in layers not exceeding 150 mm (one hundred fifty millimeters) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per directions of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rate is including the octoroi, royalty, Malkana, toll tax, sales tax, GST or any other taxes imposed by the Government. | 7,437.4 | Per Cubic Metre | - | - |
| 2.00 | Providing and Laying mechanically mixed and vibrated plain cement concrete in open foundation for all type of structure complete of plain concrete nominal mix 1:4:8 (one cement isto four sand isto eight graded) crushed stone aggregate 40 mm (Forty millimetre) nominal size in or under water and curing complete including pumping or bailing out water, dewatering, removal of slush as required at site which may arrise at the time of laying concretunder water complete for all height / depth including the cost of form work complete in all respect as per the drawing and MORD technical specifications Section 800, 900 ,1200 and 1604 and as per direction of Engineer-in-Charge including carriage of material within all leads and lifts and other incidental. The rates is inclusive of the octori, royality, Malkana, toll tax, sale tax , GST or other taxes imposed by the Government. | 99.75 | Per Cubic Metre | - | - |
| 3.00 | Providing and laying mechanically mixed and vibrated reinforced cement concrete design mix having cement contents not less than 350kg (three hundred fifty kilogram) per cubic metre to obtain the minimum compressive strength of grade M-20 (Twenty) in sub structure as per drawing and MORD technical specification clause/section 800, 900 and 1200 including the cost of form work but excluding the cost of reinforcement for reinforced concrete work in retaining wall counterfort up to any height including the cost of curing complete, and hauling of material in all kinds of leads,lifts as per the entire satisfaction and directions of Engineer-in-charge.The rate is including of octroi, royality ,Malkana, toll tax, GST or any other taxes imposed by the Government. | 1,533.53 | Per Cubic Metre | - | - |
| 4.00 | Providing HYSD bar reinforcement in sub-structure complete as per drawing and MORD technical specifications Section 1000 and 1200 including cutting ,bending ,binding and placing in position complete in all respect including cost of binding wire and carriage of materials within all leads and lifts and other incidentals. The rate is including the octroi, royalty, Malkana, toll tax, sales tax, GST or any other taxes imposed by the Government. | 107.57 | Per Tonne | - | - |
| 5.00 | Providing and laying weep hole in brick masonry/stone masonry, plain/reinforced concrete abutments, wing walls return walls and retaining /breast walls etc with 100 mm (One hundred millimeter) diameter AC pipe extending through the full width of the structure with slope of 1 (V) : 20 (H) (one vertical is to twenty horizontal ) towards drawing face complete as per drawings and MORTH technical specifications clause 2706 or as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate is including octoroi, royalty, Malkana, toll tax, sales tax, GST or any other taxes imposed by the Government. | 281 | Each | - | - |
| 6.00 | Back filling with granular material behind abutments, return walls, wing walls and retaining walls complete as per drawings and MORD technical specification clause 1203 and 1604 or as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate is including octoroi, royalty, Malkana, toll tax, sales tax, GST or any other taxes imposed by the Government. | 724.5 | Per Cubic Metre | - | - |
| 7.00 | Planting rooted slips of large stature grasses on slopes, including supplying clumps of appropriate grasses, splitting into slips, trimming roots, preparing lines, digging planting hole to a max of 5 cm (Five centimetre ) depth with metal rod or wooden peg depending on nature of soil, planting slips at the rate of three per drill at the spacing specified, and subsequent watering (if necessary) On fill slopes of 15 to 34° and cut slopes upto 45°; drills at 10 cm spacing within the row and rows spaced at 0.5 m intervals and as per the directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidental.The rate is inclusive of octroi, royality ,Malkana, toll tax , GST or any other taxes imposed by the Government. | 600 | Per Square meter | - | - |
Tender Value
₹2.1 Cr
EMD Value
₹2.4 L
Closing Date
21 Oct 2020, 3:00 pmClosed
Executive Engineer HPPWD Division Dalhousie
Executive Engineer HPPWD Division Dalhousie
Protection of Toe of Kalighar land slide prone area at RD 49/045 to 49/150
2020_PWD_41377_2
TA-Tender-2020-21- 10717-10766 dated 21-09-2020
Open Tender
Civil Works
Item Rate
365 days
Dalhousie
Please refer Tender documents.
12 documents required · 12 mandatory
₹5,000
EE Dalhousie
₹2.4 L
5 Nov 2020
16 Oct 2020
21 Oct 2020
16 Oct 2020
21 Oct 2020
16 Oct 2020
16 Oct 2020 - 19 Oct 2020
Amount
Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetera in all type of classification of soil, comprising of ordinary soil, ordinary rock, hard rock chiseling / wedging out rocks (where blasting is prohibited) as per drawings and MORD technical specification clause 305 and 1603 and as per the directions of the Engineer-in-Charge including setting out, shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto all lead and upto all lift including dressing of sides and bottom and back filling in trenches with excavated suitable / approved materials to the original surface in layers not exceeding 150 mm (one hundred fifty millimeters) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per directions of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rate is including the octoroi, royalty, Malkana, toll tax, sales tax, GST or any other taxes imposed by the Government.
Providing and Laying mechanically mixed and vibrated plain cement concrete in open foundation for all type of structure complete of plain concrete nominal mix 1:4:8 (one cement isto four sand isto eight graded) crushed stone aggregate 40 mm (Forty millimetre) nominal size in or under water and curing complete including pumping or bailing out water, dewatering, removal of slush as required at site which may arrise at the time of laying concretunder water complete for all height / depth including the cost of form work complete in all respect as per the drawing and MORD technical specifications Section 800, 900 ,1200 and 1604 and as per direction of Engineer-in-Charge including carriage of material within all leads and lifts and other incidental. The rates is inclusive of the octori, royality, Malkana, toll tax, sale tax , GST or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated reinforced cement concrete design mix having cement contents not less than 350kg (three hundred fifty kilogram) per cubic metre to obtain the minimum compressive strength of grade M-20 (Twenty) in sub structure as per drawing and MORD technical specification clause/section 800, 900 and 1200 including the cost of form work but excluding the cost of reinforcement for reinforced concrete work in retaining wall counterfort up to any height including the cost of curing complete, and hauling of material in all kinds of leads,lifts as per the entire satisfaction and directions of Engineer-in-charge.The rate is including of octroi, royality ,Malkana, toll tax, GST or any other taxes imposed by the Government.
Providing HYSD bar reinforcement in sub-structure complete as per drawing and MORD technical specifications Section 1000 and 1200 including cutting ,bending ,binding and placing in position complete in all respect including cost of binding wire and carriage of materials within all leads and lifts and other incidentals. The rate is including the octroi, royalty, Malkana, toll tax, sales tax, GST or any other taxes imposed by the Government.
Providing and laying weep hole in brick masonry/stone masonry, plain/reinforced concrete abutments, wing walls return walls and retaining /breast walls etc with 100 mm (One hundred millimeter) diameter AC pipe extending through the full width of the structure with slope of 1 (V) : 20 (H) (one vertical is to twenty horizontal ) towards drawing face complete as per drawings and MORTH technical specifications clause 2706 or as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate is including octoroi, royalty, Malkana, toll tax, sales tax, GST or any other taxes imposed by the Government.
Back filling with granular material behind abutments, return walls, wing walls and retaining walls complete as per drawings and MORD technical specification clause 1203 and 1604 or as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate is including octoroi, royalty, Malkana, toll tax, sales tax, GST or any other taxes imposed by the Government.
Planting rooted slips of large stature grasses on slopes, including supplying clumps of appropriate grasses, splitting into slips, trimming roots, preparing lines, digging planting hole to a max of 5 cm (Five centimetre ) depth with metal rod or wooden peg depending on nature of soil, planting slips at the rate of three per drill at the spacing specified, and subsequent watering (if necessary) On fill slopes of 15 to 34° and cut slopes upto 45°; drills at 10 cm spacing within the row and rows spaced at 0.5 m intervals and as per the directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidental.The rate is inclusive of octroi, royality ,Malkana, toll tax , GST or any other taxes imposed by the Government.
SANJEEV SHARMA
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Biddingdocument.pdf
Tender Documents • 5.85 MB
BOQ_61564.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .