| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC C141 SUN CITY SECTOR 35 ROHTAK 124001 | ROHTAK | HARYANA | 124001 | ₹1.8 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.9 Cr+₹7.5 L (4.21%)Rejected-AOC NA | ₹1.9 Cr+₹7.5 L (4.21%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹1.9 Cr+₹8.6 L (4.82%)Rejected-AOC SCT 3 H NO 2030 ROHTAK SCT 3 H NO 2030 ROHTAK 124001 | ROHTAK | HARYANA | 124001 | ₹1.9 Cr+₹8.6 L (4.82%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹1.9 Cr+₹12.8 L (7.14%)Rejected-AOC 464 21 NEW ANAJ MANDI TOHANA 125120 | FATEHABAD | HARYANA | 125120 | ₹1.9 Cr+₹12.8 L (7.14%) | L4 | Rejected-AOC Rejected |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
22 Jul 2021, 6:55 pmClosed
EE PHED No.1 Rohtak
Jhajjar Road Rohtak
Recall Khidwali Aug of water supply scheme Providing Functional Household Tap Connection and laying the balance pipe line in village Khidwali Design Construction Testing and commissioning of 1 MLD capacity water treatment plant Construction of sump w
2021_HRY_179993_1
DNIT Approved vide SE Endst No.1560 dt. 06.07.2021
Open Tender
Civil Works
Works
540 days
VPO Khidwali
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹3.4 L
Yes
12 Aug 2021
15 Jul 2021
23 Jul 2021
15 Jul 2021
22 Jul 2021
15 Jul 2021
Amount
WATER TREATMENT PLANT (WTP) Desinging , construction, Testing & Commissioning of 1.00 MLD capacity water treatment plant including inlet channel, Alum dozing, Flash mixing, Clarifloculator, filter box, over head Reservoir for back wash, waste water tank, incluign all civil work pumping machineries and electric cabling, control panelsentire piping network of suitable size laying the DI pipes from raw water pump to inlet box of WTP, WTP to CWT & suctional valve, hodies manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of floe measurement and sand bed complete in all respects as per NIT (Sluice valve of make IVC/ VAG )
Raw water pumping machinery
Supply & Eraction of Horizontal spindle split casing type pumping sets of following duties directly coupled to AC squirrel cage induction type motor with accessories as described in Schedule No II complete in all respect with priming arrangement with complete base frame a) RAW WATER PUMPING STATION
3600 LPM X 30 M. Head
Water Works
1800 LPM X 12 Mtr Head
Panel Board for Motors Supply, erection, testing and commissioning of wall mounted electrical LT panel board, fabricated from 16 SWG CRCA sheet duly stouted with suitable angle iron frame work and completely powder coated of approximate size 1200x900mm and 400mm deep having following item:-
For 2 Nos. pumping sest of 3600 LPM x 30 M. Head A) Main switch 10 Amp 1 No. (L&T siemens, ABB). B) CT 100/3 = 3 Nos. (AE/KAPPA/L&T) C) Digital Multi function meter= 1 No. D) SSP = 1 No. of approved make E) Motor starter star delta 1 Nos. for 3600 LPM x 30 m Head = 2 Nos. (L&T, Siemens, ABB) f ) VSS 1 No. & ASS 3 Nos. of approved make. g) Capacitor KVAR as per site requirement = 1No. h) Indicating Lamp = One Set i) Change over Switch of suitable Amp. = 1 No.(each)
For 2 Nos. pump set of 1800 LPM x 12 M. Head A Main switch 63 Amp = 2 Nos. (L&T siemens, ABB). B CT 100/3 = 2 Nos. (AE/KAPPA/L&T) C Digital Multi function meter= 1 No. D SSP = 1 No. of approved make E Motor starter star delta 1 Nos. for 1800 LPM x 12 m Head = 2 Nos. (L&T, Siemens, ABB) f ) VSS 1 No. & ASS 2 Nos. of approved make. g) Capacitor KVAR as per site requirement = 1No. h) Indicating Lamp = One Set i) Change over Switch of suitable Amp. = 1 No.(each)
At water works for Clear water: For 2 Nos. pumping set of 1800 LPM x 45 M. Head A Main switch 63 Amp = 2 Nos. (L&T siemens, ABB). B CT 100/3 = 2 Nos. (AE/KAPPA/L&T) C Digital Multi function meter= 1 No. D SSP = 1 No. of approved make E Motor starter star delta for 1800 LPM x 12 m Head = 2 Nos. (L&T, Siemens, ABB) f ) VSS 1 No. & ASS 2 Nos. of approved make. g) Capacitor KVAR as per site requirement = 1No. h) Indicating Lamp = One Set i) Change over Switch of suitable Amp. = 1 No.(each)
At Boosting station: For 2 Nos. pumping set of 800 LPM x 45 M. Head A Main switch 63 Amp 2 Nos. (L&T siemens, ABB). B CT 100/3 = 2 Nos. (AE/KAPPA/L&T) C Digital Multi function meter= 1 No. D SSP = 1 No. of approved make E Motor starter star delta for 800 LPM x 12 m Head = 2 Nos. (L&T, Siemens, ABB) f ) VSS 1 No. & ASS 2 Nos. of approved make. g) Capacitor KVAR as per site requirement = 1No. h) Indicating Lamp = One Set J Change over Switch of suitable Amp. = 1 No.(each)
Supply, erection, testing and commissioning of IS marked copper wire for various motors with underground system in PVC and fixible pipes copper wire 3 core complete in all respect with accessories like thimble etc.
10mm2 3core
25mm2 3core
Operation & Maintenance Operation and maintenance for complete scope of work mention in the DNIT ( Disinfection material supplied by the PHED) as per Schedule-IV during defect liablity period of 12 months after trail run period of 3 months & 5 years thereafter. (Will be charged to A/Mtc estimate)
Defect liability period (Operation only)
Operation and maintenance during 1st year
Operation and maintenance during 2nd year
Operation and maintenance during 3rd year
Operation and maintenance during 4th year
Operation and maintenance during 5th year
Bidder Name
Amount
Surinder Singh Hooda(GSTN-06AABPH9599L2Z1)
Lalit Kumar(GSTN-06ALGPB5309Q1ZY)
Sunil Kumar(GSTN-06BMGPK6616K1ZU)
Sh. Ashok Kumar Sindhu(GSTN-NA)
Surinder Singh Hooda
Sh. Ashok Kumar Sindhu
Sunil Kumar
Sh. Ashok Kumar Sindhu
Sunil Kumar
Surinder Singh Hooda
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .