Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹85.7 LAccepted-AOC NO 1108 2A SEVUKAMPATTI VILLAGE MADURAI MAIN ROAD DINDIGUL 624211 | DINDIGUL | TAMIL NADU | 624211 | ₹85.7 L Quoted ₹86.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹92.4 LRejected-AOC 17 NETHAJI ROAD MADURAI 625001 | MADURAI | TAMIL NADU | 625001 | ₹92.4 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S S CONSTRUCTIONS L1 | SHRI PRAKASH INFRA L2 |
|---|---|---|---|---|---|
| 1.00Construction of 2 Nos of Bus shelter | |||||
| 1.01 | Earth work excavation for cutting work in all class of soils such as hard stiff clay, stuff black, cotton soil, etc., as per SS20-B (HGS SS.20B) and depositing the same to the road side etc., Complete complying with standard specification and as directed by SIPCOT officials | 34 | Cum | 205.6 ₹6,990.40 | 220 ₹7,480 |
| 1.02 | Supplying and filling of Quarry dust to a thickness of 100 mm including cost and conveyance of sand to work site including labour charges for spreading etc., complete for bottom of culvert as per standard specification and as directed by SIPCOT Officials. | 24 | Cum | 271.29 ₹6,510.96 | 290 ₹6,960 |
| 1.03 | Providing Plain Cement Concrete 1:4:8 (One cement, four sand and eight hard broken stone Jelly) using 40mm size Hard broken granite stone jelly for foundation concrete etc. laid in layers not exceeding 15cm thick including dewatering wherever necessary well rammed, consolidated etc. complete complying including cost and conveyance of all materials and labour to work site, mixing, laying, compacting, curing with all leads of soft potable water with standard specifications and as directed by SIPCOT Officers.. (in all heights and all depths). | 9 | Cum | 5,162.88 ₹46,465.92 | 5,525 ₹49,725 |
| 1.04 | Collection and supply of gravel including cost and conveyance oa al material and labour charges for filling etc., Complete complying with standard specification and as directed by SIPCOT offilicials | 12.5 | Cum | 268.3 ₹3,353.75 | 287 ₹3,587.50 |
| 1.05 | Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by SIPCOT Officers.
In Foundation and Basement | 6 | Cum | 8,964.58 ₹53,787.48 | 9,592 ₹57,552 |
| 1.06 | Brick work in Cement Mortar 1:5 (One cement and Five M sand) using best quality of IIIrd class country bricks of size 83/4" x 41/4" x 23/4" for foundation and basement including curing, etc., complete complying with standard specification and as directed by SIPCOT Officers. | 8 | Cum | 6,834.25 ₹54,674 | 7,313 ₹58,504 |
| 1.07 | Brick work in Cement Mortar 1:6 (One cement and Six M sand) using best quality of IIIrd class country bricks of size 83/4" x 41/4" x 23/4" for ground floor including curing, etc., complete complying with standard specification and as directed by SIPCOT Officers. | 4 | Cum | 6,847.63 ₹27,390.52 | 7,327 ₹29,308 |
| 1.08Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton and as directed by SIPCOT officers. (Payment for centering shall be given after the concrete is laid) | |||||
| 1.09 | Below Plinth Surface
For Column footing, Grade beam & Plinth beam etc., | 100 | Sqm | 929.15 ₹92,915 | 994 ₹99,400 |
Tender Value
₹86.5 L
EMD Value
₹53,500
Closing Date
18 Sept 2025, 3:30 pmClosed
SUPERINTENDING ENGINEER
SIPCOT Head office egmore chennai
Construction of Bus shelters at Km 399/450 of Dindigul to Madurai (NH 44) at SIPCOT Industrial Park, Nilakottai
2025_SIPCT_599796_1
NIT.No.21/CD/T.No.21/2025-26
Open Tender
Civil Works
SIPCOT Industrial Park Nilakottai
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹53,500
24 Mar 2026
2 Sept 2025
19 Sept 2025
2 Sept 2025
18 Sept 2025
11 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid