| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹25.3 L+₹2.0 L (8.82%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹25.7 L+₹2.5 L (10.7%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹27.3 L+₹4.0 L (17.3%)Rejected-Finance | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹87,200
Closing Date
28 Dec 2023, 6:00 pmClosed
CWE PATIALA
HQ COMMANDER WORKS ENGINEER BLDG No 26 NEW LALBAGH PATIALA 147001 Contact 01712200082
SPECIAL REPAIR TO CERTAIN ROADS AT MIL STN DAPPAR
2023_MES_628121_1
CWE/PAT/T-46/2023-24
Open Tender
Civil Works - Roads
Item Rate
150 days
DAPPAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
AGE(I) DAPPAR
₹87,200
26 Feb 2024
13 Nov 2023
30 Dec 2023
13 Nov 2023
28 Dec 2023
14 Dec 2023
13 Nov 2023 - 13 Dec 2023
Amount
Material & Labour for repair to pot holes any depth not exc 1.00 Sqm each including sweeping free from dust and mud or water. Scoring sunken surfaces in road, cutting around edges to at least 25mm in depth, making good by by filling in screened and graded road metal, watering and well ramming (including supply of road metal) complete all as specified and as directed..
Scarifying or picking gravelled macadam or bitumenous macadam road surfaces (exceeding 50mm but not exccding 100mm deep) in area not exceeding 400 Sqm including removal of gravel from site ) complete all as specified and as directed..
Material & Labour for 75mm thick compacted thickness water bound macadam with coarse aggregate using sand stone of grading (63 to 40mm size) aggregate grading 3 (50 to 20mm size) aggregate of granite/basalt watered and rolled with 8 to 12 tonne power roller and consoildated to gradient and required camber granite,trap or basalt complete all as specified. complete all as specified and as directed.
Applying evenly a prime coat of Cationic bitumen Emulsion SS1 confirming to IS : 8887 at a rate of application of 0.7-1 kg/sqm on surface of WMM/VVBM as specified in Table 500-3 of MoRTH specification for road and bridge works 2013, using mechanical sprayer tack preparing surface of WBM surface top brushing with wire brush removing cake mud etc, sweeping with broom and finally paving with gunny bags complete all as specified and directed.
Providing, laying and compaction of Bituminous Macadam (BM) 25mm to 50mm thickness compacted thickness conforming to clause 504 of MORTH Specifications for Road and Bridge Works (Fifth Revision), using mechanically crushed stone aggregates and granual material etc. of grading II as per Table 500-7 of MORTH specifications for Road and Bridge Works (Fifth Revision), premixed with bituminous binder, Bitumen grade VG-30 @ 4.0% (percentage by weight of total mix) prepared in Batch Type Hot Mix Plant of 100 - 120 TPH capacity transported to site by tippers, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density complete all as specified and as directed. Note : (i) The contractor shall quote the rate against item considering 3.5% VG-30 bitumen content. Mix Design for bituminous macadam shall be got designed from NIT / CTL / Govt Engg College and shall be got approved from GE in writing well before commencement of work without any financial effect to the department. Also the bitumen content shall not be less than 4.0% by weight of total mix as per clause 504.2.4 of MORTH specifications (Fifth Revision). (ii) If qty of binder contents is less than the qty as specified in respective items of BOQ, it shall be adjusted at supply only rates of paving bitumen @ Rs. 45.00 Per Kg and if qty of binder contents is more than the qty as specified in respective items of BOQ no adjustment shall be made.
Providing and laying 30 mm thick (consolidated thickness) Bituminous Concrete (BC) layer conforming to clause 507 of MORTH specifications for road and bridge work (Fifth Revision) including cost of coarse aggregates, fine aggregates, filler, 5.5% binder (paving bitumen grade VG-30) content by weight of total mix and crushed aggregates of grading 2, Anti Stripping Agent, Warm Mix Additives (quantity, quality and grade as per the approved Job Mix Formula) etc, cleaning and pre-heating of the mineralaggregate, filler and bitumen to the specific temperature, thoroughly mixing with binder of specified bitumen content, Anti Stripping Agent, Warm Mix Additives as per mix design in Hot Mix Plant (Batch Type) of 100 - 120 TPH capacity, carrying the hot mixed materials by means of tipper, trucks, or any other approved and suitable arrangements, laying the hot premixed materials over the prepared surface by means of mechanical paver finisher including manual operation as and when required for proper grade, level and camber thorough rolling with power roller 8 to 12 tonnes smooth wheeled, vibratory and tandem roller with necessary hand packing and pinning to give an even surface including running expense of all plants and machineries, inclusive of proper traffic control during laying to the satisfaction of Engineer in Charge, required quality control tests at required interval etc complete all as specified and as directed.
Note : (i) The contractor shall quote the rate against items considering 5.5% VG-30 bitumen content. Job mix formula as per clause No 505.3.3 of MORTH Specifications for Road and Bridge work (Fifth Revision) for bituminous concrete shall be got designed from NIT / CTL / Govt Engg College and shall be got approved from GE in writing well before commencement of work without any financial effect to the department. Also the bitumen content shall not be less than 5.4% by weight of total mix as per clause 507.2.5 of MORTH specifications (Fifth Revision). (ii) The cost of materials, transportation, Job Mis Formula from lab and testing charges for various tests as required are included in the unit rate quoted by the contractor. (iii) Cost of filler i.e rock dust, hydrated lime or cement is deemed to be included in unit rate. (iv) If qty of binder contents is less than the qty as specified in respective items of BOQ, it shall be adjusted at supply only rates of paving bitumen @ Rs. 45.00 Per Kg and if qty of binder contents is more than the qty as specified in respective items of BOQ no adjustment shall be made. (v) After spreading of mix as per clause 507.4.7 of MORTH Specifications entire surface during the operation shall be rolled with road roller 8 - 10 tonnes (Smooth Wheeled) followed with vibratory road roller of 8 - 10 tonnes static weight, followed by finish rolling with 6 to 8 tonnes smooth sheeped tandem roller as per clause No 507.4.8 of MORTH Specifications (Fifth Revision) and the cost of the same shall be deemed to be included in the quoted rate.
Material & Labour for applying chemical with spray pump to remove all grass , scrubs or other vegetation with roots etc from existing road surface complete all as specified and as directed by Engr-in-Charge.
BAL SINGH AND SONS
shree balaji builders
M/s DATAAR BUILDERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .