Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
31 Jul 2026, 3:00 pm5d left
Chief Engineer
A.D.A., Jaipur House, Agra
Construction of a cement concrete (CC) road for Punit Vihar Extension, situated between Shekhar Residency and Banshi Vihar in Pashchim Puri.
2026_ADAA_1171032_12
10/2026-27
Open Tender
Civil Works
Lump-sum
120 days
Agra Development Authority
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Secretary
₹1.7 L
21 Jul 2026
21 Jul 2026
1 Aug 2026
21 Jul 2026
31 Jul 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART - A (DRAIN) :- Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil. (DSR-2023/2.6.1) | 226 | Cum | 135.34 | ₹30,586.84 |
| 2 | Providing and laying in posotion cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 ( 1 cement : 4 coarse sand {zone-III} : 10 graded stone aggregate 40mm nominal size) (DSR 2023/4.1.8) | 45 | Cum | 5,193.99 | ₹2,33,729.55 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) in Raft (DSR 2023/5.1.2) | 40 | Cum | 6,897.17 | ₹2,75,886.8 |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls ( anythickness ) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:1½:3 (1 Cement: 1½coarse sand {zone-III} : 3 graded stone aggregate 20mm nominal size). (DSR 2023/5.2.2) | 50 | Cum | 8,275.12 | ₹4,13,756 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). (DSR 2023/5.3) | 2 | Cum | 8,772.67 | ₹17,545.34 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.1 Mild steel and Medium Tensile steel bars DSR2023 | 7,222 | Kg | 81.66 | ₹5,89,748.52 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. (DSR 2023/5.9.2) | 1,302 | Sqm | 642.38 | ₹8,36,378.76 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform (DSR 2023/5.9.3) | 13 | Sqm | 707 | ₹9,191 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for 5.9.1 Foundations, footings, bases of columns, etc. for mass concrete 5.9.1 DSR2023 | 80 | Sqm | 299 | ₹23,920 |
| 10 | PART - B (ROAD) :- Earth work in cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the Engineer-in-Charge. Cartage up to 8kms (Presanctioned Rate) | 720 | Cum | 282.22 | ₹2,03,198.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
TENDERDOC.pdf
Tender Documents • 3.37 MB
BOQ_2198605.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].