Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.3 Cr
EMD Value
₹77,000
Closing Date
31 Aug 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Special Chief Engineer
The Superintending Engineer, PWD., Buildings Construction and Maintenance Circle,Tiruvannamalai-4.
CONSTRUCTION OF SUB REGISTRAR OFFICE BUILDING AT ARANI IN TIRUVANNAMALAI DISTRICT.
2023_PWD_360022_1
16/TVM-CLE/23-24/1/ DT.07.08.2023
Open Tender
Civil Works - Buildings
Lump-sum
210 days
ARANI
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹77,000
1 Nov 2023
19 Aug 2023
31 Aug 2023
19 Aug 2023
31 Aug 2023
19 Aug 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling, Clearing away and carefully stacking materials for Dismantling RCC works etc., complete complying with standard specifications and as directed by the departmental officers | 12.29 | Cu.m | - | - |
| 2 | Dismantling, Clearing away and carefully stacking materials useful for re-use for Brick / stone masonry in lime mortar walls under 3m high etc., complete complying with standard specifications and as directed by the departmental officers | 80.1 | Cu.m | - | - |
| 3 | Clearing the debries of unwanted materials one site to outside the campus with in a lead to 0 to 5 km including loading charges etc., complete complying with standard specification and as directed by the departmental officers. | 92.39 | Cu.m | - | - |
| 4 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 365 | Cu.m | - | - |
| 5 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. | 70 | Cu.m | - | - |
| 6 | Supplying and filling in foundation, basement, etc with filling Crushed Stone Sand (M-Sand) and in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 40 | Cu.m | - | - |
| 7 | Supplying and filling of Gravel by lorry in basement filling including stacking for premeasurement, conveyance, loading and unloading charges and all other incidental charges and including filling laying watering and consolidating etc., complete as directed by the department officers and complying with standard specifications | 92 | Cu.m | - | - |
| 8 | Providing and laying M.sand gravel mix as per mixed to a consolidated thickness of 100mm, using 0.67 cm of M.sand and 0.69 cm of gravel for every cum consolidated M.sand gravel mix to give a soaked CBR valve of minimum 20 including cost and conveyance of M.sand and gravel from approved sources to work site and premeasurement including labour charges for mixing the required quantities of M.sand and gravel to the proportion and consistency using soft portable water to keep up optium moisture content over day and night mixing well on the next morning water sprinkler and laying watering including all leads spreading the mix in layers not less than 10cm and not more than 15 cm watering and consolidating including labour charges for mixing spreading and hire charges fuel charges and running charges for power rollers, water sprinkles and all other tools and plants etc. complete complying with standard specifications. | 307 | Cu.m | - | - |
| 9 | Cement Concrete 1:5:10 (One Cement, Five M-sand and Ten Hard Broken Stone Jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 36 | Cu.m | - | - |
| 10 | Cement Concrete 1:5:10 (One Cement, Five M-sand and Ten Hard Broken Stone Jelly) using 40 mm gauge hard broken granite stone jelly for flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 33.5 | Cu.m | - | - |
stage.html
html • 0.03 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
Tender Document • 1.62 MB
ConditionsArani.pdf
Tender Document • 0.94 MB
DocumentsArani.pdf
Tender Document • 0.18 MB
BOQ_430456.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .