| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.7 LAccepted-AOC SIKONA CHANDIPUR BALASORE ORISSA 756025 | BALESHWAR | ODISHA | 756025 | ₹44.7 L | L1 | Accepted-AOC Being lowest bid value |
| 2 | L2₹48.7 LRejected-Finance AT PO CHANDIPUR BALASORE 756025 | BALASORE | BALASORE | ODISHA | 756025 | ₹48.7 L | L2 | Rejected-Finance Being higher bid value |
| 3 | L3₹49.2 LRejected-Finance 47A C3 OLD DAMU NAGAR PULIAKULAM COIMBATORE 641 045 | COIMBATORE | COIMBATORE | TAMIL NADU | 641045 | ₹49.2 L | L3 | Rejected-Finance Being higher bid value |
| 4 | L4₹49.4 LRejected-Finance | ₹49.4 L | L4 | Rejected-Finance Being higher bid value |
| 5 | L5₹50.9 LRejected-Finance FLAT NO B 309 SAI RESIDENCY TCI CHOWK GOPOPALI SUNDERGARH ROURKELA ODISHA 769 004 | ROURKELA | SUNDERGARH | ODISHA | 769004 | ₹50.9 L | L5 | Rejected-Finance Being higher bid value |
| Sl No | Description | Qty | Unit | M/s UMAMANI CONSTRUCTIONS L5 | M/S T.N.CONSTRUCTION L8 | KRISHNA ENTERPRISES L3 | J B NATH AND SON L7 | RANA ENTERPRISES L1 | DS ENTERPRISES L2 | M/s D.K Mukherjee & Co L6 | vaishnaveedevienterprises L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning of sweage line of any dia of bore of pipe and drain by rodding or split bamboo etc including flushing with water complete all as specified and directed by Eng-in-Charge. | 250 | 10 RM | 20 ₹5,000 | 20 ₹5,000 | 17.8 ₹4,450 | 21 ₹5,250 | 30 ₹7,500 | 20 ₹5,000 | 20.71 ₹5,177.50 | 22 ₹5,500 |
| 2.00 | Cleaning of blockage of wash hand basin, kitchen, bathroom floor trap, gutter and water closet etc complete all as specified and directed by Eng-in-Charge. | 300 | Each | 25 ₹7,500 | 25 ₹7,500 | 23.5 ₹7,050 | 27 ₹8,100 | 30 ₹9,000 | 30 ₹9,000 | 25.88 ₹7,764 | 25 ₹7,500 |
| 3.00 | Taking out deposited sludge from manholes, septic tanks etc any depth from top of manhole, septic tanks etc and pumping out sewage water including cutting of bushes and removing of sludge from bottom of manhole, septic tanks etc and removing to a distance 50 m and covering of the deposited sludge with excavated earth including spreading of bleaching powder @ 1.00 Kg/Sqm (for disinfection purpose) over deposited sludge before earth spreading including sweeping and cleaning with water complete all as specified and directed by Eng-in-Charge.Note- Volume of sludge will be measured for payment purposes.
(Note for Ser No 1 to 3 : Contractor shall provide sweeper and his helper to attend the day to day complaints on all working days). | 250 | Cum | 752 ₹1.9 L | 772 ₹1.9 L | 728 ₹1.8 L | 785 ₹2.0 L | 600 ₹1.5 L | 800 ₹2 L | 776.44 ₹1.9 L | 650 ₹1.6 L |
| 4.00 | Cleaning of the service tanks and from mouths of circulating pipes, etc. of capacity upto 500 liters twice (as directed) installed on roofs at 2nd, 3rd, or 4th stories of building at various places by emptying the tanks, by removing the scale and other all other foreign materials deposited on side wall and bottom of the tanks by scraping and brushing with wire brush and cleaning with bleaching powder slurry and allowed to dry and then washing and cleaning the tank with fresh water including refixing the top cover of tank properly after cleaning and writing letters such as details of the tanks like date of cleaning, capacity of tank with synthetic enamel paint with letter size 10cm high in black colour, over a thick of size 60x 30mm complete all as specified and directed by Eng-in-Charge. | 100 | Each | 200 ₹20,000 | 2,066 ₹2.1 L | 195 ₹19,500 | 210 ₹21,000 | 300 ₹30,000 | 200 ₹20,000 | 207.5 ₹20,750 | 200 ₹20,000 |
| 5.00 | Cleaning of the service tanks and from mouths of circulating pipes, etc. of capacity upto 1000 liters twice (as directed) installed on roofs at 2nd, 3rd, or 4th stories of building at various places by emptying the tanks, by removing the scale and other all other foreign materials deposited on side wall and bottom of the tanks by scraping and brushing with wire brush and cleaning with bleaching powder slurry and allowed to dry and then washing and cleaning the tank with fresh water including refixing the top cover of tank properly after cleaning and writing letters such as details of the tanks like date of cleaning, capacity of tank with synthetic enamel paint with letter size 10cm high in black colour, over a thick of size 60x 30mm complete all as specified and directed by Eng-in-Charge. | 150 | Each | 902 ₹1.4 L | 925 ₹1.4 L | 880 ₹1.3 L | 942 ₹1.4 L | 600 ₹90,000 | 900 ₹1.4 L | 931.73 ₹1.4 L | 890 ₹1.3 L |
| 6.00 | M&L for taking down existing WC/EWC of any description including PCC, tilling of sunken portion complete including preparation of surface to receive plastering and removal of debris outside complete all as specified and directed by Eng-in-Charge. | 30 | Sqm | 30 ₹900 | 30 ₹900 | 29 ₹870 | 32 ₹960 | 50 ₹1,500 | 30 ₹900 | 31.06 ₹931.80 | 30 ₹900 |
| 7.00 | M&L for providing cement concrete 1:5:10 in filling of sunken portion type E-2 (using 40 mm graded brick bats) complete all as specified and directed. | 13.5 | Cum | 9,028 ₹1.2 L | 9,252 ₹1.2 L | 8,800 ₹1.2 L | 9,410 ₹1.3 L | 8,000 ₹1.1 L | 9,000 ₹1.2 L | 9,317.25 ₹1.3 L | 8,900 ₹1.2 L |
| 8.00 | M&L for providing, cement concrete 1:2:4 type B-2 in sunken portion, kerbs or mud stop, rounded or chamfered on edges as in coping rough finish without using extra cement complete all as specified and directed. | 3 | Cum | 9,429 ₹28,287 | 9,325 ₹27,975 | 9,000 ₹27,000 | 9,830 ₹29,490 | 8,500 ₹25,500 | 10,000 ₹30,000 | 9,731.35 ₹29,194.05 | 9,500 ₹28,500 |
| 9.00 | M&L for rendering 10 mm thick in cement mortar (1:4) over sunken floor mixed with WPC as per manufacturer’s instructions, finished even and smooth without using extra cement including preparation of surfaces complete all as specified and directed.
(Note : WPC shall be measured and paid separately) | 30 | Sqm | 260 ₹7,800 | 265 ₹7,950 | 248 ₹7,440 | 272 ₹8,160 | 300 ₹9,000 | 200 ₹6,000 | 269.2 ₹8,076 | 250 ₹7,500 |
| 10.00 | M&L for 3 mm thick APP based polymeric membrane, minimum weight 3Kg/Sqm, reinforced with polyester non wooven fabric (weight not less than 150 gms/sqm) over a coat of blown bitumen primer @ 0.30 Kg/Sqm and bonded completely with torch application with side over lap 75 mm and end lap minimum 100 mm and sealing over lap and joints as per manufacturer's instruction complete all as specified and directed. | 30 | Sqm | 660 ₹19,800 | 652 ₹19,560 | 580 ₹17,400 | 628 ₹18,840 | 700 ₹21,000 | 600 ₹18,000 | 621.15 ₹18,634.50 | 600 ₹18,000 |
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
16 Apr 2026, 6:00 pmClosed
Garrison Engineer
GE (I) R and D Chandipur, Post-Chandipur, PIN-756025
REPAIR AND CLEANING TO SEWAGE LINE, SEPTIC TANK, MANHOLES, RAIN WATER PIPES INCLUDING TOILETS, SUNKEN FLOORS, SANITARY FITTING, PLUMBING CERTAIN ASSOCIATED BR WORKS AT TECH AREA, LAUNCH COMPLEXES, TRACKING STATIONS, SITE A, B C, KUMARPUR
2026_MES_757817_1
8277/A/E8
Open Tender
Civil Works
180 days
GE (I) R AND D Chandipur
As per Tender Documents
9 documents required · 9 mandatory
₹500
GE (I) R and D Chandipur, Post-Chandipur, PIN-7560
₹90,000
Yes
15 May 2026
26 Mar 2026
23 Apr 2026
26 Mar 2026
16 Apr 2026
9 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cleaning of sweage line of any dia of bore of pipe and drain by rodding or split bamboo etc including flushing with water complete all as specified and directed by Eng-in-Charge. | |||||
| 2Cleaning of blockage of wash hand basin, kitchen, bathroom floor trap, gutter and water closet etc complete all as specified and directed by Eng-in-Charge. | |||||
| 3Taking out deposited sludge from manholes, septic tanks etc any depth from top of manhole, septic tanks etc and pumping out sewage water including cutting of bushes and removing of sludge from bottom of manhole, septic tanks etc and removing to a distance 50 m and covering of the deposited sludge with excavated earth including spreading of bleaching powder @ 1.00 Kg/Sqm (for disinfection purpose) over deposited sludge before earth spreading including sweeping and cleaning with water complete all as specified and directed by Eng-in-Charge.Note- Volume of sludge will be measured for payment purposes. (Note for Ser No 1 to 3 : Contractor shall provide sweeper and his helper to attend the day to day complaints on all working days). | |||||
| 4Cleaning of the service tanks and from mouths of circulating pipes, etc. of capacity upto 500 liters twice (as directed) installed on roofs at 2nd, 3rd, or 4th stories of building at various places by emptying the tanks, by removing the scale and other all other foreign materials deposited on side wall and bottom of the tanks by scraping and brushing with wire brush and cleaning with bleaching powder slurry and allowed to dry and then washing and cleaning the tank with fresh water including refixing the top cover of tank properly after cleaning and writing letters such as details of the tanks like date of cleaning, capacity of tank with synthetic enamel paint with letter size 10cm high in black colour, over a thick of size 60x 30mm complete all as specified and directed by Eng-in-Charge. | |||||
| 5Cleaning of the service tanks and from mouths of circulating pipes, etc. of capacity upto 1000 liters twice (as directed) installed on roofs at 2nd, 3rd, or 4th stories of building at various places by emptying the tanks, by removing the scale and other all other foreign materials deposited on side wall and bottom of the tanks by scraping and brushing with wire brush and cleaning with bleaching powder slurry and allowed to dry and then washing and cleaning the tank with fresh water including refixing the top cover of tank properly after cleaning and writing letters such as details of the tanks like date of cleaning, capacity of tank with synthetic enamel paint with letter size 10cm high in black colour, over a thick of size 60x 30mm complete all as specified and directed by Eng-in-Charge. | |||||
| 6M&L for taking down existing WC/EWC of any description including PCC, tilling of sunken portion complete including preparation of surface to receive plastering and removal of debris outside complete all as specified and directed by Eng-in-Charge. | |||||
| 7M&L for providing cement concrete 1:5:10 in filling of sunken portion type E-2 (using 40 mm graded brick bats) complete all as specified and directed. | |||||
| 8M&L for providing, cement concrete 1:2:4 type B-2 in sunken portion, kerbs or mud stop, rounded or chamfered on edges as in coping rough finish without using extra cement complete all as specified and directed. | |||||
| 9M&L for rendering 10 mm thick in cement mortar (1:4) over sunken floor mixed with WPC as per manufacturer’s instructions, finished even and smooth without using extra cement including preparation of surfaces complete all as specified and directed. (Note : WPC shall be measured and paid separately) | |||||
| 10M&L for 3 mm thick APP based polymeric membrane, minimum weight 3Kg/Sqm, reinforced with polyester non wooven fabric (weight not less than 150 gms/sqm) over a coat of blown bitumen primer @ 0.30 Kg/Sqm and bonded completely with torch application with side over lap 75 mm and end lap minimum 100 mm and sealing over lap and joints as per manufacturer's instruction complete all as specified and directed. | |||||
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf