Tender Value
₹18 L
EMD Value
₹1 L
Closing Date
25 Sept 2020, 5:00 pmClosed
PRINCIPAL
DESHBANDHU COLLEGE, KALKAJI, NEW DELHI-110019
HVAC Works Equipment Schedule VRV or VRF with Cassette Unit Scope of work includes Supply and Installation and Testing and Commissioning of the following items of work High Side Equipment Low Side Y Joint and Installation
2020_DU_582724_1
F8/DBC/Build/ETender/2020/011
Open Tender
Civil Works
Works
45 days
DESHBANDHU COLLEGE, KALKAJI, NEW DELHI-110019
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Principal, Deshbandhu College, Kalkaji, New Delhi
₹1 L
Yes
1 Oct 2020
11 Sept 2020
28 Sept 2020
11 Sept 2020
25 Sept 2020
11 Sept 2020
11 Sept 2020 - 25 Sept 2020
Amount
Supply of Heat Pump including lifting & shifting of type Variable Refrigerant flow system comprising of the following specification, connected to multiple indoor as per the required configuration. The required power supply will be 3 phase 440 ± 10% at the outdoors. 100% DC Inverter based Scroll Compressor only, connectable to multiple indoor units as per specification. Outdoor unit shall be factory assembled weather proof casing constructed from heavy gauge mild steel & shall have 100% DC Inverter Scroll Compressor in each module & with Top Air Discharge through, 4-way Air Intake The Unit Shall have liquid injection facility in order to achive no deration in cooling capacity upto 45 deg C temp. The unit shall have 2 stage deep sub-cooling circuit and cross oil return technology, should be equipped with double EEV control design & four way air return heat exchanger design. The outdoor unit should contain error code LED display for ease of operation.Air supply chamber and equipment chamber should be separate. Each comprressor should have Oil Separator for safer operation. The system should be equipped with eco-friendly refrigerant R410a The system should be of Heat Pump Type & should also be suitable for operation within the ambient temperature range of -05 ºC to 50º C The outdoor units shall be complete with safety devices. The outdoor unit should be fitted with low noise aero spiral design fan with multiple speed DC motor and large airflow and should be designed to operate compressor-linking technology. The unit should also be capable to deliver 70 pa external static pressure to meet long exhaust duct connection requirement & to avoid short cycling of hot exhaust air. Oudoor units to have 5 years warranty on compressor.
16 HP - Top Discharge with Scroll Compressor
12 HP - Side Discharge with Rotary Compressor
VRF Indoors Supply & lifting shifting of Ceiling Mounted Duct Type VRF Indoor units equipped with pure copper evaporator coils & will be configured with the above outdoors. The required power supply will be 1 phase 220 ± 10% at every indoor location. The Indoor Units should be complete with electronic expansion valve with BLDC fan motor, controls and insulated drain pain with inbuilt drain pump & cordless remote controller with LED Display.
Mini 4-Way Cassette 0.8 TR
Round Way Cassette 1.6 TR
Round Way Cassette 2.6 TR
Round Way Cassette 3.2 TR
Supply & lifting shifting of Hi-wall Mounted type VRF Indoor units equipped with pure copper evaporator coils & will be configurated with the above outdoors. The required power supply will be 1 phase 220 ± 10% at every indoor location. The Indoor Units should be complete with Electronic Expansion Valve with BLDC fan motor, controls, LED Disply on Indoor & cordless remote controller with LED Display
Wall Mounted 0.6 TR
Controllers Corded Controllers
Centralized Controllers Central controllers with Adapter
Supply of Y-Joints
Installation, Testing & Commissioning of Outdoor Units & Indoor Units Installation, Testing & Commissioning of outdoor units.
Installation, Testing & Commissioning of cassette VRF Indoor units
0.8 TR - Mini 4-Way Cassette Unit with Panel
1.6 TR - Round Way Cassette Unit with Panel
2.6 TR - Round Way Cassette Unit with Panel
3.2 TR - Round Way Cassette Unit with Panel
Installation, Testing & Commissioning of Wall Mounted Type Split VRF Indoor units
0.6 TR - Wall Mounted Unit
Installation, Testing & Commissioning of Central Controllers
Y-Branches
Installation pf Y-Joints & Gather Pipe
Refrigerant Piping Works
Supply, Installation, Testing & Commissioning of refrigerant piping for the air conditioning system, shall be constructed from annealed pipes and hard drawn copper refrigerant pipes with copper fittings including Nitrile Insulation tubes over refrigerant pipes. It also includes supports to hang the copper pipes.
DRAIN PIPING
Supply,installation,testing and commissioning of PVC Condensate Drain Piping for the units.
Pipe Size - 25mm
Pipe Size - 32mm
CABLES
Supply, Installation of shielded copper material Communication cable and passed under PVC conduit of size 2C X 0.75-1.5 Sqmm.
SITC of MS Support for Outdoor Units with duly painted & fitted with rubber pads.
MS Stand for 16 HP MRV for Outdoor Units
MS Stand for 12 HP MRV for Outdoor Units
Extra Refrigerants
Supply of Extra Refrigerants for commissioning the system
NIRMAAN TRADE GROUP
ELITE AIRCON
TRANSCEND CONTRACTS PVT. LTD.
L N ENTERPRISES
GAYATRI AIRCON PVT LTD
AC WORLD
SHARAD INSULATIONS AND INTERIORS PVT. LTD.
INDIAN REFRIGERATION
AIR MOVEMENT AND CONTROL SYSTEM PRIVATE LIMITED
MARK ENGINEERING INC
Classic Air Conditioning Co
Talson Engineers
Arctic Engineering Services
MANALI ENGINEERING INDIA
ENVICAIR ENGINEERS PVT LTD
Concept Aircon
Sujit Electricals and Airconditioning Works
SMART CITY ENTERPRISES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .