Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹14.4 LAccepted-Finance | ₹14.4 L | L-1 | Accepted-Finance Lowest rates |
| 2 | L-2₹16.3 L+₹1.8 L (12.6%)Rejected-Finance | ₹16.3 L+₹1.8 L (12.6%) | L-2 | Rejected-Finance Not Lowest |
| 3 | L-3₹18.7 L+₹4.3 L (29.5%)Rejected-Finance | ₹18.7 L+₹4.3 L (29.5%) | L-3 | Rejected-Finance Not Lowest |
| 4 | L-4₹20.0 L+₹5.5 L (38.3%)Rejected-Finance | ₹20.0 L+₹5.5 L (38.3%) | L-4 | Rejected-Finance Not Lowest |
| 5 | L-5₹22.9 L+₹8.4 L (58.4%)Rejected-Finance A 45 NTPC VIDYUT NAGAR DADRI GB NAGAR 201008 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201008 | ₹22.9 L+₹8.4 L (58.4%) | L-5 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | M/S CHAUHAN ENGINEERING WORKS L2 | M/S UNIVERSAL ENGG.CO L3 | M/s Power Tech Engineering Co. L5 | M/S SADHVI ENTERPRISES L4 | M/S R.K.S. ENGG. CO. L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Round the clock lifting and shifting of coal Mill rejects spilled out from Pyrite Hopper and Mills (at ‘0’ Meter) of Unit # 8 & 9, 2X250MW, HTPS, Kasimpur to Coal yard of old Plant / 2X250 MW Plant or other specified places within the HTPS, Plant. | 7,500 | m³ | 160 ₹12,00,000 | 175 ₹13,12,500 | 225 ₹16,87,500 | 195 ₹14,62,500 | 138 ₹10,35,000 Lowest |
| 2.00 | Filling and shifting of coal Mill reject from SILO system of Mill reject system of Unit # 8 & 9, 2X250MW, HTPS, Kasimpur to Coal yard of old Plant/2x250 MW Plant or other specified places within the HTPS, Plant. | 334 | m³ | 49 ₹16,366 | 70 ₹23,380 | 85 ₹28,390 | 70 ₹23,380 | 30 ₹10,020 Lowest |
| 3.00 | Cleaning of mill floor (‘0’ & ‘3.5’ meter), mill associated auxiliaries, pulverize coal pipes, structure of mill, duct connected to mill at 3.5 meter floor, classifier top, Removing of settled coal/coal dust at Hot air gate/cold air gate and its platform, and ID/FD/ PA/Seal air fan foundation floors of Unit # 8. | 244 | Job | 533 ₹1,30,052 | 650 ₹1,58,600 | 695 ₹1,69,580 | 628 ₹1,53,232 | 520 ₹1,26,880 Lowest |
| 4.00 | Cleaning of mill floor ('0' & '3.5' meter), mill associated auxiliaries, pulverize coal pipes, structure of mill, duct connected to mill at 3.5 meter floor, classifier top, Removing of settled coal/coal dust at Hot air gate/cold air gate and its platform, and ID/FD/ PA/Seal air fan foundation floors of Unit # 9. | 244 | Job | 533 ₹1,30,052 | 650 ₹1,58,600 | 695 ₹1,69,580 | 628 ₹1,53,232 | 520 ₹1,26,880 Lowest |
| 5.00 | Cleaning of Feeder floor & associated structure to feeder floor of Unit # 8 . | 244 | Job | 240 ₹58,560 Lowest | 340 ₹82,960 | 360 ₹87,840 | 320 ₹78,080 | 250 ₹61,000 |
| 6.00 | Cleaning of Feeder floor & associated structure to feeder floor of Unit # 9. | 244 | Job | 240 ₹58,560 Lowest | 340 ₹82,960 | 360 ₹87,840 | 320 ₹78,080 | 250 ₹61,000 |
| 7.00 | Removal of major chocking of bowl mill & center pipe of bowl mill (From feeder outlet gate to liner body of mill) of Unit # 8. | 6 | Job | 1,100 ₹6,600 | 1,355 ₹8,130 | 1,450 ₹8,700 | 1,290 ₹7,740 | 390 ₹2,340 Lowest |
| 8.00 | Removal of major chocking of bowl mill & center pipe of bowl mill (From feeder outlet gate to liner body of mill) of Unit # 9. | 6 | Job | 695 ₹4,170 | 1,355 ₹8,130 | 1,450 ₹8,700 | 1,290 ₹7,740 | 390 ₹2,340 Lowest |
| 9.00 | Removal of major chocking of Coal feeder of Unit # 8. | 6 | Job | 695 ₹4,170 | 1,025 ₹6,150 | 1,190 ₹7,140 | 985 ₹5,910 | 390 ₹2,340 Lowest |
| 10.00 | Removal of major chocking of Coal feeder of Unit # 9. | 6 | Job | 465 ₹2,790 | 1,025 ₹6,150 | 1,190 ₹7,140 | 985 ₹5,910 | 390 ₹2,340 Lowest |
Tender Value
₹21.3 L
EMD Value
₹21,500
Closing Date
12 Aug 2025, 4:00 pmClosed
Superintending Engineer
Office of SE, OMC-II, DTPS, HTPS, Kasimpur, Aligarh (U.P.)
Round the clock lifting and shifting of CMR, General Cleaning and removing of choking from Mills of Unit-8 and 9, DTPS, HTPS, Kasimpur, Aligarh
2025_RVUNL_1055123_1
ET-12/OMC-II/BMD-II/DTPS/25-26
Open Tender
Power/Energy Projects/Products
Fixed-rate
243 days
Kasimpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,596
SAO, EPAD, HTPS
₹21,500
22 Aug 2025
8 Jul 2025
13 Aug 2025
8 Jul 2025
12 Aug 2025
8 Jul 2025
8 Jul 2025 - 12 Aug 2025
Amount
Round the clock lifting and shifting of coal Mill rejects spilled out from Pyrite Hopper and Mills (at ‘0’ Meter) of Unit # 8 & 9, 2X250MW, HTPS, Kasimpur to Coal yard of old Plant / 2X250 MW Plant or other specified places within the HTPS, Plant.
Filling and shifting of coal Mill reject from SILO system of Mill reject system of Unit # 8 & 9, 2X250MW, HTPS, Kasimpur to Coal yard of old Plant/2x250 MW Plant or other specified places within the HTPS, Plant.
Cleaning of mill floor (‘0’ & ‘3.5’ meter), mill associated auxiliaries, pulverize coal pipes, structure of mill, duct connected to mill at 3.5 meter floor, classifier top, Removing of settled coal/coal dust at Hot air gate/cold air gate and its platform, and ID/FD/ PA/Seal air fan foundation floors of Unit # 8.
Cleaning of mill floor ('0' & '3.5' meter), mill associated auxiliaries, pulverize coal pipes, structure of mill, duct connected to mill at 3.5 meter floor, classifier top, Removing of settled coal/coal dust at Hot air gate/cold air gate and its platform, and ID/FD/ PA/Seal air fan foundation floors of Unit # 9.
Cleaning of Feeder floor & associated structure to feeder floor of Unit # 8 .
Cleaning of Feeder floor & associated structure to feeder floor of Unit # 9.
Removal of major chocking of bowl mill & center pipe of bowl mill (From feeder outlet gate to liner body of mill) of Unit # 8.
Removal of major chocking of bowl mill & center pipe of bowl mill (From feeder outlet gate to liner body of mill) of Unit # 9.
Removal of major chocking of Coal feeder of Unit # 8.
Removal of major chocking of Coal feeder of Unit # 9.
Removal of major chocking of Coal feeder with belt running on no coal of Unit # 8.
Removal of major chocking of Coal feeder with belt running on no coal of Unit # 9.
Cleaning of P.A. duct internally from hot air gate to mill side liner body of Unit # 8.
Cleaning of P.A. duct internally from hot air gate to mill side liner body of Unit # 9.
M/S CHAUHAN ENGINEERING WORKS (BID ID -5394525)
M/S UNIVERSAL ENGG.CO (BID ID -5400120)
M/S SADHVI ENTERPRISES (BID ID -5400149)
M/s Power Tech Engineering Co. (BID ID -5400141)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .